Planning application
Ashley Cooper House 25 Hillyard Street London Lambeth SW9 0NJ
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of details pursuant to condition 13 (Piling and Foundation works) for planning permission 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works) dated 10.06.2025.
As published by the council, reference 26/02269/DET
Application record
- Reference
- 26/02269/DET
- Status
- Decided
- Decision
- Granted As published: Grant Permission
- Received
- 6 Aug 2026
- Validated
- 6 Aug 2026
- Decided
- 1 Oct 2026
- Ward
- Stockwell East
- Postcode
- SW9 0NJ
Site history
Applications at this address on the Lambeth register
This site has had 3 applications since 2026: 1 approved, 0 refused.
-
26/01587/DET Decided
Ashley Cooper House 25 Hillyard Street London Lambeth SW9 0NJ
Partial approval of details pursuant to conditions 12 (sound insulation) (part A only) and condition 33 (internal water use) (part A only) of planning permission 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works) granted on 10.06.2025.
-
26/01241/DET Decided
Ashley Cooper House 25 Hillyard Street London Lambeth SW9 0NJ
Approval of details pursuant to condition 8 (Remediation) of planning permission ref : 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works) granted on 10.06.2025.
Timeline
Dates from the published record
-
6 Aug 2026
Received by Lambeth
-
15 Sep 2026
Added to PlanIndex
-
1 Oct 2026
Decision issued: Grant Permission
-
1 Oct 2026
Status changed to Decided
Previously Awaiting decision.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Lambeth granted permission on 1 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Lambeth's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Ashley Cooper House 25 Hillyard Street London SW9 0NJ
84% historically approved · decision due ~16 Nov
Approval of details pursuant to condition 4 (Part A only) (Construction drawings of all external elevations) of planning permission ref. 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works.), granted on 10.06.2025.
Awaiting decision Demolition 30 docs -
Ashley Cooper House 25 Hillyard Street London SW9 0NJ
84% historically approved · decision due ~4 Dec
Partial approval of details pursuant to condition 11a (Acoustic Report) of planning permission 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works), granted on 10.06.2025.
Awaiting decision Demolition -
Ashley Cooper House 25 Hillyard Street London SW9 0NJ
84% historically approved · decision due ~4 Dec
Approval of details pursuant to condition 19 (Surface Water Management Strategy) of planning permission 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with assoicated works), granted on 10.06.2025.
Awaiting decision Demolition -
Ashley Cooper House 25 Hillyard Street London SW9 0NJ
84% historically approved · decision due ~16 Oct
Approval of details to discharge part of condition 27 (Part A - Secured by Design Commercial guide) of planning permission ref : 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works) granted on 10.06.2025.
Decided Demolition 26 docs -
Ashley Cooper House 25 Hillyard Street London Lambeth SW9 0NJ
84% historically approved · decision due ~22 Jul
Partial approval of details pursuant to conditions 12 (sound insulation) (part A only) and condition 33 (internal water use) (part A only) of planning permission 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works) granted on 10.06.2025.
Decided Demolition 8 docs -
Ashley Cooper House 25 Hillyard Street London SW9 0NJ
84% historically approved · decision due ~16 Nov
Approval of details pursuant to condition 4 (materials) of planning permission ref. 22/04396/FUL (Demolition of existing building and erection of a part 3, set-back 4-storey building to provide 25 residential dwellings, with associated works.), granted on 10.06.2025.
Awaiting decision Demolition