Planning application
6 Bentham Road Lancaster Lancashire LA1 4JX
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a first floor side extension incorporating dormer extensions to front and rear elevation
As published by the council, reference 24/01148/FUL
Application record
- Reference
- 24/01148/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 16 Oct 2024
- Validated
- 16 Oct 2024
- Decided
- 11 Dec 2024
- Ward
- Scotforth East Ward
- Parish
- Lancaster Non-Civil Parish
- Decision by
- Delegated Decision
- Postcode
- LA1 4JX
Timeline
Dates from the published record
-
16 Oct 2024
Received by Lancaster
-
11 Dec 2024
Decision issued: Application Permitted
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
3 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 & 6 Bentham Road Lancaster Lancashire LA1 4JX
Erection of first floor side extension to both properties
Granted Full applications Extension 5 docs -
9 Bentham Road Lancaster Lancashire LA1 4JX
Construction of side dormer extensions
Refused Full applications Extension Loft or dormer 5 docs -
11 Slaidburn Drive Lancaster Lancashire LA1 4QX
Proposed lawful development certificate for the demolition of existing garage and erection of a single storey rear and side extension
Refused Lawful development Extension Demolition 9 docsSmall domestic -
11 Slaidburn Drive Lancaster Lancashire LA1 4QX
Erection of a 6.00 metre deep, single storey rear extension with a maximum roof height of 4.00 metres and a maximum eaves heights of 3.00 metres
Refused Prior approval Extension 4 docsSmall domestic -
20 Appletree Drive Lancaster Lancashire LA1 4QY
Demolition of existing outbuilding end erection of a single storey side/rear extension
Granted Full applications Extension Demolition 7 docsSmall domestic -
38 Bay Horse Drive Lancaster Lancashire LA1 4LA
Demolition of rear porch and erection of a single storey rear extension
Granted Full applications Extension Demolition 4 docsSmall domestic
Other full applications applications
In Lancaster
-
26/00194/FUL Granted
Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA
Change of use of agricultural land and barn into 2 dwellings with associated access
-
26/00860/FUL Awaiting decision
Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW
Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings
-
26/00852/FUL Awaiting decision
Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX
Erection of a side extension to existing storage building
-
26/00856/FUL Awaiting decision
Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX
Erection of a two storey side extension
-
26/00851/FUL Awaiting decision
Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB
Erection of a single storey front extension and alterations to access ramp