Skip to content
PlanIndex Get alerts
Menu

Planning application

53 Paget Road

Granted Leicester 20211297 Operational development - full application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of Condition 5: (no more than 7 residents) attached to planning permission 20202049 to allow 8 residents (Sui Generis): Change of use from dwelling house (Class C3) to house in multiple occupation for more than 6 persons (Sui Generis) and construction of dormer to front and rear; retrospective application for construction of single storey extension and canopy to rear; alterations

As published by the council, reference 20211297

Application record

Reference
20211297
Type
Operational development - full application
Status
Determined
Decision
Granted As published: Conditional approval
Received
21 May 2021
Validated
19 Nov 2021
Decided
13 Jan 2022
Ward
Fosse
Decision by
Delegated
Postcode
LE3 5HN

Site history

Applications at this address on the Leicester register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 20200156 Granted

    53 Paget Road

    Change of use from dwelling house (Class C3) to house in multiple occupation for more than 6 persons (7 bed) (Sui Generis) and construction of dormer to rear; retrospective application for construction of single storey extension and canopy to rear; alterations (amended plans 10/09/2020)

    Decided 25 Sep 2020 Full applications

Timeline

Dates from the published record

  1. 21 May 2021

    Received by Leicester

  2. 19 Nov 2021

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jan 2022

    Decision issued: Conditional approval

  4. 8 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Leicester granted permission on 13 January 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 53 Paget Road

    20200156 Submitted 23 Jan 2020 50 yards away

    Change of use from dwelling house (Class C3) to house in multiple occupation for more than 6 persons (7 bed) (Sui Generis) and construction of dormer to rear; retrospective application for construction of single storey extension and canopy to rear; alterations (amended plans 10/09/2020)

    Granted Full applications Extension Loft or dormer 32 docs
    Small domestic
  • 172 Fosse Road North

    20260505 Submitted 14 Apr 2026 100 yards away

    Approval of details reserved by Condition 4 (noise details) attached to planning permission 20251299

    Refused Conditions 6 docs
  • 20 Battenberg Road

    20260272 Submitted 27 Feb 2026 100 yards away

    Change of Use from Dwellinghouse (Class C3) to Children’s Home for one child (Class C2)

    Refused Full applications 9 docs
    Domestic
  • 160 Fosse Road North

    20210797 Submitted 5 Apr 2021 150 yards away

    Part change of use of first floor and part of ground floor from offices ancillary to retail (Class A1) to 3 flats (3 x 1 bed) (Class C3) (Planning Permission granted on appeal 28 October 2021)

    Refused Full applications New dwelling 3 docs
    Several homes
  • 36 Mantle Road

    20212272 Submitted 6 Sep 2021 150 yards away

    Conversion of existing garage to living accommodation; construction of first floor extension at rear of flats (Class C3); (Amended 24/01/2022)

    Granted Full applications New dwelling Extension 12 docs
  • Petrol Filling Station, 223 Fosse Road North

    20260994 Submitted 29 Jun 2026 150 yards away

    96% historically approved · decision due ~25 Aug

    Notifications of works to three (3) trees with tree protection order. (TPO 275)

    Awaiting decision Trees 1 doc

In Leicester

  • 20251275 Granted

    176-180 Loughborough Road

    Demolition of part of rear; change of use from former police station (Sui Generis) to 6 flats (4x1bed) (2x2bed)(Class C3); construction of first floor extension at rear; alterations to roof at front; associated car parking; bin and cycle storage; boundary treatment; alterations (Amendments received)

    Received 1 Aug, published by the council 22 Jul 2026 Full applications
  • 20261147 Granted

    3 Romway Avenue

    Construction of single storey extension at front and rear; first floor extension at side; increase in height of existing two-storey side extension; construction of hipped roof over existing two storey side extension; alterations to dwellinghouse (Class C3)

    Received 3 Aug, published by the council 27 Aug 2026 Full applications
  • 20261109 Granted

    65 Stoughton Drive North

    Construction of single storey extension at rear; alterations to dwellinghouse (Class C3)

    Received 24 Jul, published by the council 14 Aug 2026 Full applications
  • 20261018 Granted

    37 Ashfield Road

    Construction of single storey extension at rear with raised patio; alterations to the house (Class C3)

    Received 6 Jul, published by the council 14 Aug 2026 Full applications
  • 20261183 Granted

    12 Bunten Green

    Construction of single storey extension to rear of dwellinghouse (Class C3)

    Received 7 Aug, published by the council 9 Sep 2026 Full applications