Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Fulwood Drive Morecambe Lancashire LA4 6QU

Decided Lancaster 26/00506/FUL Full applications

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Erection of a single storey rear extension

As published by the council, reference 26/00506/FUL

Application record

Reference
26/00506/FUL
Category
Full applications
Status
Decided
Received
15 May 2026
Validated
15 May 2026
Ward
Torrisholme Ward
Parish
Morecambe
Postcode
LA4 6QU

Timeline

Dates from the published record

  1. 15 May 2026

    Received by Lancaster

  2. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Morecambe

28 applications on PlanIndex · 88% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 St Annes Avenue Morecambe Lancashire LA4 6RE

    23/00312/PAH Submitted 15 Mar 2023 27m away

    Erection of a 4.50 metre deep, single storey rear extension with a maximum roof height of 3.58 metres and a maximum eaves heights of 2.72 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 42 Walton Avenue Morecambe Lancashire LA4 6SH

    23/01491/PAH Submitted 27 Dec 2023 113m away

    Erection of a 3.33 metre deep, single storey rear extension with a maximum roof height of 2.63 metres and a maximum eaves heights of 2.63 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 65 Kayswell Road Morecambe Lancashire LA4 6PY

    21/00518/FUL Submitted 27 Apr 2021 194m away

    Construction of a hip to gable extension and construction of a dormer extension to the front elevation

    Granted Full applications Extension Loft or dormer 4 docs
  • 51 Low Lane Morecambe Lancashire LA4 6PP

    22/00528/FUL Submitted 26 Apr 2022 235m away

    Installation of a raised roof and construction of hip to gable extensions with a rear dormer extension

    Granted Full applications Extension Loft or dormer 7 docs
  • 10 Michaelson Avenue Morecambe Lancashire LA4 6SE

    22/01598/FUL Submitted 22 Dec 2022 273m away

    Erection of detached garage

    Granted Full applications 5 docs
  • 103 Bare Lane Morecambe Lancashire LA4 6RP

    23/00206/FUL Submitted 20 Feb 2023 281m away

    Demolition of existing garage and erection of a replacement outbuilding

    Granted Full applications Demolition 7 docs

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications