Planning application
The Crown And Sceptre Streatham Hill & 1A And 3 Streatham Place London SW2
Works: Extension Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment and extension to the Public House (Sui-generis), including demolition of building at 1A and 3 Streatham Place (use class E(g)(i)) and erection of 5-storey building with a basement to provide co-living accommodation comprising 117 units (Sui-generis) and office space (use class E(g)(i)), with the provision of associated internal and external communal facilities, cycle and refuse storage, plant equipment, landscaping, and other associated works. (Re-consultation due to additional information - Design & Access statement).
As published by the council, reference 26/01394/FUL
Application record
- Reference
- 26/01394/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 6 May 2026
- Validated
- 15 Jun 2026
- Ward
- Streatham Hill West & Thornton
Timeline
Dates from the published record
-
6 May 2026
Received by Lambeth
-
15 Jun 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Lambeth took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
87 documents on file for this application
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- DAYLIGHT SUNLIGHT REPORT - INTERNAL
- DAS PART 1
- DAS PART 2
- DAYLIGHT SUNLIGHT REPORT - EXTERNAL
- EXISTING DEMOLITION PLANS - 2ND, ROOF & BASEMENT FLOOR
- PROPOSED BASEMENT PLAN
- PROPOSED FOURTH FLOOR PLAN
- PROPOSED CONTEXTUAL ELEVATIONS
- PROPOSED ELEVATION 3 AND 4
- BIODIVERSITY NET GAIN ASSESSMENT - PART 2
- BIODIVERSITY NET GAIN ASSESSMENT - PART 4
- BIODIVERSITY METRIC - TECHNICAL ANNEX 1
- PROPOSED ACCOMMODATION LIGHT ASSESSMENT
- ENERGY STATEMENT
- STRUCTURAL ENGINEERS STAGE 2 REPORT & BASEMENT IMPACT ASSESSMENT - PART 2
- EXISTING FIRST FLOOR DEMOLITION PLAN
- PROPOSED ELEVATIONS 1 AND 2
- SCHEDULE OF ACCOMMODATION
- TYPICAL ACCESSIBLE STUDIO LAYOUT
- BIODIVERSITY METRIC CALCULATION TOOL
- OUTLINE EMPLOYMENT AND SKILLS PLAN
- FLOOD RISK ASSESSMENT - PART 4
- TRAVEL PLAN
- FEASIBILITY ESTIMATE
- STRUCTURAL ENGINEERS STAGE 2 REPORT & BASEMENT IMPACT ASSESSMENT - PART 1
- PHASE I DESK STUDY - PART 1
- EXISTING SITE PLANS - 2ND, ROOF AND BASEMENT PLAN
- EXISTING GROUND FLOOR DEMOLITION PLAN
- BAY STUDY 2 - RESIDENTIAL ENTRANCE
- PROPOSED SECTION BB
- NOISE IMPACT ASSESSMENT FOR PLANT EQUIPMENT
- TREE SURVEY & ARBORICULTURAL IMPACT ASSESSMENT
- FLOOD RISK ASSESSMENT - PART 1
- FLOOD RISK ASSESSMENT - PART 3
- ENVIRONMENTAL NOISE ASSESSMENT
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOORPLAN
- PUB BASEMENT FLOOR PLAN
- TYPICAL STUDIO PLAN
- BREEAM PRE-ASSESSMENT REPORT
- DYNAMIC THEMAL MODELING
- PRELIMINARY ECOLOGICAL APPRAISAL - PART 1
- WASTE MANAGEMENT PLAN
- COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM
- APPLICATION FORM - WITHOUT PERSONAL DATA
- PROPOSED GROUND FLOOR PLAN
- PROPOSED THIRD FLOOR PLAN
- REFUSED AND CYCLE STORE PLANS
- PUB GROUND FLOORPLAN
- BREEAM PRE-ASSESSMENT REPORT (NON-DOMESTIC REFURBISHMENT..)
- CIRCULAR ECONOMY STATEMENT
- MANAGEMENT PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL - PART 2
- SOCIAL INFRASTRUCTURE ASSESSMENT
- RESIDUAL LAND VALUATION
- RESIDUAL LAND VALUATION
- EXISTING SITE PLAN - FIRST FLOOR PLAN
- EXISTING ELEVATIONS
- BAY STUDY 1 - PUB FRONT ELEVATION
- BAY STUDY 3 - REAR ELEVATION
- AIR QUALITY ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT - PART 1
- FLOOD RISK ASSESSMENT - PART 2
- FLOOD RISK ASSESSMENT - PART 4
- NOISE IMPACT ASSESSMENT FOR PLANT EQUIPMENT
- EXISTING SITE PLAN- GROUND FLOOR
- PROPOSED SITE PLAN
- PROPOSED ROOF PLAN
- COMMUNAL KITCHEN ROOM PLANS
- BIODIVERSITY NET GAIN ASSESSMENT - PART 3
- FIRE STATEMENT
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 2
- STATEMENT OF COMMUNITY INVOLVEMENT
- TREE SURVEY & CONSTRAINTS PLAN
- THE LOCATION PLAN
- SITE LOCATION PLAN
- PROPOSED SECTION A-A
- COMMUNAL ROOMS & CO-WORKING PLANS
- PART 1
- ENVIRONMENTAL NOISE IMPACT ASSESSMENT
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT - PART 1
- DETAILED SOFT & HARD LANDSCAPE PROPOSALS
- HEALTHY STREETS TRANSPORT ASSESSMENT
- URBAN GREENING FACTOR
- PHASE I DESK STUDY - PART 2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Lambeth for determination, against a statutory target of eight weeks. Over the last year Lambeth decided full applications in a median of 62 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Lambeth
-
26/01955/FUL Granted
66 South Lambeth Road London SW8 1RL
Replacement of windows and doors with like-for-like, and replacement of doors openings on rear elevation with full height windows, inset louvred panels and spandrel panel.
-
26/02127/FUL Granted
46 Mount Nod Road London SW16 2LL
Replacement of windows with double glazed timber windows.
-
26/02126/FUL Granted
64 Abbeville Road London SW4 9NE
Erection of a single storey ground floor side and rear infill extension.
-
26/02071/FUL Granted
33 Endymion Road London SW2 2BU
Replacement of timber windows with double-glazed timber windows to the front and rear elevations (amended).
-
26/02074/FUL Granted
Ujima Court Sunnyhill Road London SW16 2UG
Replacement of timber windows and doors with double-glazed timber windows and doors to all elevations.