Skip to content
PlanIndex Get alerts
Menu

Planning application

Cannondale Westbourne Road Lancaster Lancashire LA1 5EF

Refused Lancaster 19/01342/FUL Full Application

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Relevant demolition of existing garage, erection of replacement garage and erection of 2 single storey dwellings(C3) and retaining walls

As published by the council, reference 19/01342/FUL

Application record

Reference
19/01342/FUL
Type
Full Application
Status
Decided
Decision
Application Refused
Received
23 Oct 2019
Validated
23 Oct 2019
Decided
18 Dec 2019
Ward
Marsh Ward
Parish
Lancaster
Decision by
Delegated Decision
Postcode
LA1 5EF

Timeline

Dates from the published record

  1. 23 Oct 2019

    Received by Lancaster

  2. 18 Dec 2019

    Decision issued: Application Refused

  3. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

37 applications on PlanIndex · across 4 councils · 65% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Beechfield Westbourne Road Lancaster Lancashire LA1 5LH

    22/00315/FUL Submitted 14 Mar 2022 41m away

    Construction of dormer extensions to the front elevation, construction of terrace to the side, installation of new windows to the front, side and rear elevations and installation of solar panels on the south west (rear) facing roof

    Granted Full applications Extension Loft or dormer +1 22 docs
  • 1 Beechfield Westbourne Road Lancaster Lancashire LA1 5LH

    25/01085/FUL Submitted 7 Oct 2025 45m away

    Installation of an oriel window to the side elevation, alterations to the windows and doors, re-roof including installation of rooflights to the front and rear elevations and installation of solar panels to the rear elevation and re-rendering of property

    Granted Full applications Loft or dormer Roofing +1 8 docs
  • Westlands Westbourne Drive Lancaster Lancashire LA1 5EE

    23/0024/TPO Submitted 10 Feb 2023 46m away

    T14 Copper Beech - Crown lift and reduce long lateral branches; T16 Holly - Prune to clear access gate;, T17-T21 Lime - Remove epicormic growth, crown lift and prune away from signs and street lighting

    Granted Trees 3 docs
  • Longcroft 58 Westbourne Road Lancaster Lancashire LA1 5EF

    25/0176/TPO Submitted 26 Aug 2025 51m away

    Complete works to trees T3, T9, T10, T11, T14, T15, G1 as detailed in MWA Safety and Condition Survey (dated 26/2/2025)

    Granted Trees 4 docs
  • Longcroft 58 Westbourne Road Lancaster Lancashire LA1 5EF

    25/0192/TCA Submitted 22 Sep 2025 52m away

    Complete works to trees T16, T18, T19, T20, G1, G2, G3 as detailed in MWA Safety and Condition Survey (dated 26/2/2025)

    Granted Trees 1 doc
  • Littlebirch Westbourne Drive Lancaster Lancashire LA1 5EE

    23/00817/FUL Submitted 17 Jul 2023 54m away

    Erection of a 1.5 storey side extension, rear single storey infill extension and installation of timber fencing

    Granted Full applications Extension 16 docs
    Small domestic

In Lancaster

  • 26/00194/FUL Granted

    Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA

    Change of use of agricultural land and barn into 2 dwellings with associated access

    17 Feb 2026 Full applications
  • 26/00860/FUL Awaiting decision

    Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW

    Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings

    25 Aug 2026 Full applications
  • 26/00852/FUL Awaiting decision

    Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX

    Erection of a side extension to existing storage building

    24 Aug 2026 Full applications
  • 26/00856/FUL Awaiting decision

    Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX

    Erection of a two storey side extension

    24 Aug 2026 Full applications
  • 26/00851/FUL Awaiting decision

    Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB

    Erection of a single storey front extension and alterations to access ramp

    24 Aug 2026 Full applications