Planning application

Lunedale House Market Street Morecambe Lancashire

Granted Lancaster 23/00173/FUL Full Application

Works: New dwelling Extension Windows or glazing Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of part of the ground floor retail units and first floor offices (Class E) to 3 apartments (Class C3) with common access from Derby Street, replacement of the upper level windows, infill a window, increase size of a window and installation of new external doors to west elevation

As published by the council, reference 23/00173/FUL

Application record

Reference
23/00173/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
13 Feb 2023
Validated
13 Feb 2023
Decided
6 Apr 2023
Ward
Poulton Ward
Parish
Morecambe
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 13 Feb 2023

    Received by Lancaster

  2. 6 Apr 2023

    Decision issued: Application Permitted

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

37 applications on PlanIndex · across 4 councils · 65% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Derby Street Morecambe Lancashire LA4 4BD

    26/00848/VCN Submitted 21 Aug 2026 26m away

    86% historically approved · decision due ~16 Oct

    Demolition of existing single storey extension and erection of a three storey rear extension and reinstatement of two tracery windows to the east elevation (pursuant to the variation of condition 5 on planning permission 23/00382/FUL to amend the wording of the condition in relation to occupancy of extension and reinstatement of tracery windows)

    Awaiting decision Extension Demolition +1
    Small domestic
  • 5 Derby Street Morecambe Lancashire LA4 4BD

    26/00041/DIS Submitted 16 Mar 2026 26m away

    Discharge of condition 3 (archaeological building recording) and 4c (render) and 4d (roof) on approved application 23/00382/FUL

    Split decision Conditions 7 docs
  • 5 Derby Street Morecambe Lancashire LA4 4BD

    26/00289/RCN Submitted 13 Mar 2026 26m away

    Removal of condition 5 on planning permission 23/00382/FUL which requires works to the tracery windows to be completed prior to use of the extension

    Refused Conditions Extension Windows or glazing 5 docs
  • 4 Lunedale House Market Street Morecambe Lancashire LA4 5DW

    23/01130/PAC Submitted 25 Sep 2023 28m away

    Prior approval for the change of use of first floor bank (Class E) into two flats (C3)

    Granted Prior approval New dwelling 12 docs
    Several homes
  • Ground Floor 4 Lunedale House Market Street Morecambe Lancashire LA4 5DW

    21/00459/ADV Submitted 15 Apr 2021 33m away

    Advertisement application for the display of a projecting sign, fascia sign with logo, and an internally illuminated ATM surround

    Granted Advertising 8 docs
  • Royal Mail Morecambe Delivery Office Market Street Morecambe Lancashire LA4 5DT

    22/01586/TCA5 Submitted 21 Dec 2022 46m away

    Fell 1 x sycamore

    Decided Trees

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications