Planning application
19 Schoolhouse Lane Halton Lancaster Lancashire LA2 6QX
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single storey side/rear extension and first floor rear extension
As published by the council, reference 19/01300/FUL
Application record
- Reference
- 19/01300/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 16 Oct 2019
- Validated
- 16 Oct 2019
- Decided
- 28 Nov 2019
- Ward
- Halton-with-Aughton Ward 2015
- Parish
- Halton With Aughton
- Decision by
- Delegated Decision
- Postcode
- LA2 6QX
Timeline
Dates from the published record
-
16 Oct 2019
Received by Lancaster
-
28 Nov 2019
Decision issued: Application Permitted
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Morecambe
28 applications on PlanIndex · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
136 High Road Halton Lancaster Lancashire LA2 6QA
Erection of a two storey side extension, single storey rear extension, and front porch extension, construction of a dormer extension to the rear, and creation of an access, dropped kerb and driveway
Granted Full applications Extension Loft or dormer 14 docsSmall domestic -
197 High Road Halton Lancaster Lancashire LA2 6QB
Ash (T1) - Crown clean to remove dead, damaged or crossing branches. Remove lower epicormic growth. Reduce large lateral limb growing towards the property back to a suitable growth point.
Granted Trees 7 docs -
164 Low Road Halton Lancaster Lancashire LA2 6NU
Proposed lawful development certificate for construction of a dormer extension to the side elevation
Refused Lawful development Extension Loft or dormer 4 docs -
32 Forgewood Drive Halton Lancaster Lancashire LA2 6NY
Construction of an enlarged dormer extension to the rear, construction of a raised decked area to the rear and installation of a ground floor window to the side
Granted Full applications Extension Loft or dormer +1 8 docs -
108A High Road Halton Lancaster Lancashire LA2 6PU
Change of use of office building to dwelling (C3) including alterations to fenestration and installation of electric car charging point
Granted Full applications Windows or glazing 10 docsDomestic -
Field At Grid Reference 350809 465524 High Road Halton Lancashire
Variation of legal agreement application to amend plots 32 and 33 from shared ownership to affordable rent
Granted Conditions 3 docs
Other full applications applications
In Lancaster
-
26/00194/FUL Granted
Barn Opposite Greenways Bay Horse Road Ellel Lancaster Lancashire LA2 0QA
Change of use of agricultural land and barn into 2 dwellings with associated access
-
26/00860/FUL Awaiting decision
Jobcentre Plus Mitre House Church Street Lancaster Lancashire LA1 1JW
Erection of security fencing to the north boundary, installation of security gate/fencing to vehicular entrance and installation of mesh panels to openings
-
26/00852/FUL Awaiting decision
Kirk House Farm Main Road Over Kellet Carnforth Lancashire LA6 1DX
Erection of a side extension to existing storage building
-
26/00856/FUL Awaiting decision
Edenmount Well Lane Yealand Redmayne Carnforth Lancashire LA5 9SX
Erection of a two storey side extension
-
26/00851/FUL Awaiting decision
Halton Community Association The Centre Low Road Halton Lancaster Lancashire LA2 6NB
Erection of a single storey front extension and alterations to access ramp