Skip to content
PlanIndex Get alerts
Menu

Planning application

Barn At The Rear Of 8 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

Granted Lancaster 25/01147/FUL Full Application

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Relevant demolition of part of existing agricultural buildings

As published by the council, reference 25/01147/FUL

Application record

Reference
25/01147/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
24 Oct 2025
Validated
24 Oct 2025
Decided
17 Mar 2026
Ward
Overton Ward
Parish
Overton
Decision by
Delegated Decision
Postcode
LA3 3HR

Site history

Applications at this address on the Lancaster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/01350/LB Granted

    Barn At The Rear Of 8 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

    Listed building application for the demolition of part of existing agricultural buildings

    Decided 17 Mar 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 24 Oct 2025

    Received by Lancaster

  2. 17 Mar 2026

    Decision issued: Application Permitted

  3. 26 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

53 applications on PlanIndex · across 2 councils · 85% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Lancaster granted permission on 17 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Barn At The Rear Of 8 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

    25/01350/LB Submitted 19 Dec 2025 0m away

    Listed building application for the demolition of part of existing agricultural buildings

    Granted Heritage and listed buildings Demolition 14 docs
  • 1 The Lane Sunderland Point Morecambe Lancashire LA3 3HS

    22/01273/FUL Submitted 14 Oct 2022 25m away

    Installation of solar PV slates to the front elevation and erection of outbuilding to create ancillary accommodation in association with 1 The Lane

    Refused Full applications 12 docs
  • 3 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

    24/00205/NMA Submitted 19 Feb 2024 40m away

    Non-material amendment to planning permission 23/01038/FUL to change the finish of the garage from stone to roughcast render and for revisions to the French door/utility/boot room/bay window configurations

    Withdrawn Amendments Windows or glazing
  • 1 The Lane Sunderland Point Morecambe Lancashire LA3 3HS

    22/01274/LB Submitted 14 Oct 2022 92m away

    Listed building application for the installation of solar PV slates to the front elevation and removal of first floor ceiling and installation of insulation at rafter level

    Refused Heritage and listed buildings 10 docs
  • 3 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

    23/01038/FUL Submitted 7 Sep 2023 100m away

    Demolition of existing 2 storey side extension and rear porch and extension of raised terrace, erection of a single storey side extension, installation of new first floor window to northern elevation, replacement windows and doors, installation of a flue and erection of a detached outbuilding with associated access track and parking area

    Granted Full applications Extension Demolition +1 17 docs
    Small domestic
  • 2 First Terrace Sunderland Point Morecambe Lancashire LA3 3HR

    24/00122/FUL Submitted 30 Jan 2024 157m away

    Erection of shed

    Granted Full applications 12 docs
    Small domestic

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications