Planning application
Quay Equestrian St Georges Quay Lancaster Lancashire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a portacabin to be used as temporary offices with a link to the existing building
As published by the council, reference 02/00852/FUL
Application record
- Reference
- 02/00852/FUL
- Type
- Full Application
- Status
- Registered
- Decision
- Granted As published: Application Permitted
- Received
- 16 Jul 2002
- Validated
- 16 Jul 2002
- Decided
- 3 Sep 2002
- Ward
- Castle
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
16 Jul 2002
Received by Lancaster
-
3 Sep 2002
Decision issued: Application Permitted
-
29 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Lancaster granted permission on 3 September 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Part Of Former St Georges Works (Pump House) Abram Close Lancaster Lancashire
Change of use and conversion of existing pump house and erection of front and upwards extensions to create 35 studio apartments for students (C3 use) with associated communal areas (pursuant to the variation of condition 9 on planning permission 23/00571/FUL to accommodate changes to materials and to remove reference to aluminium windows)
Refused Conditions New dwelling Extension +1 3 docs -
Part Of Former St Georges Works Abram Close Lancaster Lancashire
Discharge of condition 5 and 8 on approved application 23/00571/FUL
Split decision Conditions -
84, 85 & 86 St Georges Quay Lancaster Lancashire LA1 5JU
Proposed lawful development certificate for the erection of 3 single storey rear extensions
Granted Lawful development Extension 3 docsSmall domestic -
88 St Georges Quay Lancaster Lancashire LA1 5JU
Proposed lawful development certificate for the erection of single storey rear extension
Granted Lawful development Extension 3 docsSmall domestic -
Scaleford Care Home Lune Road Lancaster Lancashire LA1 5QT
98% historically approved · decision due ~18 Nov
T2 - Horse Chestnut Fell and replant with a native standard tree such as hornbeam.
Decided Trees -
Land At Luneside East St Georges Quay And Adajcent To 4 Hasgill Court Lancaster Lancashire LA1 5SE
Ash (T1) - Reduce branches overhanging No. 4 Hasgill Court.
Granted Trees 3 docs
Other full applications
In Lancaster
-
26/00528/FUL Decided
New Brows Farm Carr Lane Middleton Morecambe Lancashire LA3 3LL
Erection of extension to existing silage building
-
26/01022/FUL Awaiting decision
Middle Cottage Back Lane Wrayton Carnforth Lancashire LA6 2QU
Installation of air source heat pump
-
26/01017/FUL Awaiting decision
185 Bare Lane Morecambe Lancashire LA4 6RR
Demolition of existing rear conservatory, erection of single storey rear extension including roof terrace with balustrade, construction of rear roof dormer extension and a raised garden terrace
-
26/01013/FUL Awaiting decision
Sellet Hall Hosticle Lane Whittington Carnforth Lancashire LA6 2QF
Installation of 13 solar PV panels to south and east roof slopes, with associated inverter and battery storage to gable of outbuildings and installation of EV charging point to the north elevation of outbuilding
-
26/01005/FUL Awaiting decision
Salt Ayre Sports Centre Doris Henderson Way Heaton With Oxcliffe Lancaster Lancashire LA1 5JS
Construction of outdoor padel courts with canopies, boundary fencing and associated clubhouse facility