Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Betony Morecambe Lancashire LA4 6JD

Granted Lancaster 22/01597/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey side extension

As published by the council, reference 22/01597/FUL

Application record

Reference
22/01597/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
22 Dec 2022
Validated
20 Mar 2023
Decided
26 Apr 2023
Ward
Bare Ward
Parish
Morecambe
Decision by
Delegated Decision
Postcode
LA4 6JD

Timeline

Dates from the published record

  1. 22 Dec 2022

    Received by Lancaster

  2. 20 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 26 Apr 2023

    Decision issued: Application Permitted

  4. 2 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Morecambe

100 applications on PlanIndex · across 2 councils · 88% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 76 Oak Avenue Morecambe Lancashire LA4 6HY

    22/00568/PLDC Submitted 6 May 2022 114m away

    Proposed lawful development certificate for construction of dormer extension to the rear elevation, new upper floor side window, relocation of rear door and window and blocking up of one window to the side elevation

    Granted Lawful development Extension Loft or dormer +1 5 docs
  • 14A Betony Morecambe Lancashire LA4 6JD

    21/00211/FUL Submitted 16 Feb 2021 125m away

    Erection of one detached dwellinghouse (C3) and associated access

    Granted Full applications 35 docs
    Domestic
  • 7 Chestnut Drive Morecambe Lancashire LA4 6HN

    26/00572/PLDC Submitted 4 Jun 2026 213m away

    86% historically approved · decision due ~1 Oct

    Proposed lawful development certificate for the construction of a dormer extension to the rear elevation

    Awaiting decision Extension Loft or dormer
  • 4 Pinewood Avenue Morecambe Lancashire LA4 6HW

    22/00781/PLDC Submitted 23 Jun 2022 217m away

    Proposed lawful development certificate for demolition of existing conservatory and erection of a replacement single storey rear extension

    Granted Lawful development Extension Demolition 3 docs
    Small domestic
  • 4 Webster Grove Morecambe Lancashire LA4 6QQ

    22/00230/FUL Submitted 24 Feb 2022 253m away

    Demolition of existing sun room and erection of single storey rear/side extension

    Granted Full applications Extension Demolition 3 docs
    Small domestic
  • 7 Happy Mount Court Morecambe Lancashire LA4 6HX

    26/00550/PLDC Submitted 2 Jun 2026 303m away

    86% historically approved · decision due ~28 Jul

    Proposed lawful development certificate for demolition of existing conservatory and porch to the rear, erection of a single storey rear extension and single storey rear/side extension to form a replacement porch

    Decided Extension Demolition
    Small domestic

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications