Skip to content
PlanIndex Get alerts
Menu

Planning application

Canal Quarter Central Site Brewery Lane Lancaster Lancashire

Granted Lancaster 25/00973/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary change of use of vacant land to a car park with associated works

As published by the council, reference 25/00973/FUL

Application record

Reference
25/00973/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
4 Sep 2025
Validated
19 Sep 2025
Decided
2 Feb 2026
Ward
Castle Ward
Parish
Lancaster Non-Civil Parish
Decision by
Committee Decision

Timeline

Dates from the published record

  1. 4 Sep 2025

    Received by Lancaster

  2. 19 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 2 Feb 2026

    Decision issued: Application Permitted

  4. 26 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Ashton-Under-Lyne

71 applications on PlanIndex · across 12 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Canal Quarter Central Site Land To The West Of Brewery Lane Lancaster Lancashire

    25/00912/FUL Submitted 14 Aug 2025 13m away

    Part retrospective application for relevant demolition of existing buildings and associated vegetation clearance

    Granted Full applications Demolition 36 docs
  • Grand Theatre St Leonards Gate Lancaster Lancashire LA1 1NL

    26/00507/ADV Submitted 18 May 2026 16m away

    86% historically approved · decision due ~13 Jul

    Advertisement display for the installation of halo illuminated individual letter signage on the south elevation

    Decided Advertising
  • Grand Theatre St Leonards Gate Lancaster Lancashire LA1 1NL

    26/00631/LB Submitted 18 Jun 2026 16m away

    90% historically approved · decision due ~13 Aug

    Listed building application for the installation of additional beams to fly tower, replacement of fly deck, addition of secondary pin rail and replacement of ladder

    Decided Heritage and listed buildings
  • Grand Theatre St Leonards Gate Lancaster Lancashire LA1 1NL

    26/00504/LB Submitted 15 May 2026 16m away

    Listed building application for the installation of halo illuminated individual letter signage on the south elevation to match the signage previously installed on the North-East and South-West elevations

    Granted Heritage and listed buildings 16 docs
  • 2A Stonewell Lancaster Lancashire LA1 1NJ

    26/00085/FUL Submitted 22 Jan 2026 42m away

    84% historically approved · decision due ~30 Mar

    Part retrospective application for the retention of rear extension at first floor level, proposed removal of external staircase, replacement of flat roof to ground floor, reduction in height of boundary wall, installation of cladding and pitch roof to first floor, infilling of external doors and replacement window.

    Awaiting decision Full applications Extension Windows or glazing 11 docs
    Small domestic
  • 139 St Leonards Gate Lancaster Lancashire LA1 1NL

    23/01473/FUL Submitted 19 Dec 2023 45m away

    Installation of replacement windows, replacement roof and repairs to shopfront

    Granted Full applications Roofing Windows or glazing 16 docs

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications