Skip to content
PlanIndex Get alerts
Menu

Planning application

254 Torrisholme Road Lancaster Lancashire LA1 2TU

Granted Lancaster 21/00520/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a part single storey rear extension and part first floor rear extension

As published by the council, reference 21/00520/FUL

Application record

Reference
21/00520/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
27 Apr 2021
Validated
14 May 2021
Decided
7 Sep 2021
Ward
Skerton West Ward 2015
Parish
Lancaster
Decision by
Delegated Decision
Postcode
LA1 2TU

Timeline

Dates from the published record

  1. 27 Apr 2021

    Received by Lancaster

  2. 14 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 7 Sep 2021

    Decision issued: Application Permitted

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 296 Torrisholme Road Lancaster Lancashire LA1 2TU

    26/0163/TPO5 Submitted 19 Aug 2026 60m away

    86% historically approved · decision due ~14 Oct

    Remove dead Walnut Tree

    Awaiting decision Trees
  • 127 Torrisholme Road Lancaster Lancashire LA1 2TZ

    22/00179/FUL Submitted 10 Feb 2022 67m away

    Demolition of existing single storey rear extension, erection of asingle storey side/rear extension, construction of a dormer extension to the rear elevation, and a hip to gable roof extension

    Granted Full applications Extension Loft or dormer +1 8 docs
    Small domestic
  • 78 Lymm Avenue Lancaster Lancashire LA1 5HR

    21/00994/PAH Submitted 2 Aug 2021 101m away

    Erection of a 3.522 metre deep, single storey rear extension with a maximum roof height of 3.336 metres and a maximum eaves heights of 2.845 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 270 Torrisholme Road Lancaster Lancashire LA1 2TU

    25/0206/TPO Submitted 6 Oct 2025 103m away

    Sycamore - Crown raise to 4m above ground level

    Granted Trees 3 docs
  • 58 Lymm Avenue Lancaster Lancashire LA1 5HL

    21/00666/PLDC Submitted 25 May 2021 113m away

    Proposed lawful development certificate for the construction of a hip to gable extension, dormer extension to the rear elevation and installation of two rooflights to the front elevation

    Granted Lawful development Extension Loft or dormer 4 docs
  • 51 Lymm Avenue Lancaster Lancashire LA1 5HL

    20/00864/FUL Submitted 11 Aug 2020 140m away

    Erection of a single storey rear extension and retrospective application for retention of detached outbuilding

    Granted Full applications Extension 8 docs
    Small domestic

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications