Skip to content
PlanIndex Get alerts
Menu

Planning application

39 Marine Drive Hest Bank Lancaster Lancashire LA2 6ED

Granted Lancaster 23/01047/FUL Full Application

Works: Extension Roofing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a replacement roof with front and rear extensions to create dual pitched roof and a raised terrace to the front, and works to existing garage to include erection of a single storey extension to rear, a first-floor extension above and construction of a replacement roof

As published by the council, reference 23/01047/FUL

Application record

Reference
23/01047/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
11 Sep 2023
Validated
11 Sep 2023
Decided
20 Feb 2024
Ward
Bolton And Slyne Ward
Parish
Slyne With Hest
Decision by
Delegated Decision
Postcode
LA2 6ED

Timeline

Dates from the published record

  1. 11 Sep 2023

    Received by Lancaster

  2. 20 Feb 2024

    Decision issued: Application Permitted

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Alston + Donnelly Architecture Limited Agent, an architecture practice registered in Lancaster

Active · incorporated 2013 · Lancaster

26 applications on PlanIndex · across 3 councils · 86% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Lancaster granted permission on 20 February 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 12 Rushley Mount Hest Bank Lancaster Lancashire LA2 6EE

    26/00196/FUL Submitted 18 Feb 2026 100 yards away

    Construction of hip to gable roof extensions, rear dormer extensions and erection of a front extension

    Granted Full applications Extension Loft or dormer 11 docs
  • 3 Rushley Mount Hest Bank Lancaster Lancashire LA2 6EE

    26/00269/VCN Submitted 9 Mar 2026 100 yards away

    Demolition of existing detached garage, conservatory and single storey rear extension, erection of single storey rear extension and attached rear garage (pursuant to the variation of condition 2 on planning permission 25/00262/FUL to alter footprint of garage)

    Granted Conditions Extension Demolition 5 docs
    Small domestic
  • 6 Hayfell Crescent Hest Bank Lancaster Lancashire LA2 6DX

    25/00037/PLDC Submitted 13 Jan 2025 100 yards away

    Proposed lawful development certificate for erection of single storey rear/side extension

    Granted Lawful development Extension 4 docs
    Small domestic
  • 14 Rushley Mount Hest Bank Lancaster Lancashire LA2 6EE

    24/01138/FUL Submitted 14 Oct 2024 100 yards away

    Construction of hip to gable roof extension, dormer extension to the rear, erection of single storey rear extension and front porch, roof mounted solar panels, raised patio area, alteration to land level and landscaping to allow for parking to the front

    Refused Full applications Extension Loft or dormer 9 docs
    Small domestic
  • 44 Marine Drive Slyne With Hest Lancashire

    02/00947/FUL Submitted 12 Aug 2002 150 yards away

    alterations and extensions to form sitting room, utility and toilet and garage at ground floor with master bedroom and ensuite at first floor with gallery over and creation of balcony and steps

    Granted Full applications Extension 1 doc
  • 2 Rushley Drive Hest Bank Lancaster Lancashire LA2 6EF

    24/00204/PLDC Submitted 19 Feb 2024 150 yards away

    Proposed lawful development certificate for the installation of roof lights to the north and south elevation and installation of replacement windows

    Granted Lawful development Loft or dormer Windows or glazing 10 docs

In Lancaster

  • 26/00528/FUL Decided

    New Brows Farm Carr Lane Middleton Morecambe Lancashire LA3 3LL

    Erection of extension to existing silage building

    Received 26 May, published by the council 21 Jul 2026 Full applications
  • 26/01022/FUL Awaiting decision

    Middle Cottage Back Lane Wrayton Carnforth Lancashire LA6 2QU

    Installation of air source heat pump

    Received 15 Oct, published by the council 19 Oct 2026 Full applications
  • 26/01017/FUL Awaiting decision

    185 Bare Lane Morecambe Lancashire LA4 6RR

    Demolition of existing rear conservatory, erection of single storey rear extension including roof terrace with balustrade, construction of rear roof dormer extension and a raised garden terrace

    Received 14 Oct, published by the council 19 Oct 2026 Full applications
  • 26/01013/FUL Awaiting decision

    Sellet Hall Hosticle Lane Whittington Carnforth Lancashire LA6 2QF

    Installation of 13 solar PV panels to south and east roof slopes, with associated inverter and battery storage to gable of outbuildings and installation of EV charging point to the north elevation of outbuilding

    Received 13 Oct, published by the council 19 Oct 2026 Full applications
  • 26/01005/FUL Awaiting decision

    Salt Ayre Sports Centre Doris Henderson Way Heaton With Oxcliffe Lancaster Lancashire LA1 5JS

    Construction of outdoor padel courts with canopies, boundary fencing and associated clubhouse facility

    Received 9 Oct, published by the council 19 Oct 2026 Full applications