Skip to content
PlanIndex Get alerts
Menu

Planning application

38 Oak Drive Halton Lancaster Lancashire LA2 6QL

Granted Lancaster 22/00160/FUL Full Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey side and rear extension with overhanging roof, construction of balustrade, external steps and raised patio area to the rear, construction of a dormer extension to the front elevation and construction of a ramp to the side

As published by the council, reference 22/00160/FUL

Application record

Reference
22/00160/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
8 Feb 2022
Validated
8 Feb 2022
Decided
13 Apr 2022
Ward
Halton-with-Aughton Ward 2015
Parish
Halton With Aughton
Decision by
Delegated Decision
Postcode
LA2 6QL

Timeline

Dates from the published record

  1. 8 Feb 2022

    Received by Lancaster

  2. 13 Apr 2022

    Decision issued: Application Permitted

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Morecambe

136 applications on PlanIndex · across 6 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Oak Drive Halton Lancaster Lancashire LA2 6QJ

    26/00588/FUL Submitted 8 Jun 2026 107m away

    84% historically approved · decision due ~6 Aug

    Erection of a single storey front extension/porch

    Awaiting decision Full applications Extension
    Small domestic
  • 26 Beech Road Halton Lancaster Lancashire LA2 6QQ

    25/01093/FUL Submitted 9 Oct 2025 114m away

    Erection of a single storey rear extension and construction of a dormer extension to the front roof elevation

    Granted Full applications Extension Loft or dormer 8 docs
    Small domestic
  • 35 Beech Road Halton Lancaster Lancashire LA2 6QQ

    24/01114/FUL Submitted 9 Oct 2024 159m away

    Erection of a single storey rear extension with external steps

    Granted Full applications Extension 5 docs
    Small domestic
  • 35 Beech Road Halton Lancaster Lancashire LA2 6QQ

    24/01113/PLDC Submitted 9 Oct 2024 159m away

    Proposed lawful development certificate for the construction of a dormer extension to the rear elevation

    Granted Lawful development Extension Loft or dormer 5 docs
  • 10-14 Arrow Lane Halton Lancaster Lancashire LA2 6QN

    22/00573/PLDC Submitted 9 May 2022 230m away

    Proposed lawful development certificate for the decommission of the existing septic tank owned and used by no's 14 and 12 Arrow Lane, and laying of new pipe work connecting into existing drain at no. 10 Arrow Lane

    Granted Lawful development 4 docs
  • 11 Penny Stone Road Halton Lancaster Lancashire LA2 6QE

    20/00865/PLDC Submitted 12 Aug 2020 233m away

    Proposed lawful development certificate for the erection of a single storey rear extension

    Granted Lawful development Extension 4 docs
    Small domestic

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications