Planning application
Dragons Head Hotel Main Street Whittington Carnforth Lancashire LA6 2NY
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of public house (Sui Generis) to a dwelling (C3), relevant demolition of outhouses and erection of a double garage
As published by the council, reference 21/00032/FUL
Application record
- Reference
- 21/00032/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 12 Jan 2021
- Validated
- 11 Feb 2021
- Decided
- 16 Mar 2022
- Ward
- Upper Lune Valley Ward
- Parish
- Whittington
- Decision by
- Delegated Decision
- Postcode
- LA6 2NY
Timeline
Dates from the published record
-
12 Jan 2021
Received by Lancaster
-
11 Feb 2021
Validated
Checked as complete and ready for consideration.
-
16 Mar 2022
Decision issued: Application Permitted
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
3 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
41 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Low Hall Main Street Whittington Carnforth Lancashire LA6 2NY
84% historically approved · decision due ~19 Oct
Change of use and conversion of agricultural building into 2 dwellings, change of use of agricultural land to domestic gardens and car parking, part demolition of existing agricultural buildings to rear and alterations to access
Awaiting decision Full applications DemolitionSeveral homes -
Low Hall Main Street Whittington Carnforth Lancashire LA6 2NY
90% historically approved · decision due ~19 Oct
Listed building application for the demolition of existing lean-to and cattle building, partial rebuild of existing walls, installation of replacement roof, rooflights, flues to roof, new window openings, cladding to part rear and side elevation, and internal alterations to include construction of floors and internal walls
Awaiting decision Heritage and listed buildings Loft or dormer Roofing +2 -
Rose Cottage Main Street Whittington Carnforth Lancashire LA6 2NY
100% historically approved · decision due ~8 Sep
Holly (T1) - Reduce in height by 1/3 to aid regular topiary
Decided Trees -
Winlea Main Street Whittington Carnforth Lancashire LA6 2NY
84% historically approved · decision due ~17 Aug
Replacement of hipped roof with gable roof
Decided Full applications -
Dragons Head Hotel Main Street Whittington Carnforth Lancashire LA6 2NY
Demolition of outbuildings, conversion of barn to dwelling, erection of 3 dwellings with associated landscaping, parking and alterations to the existing access and erection of a first floor side extension over existing pub (pursuant to the removal of conditions 10 and 20 on approved application 18/00567/FUL to remove the requirement to undertake works associated with the public house prior to the commencement of the three dwellings and to allow the residential use of the barn independently of the public house and the variation of condition 15 to remove reference to condition 10 and the public house)
Granted Conditions Extension Demolition 10 docsSeveral homes -
Land Adjacent The Maltings Whittington Carnforth Lancashire LA6 2NJ
100% historically approved · decision due ~17 Jul
Acer (T1) - Fell as growing large and near to building Cherry and Rowan (G1) - Crown reduce rowan by 25% leaf cover, thin out self set cherries retaining two trees, crown reduce by 20%.
Decided Trees 3 docs
Other full applications applications
In Lancaster
-
26/00194/FUL Granted
Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA
Change of use of agricultural land and barn into 2 dwellings with associated access
-
26/00860/FUL Awaiting decision
Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW
Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings
-
26/00852/FUL Awaiting decision
Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX
Erection of a side extension to existing storage building
-
26/00856/FUL Awaiting decision
Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX
Erection of a two storey side extension
-
26/00851/FUL Awaiting decision
Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB
Erection of a single storey front extension and alterations to access ramp