Skip to content
PlanIndex Get alerts
Menu

Planning application

80 Kellett Road London SW2 1ED

Granted Lambeth 26/01153/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey ground floor rear/side extension with a courtyard and formation of a new gate to the side boundary wall to Flat A.

As published by the council, reference 26/01153/FUL

Application record

Reference
26/01153/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Grant Permission
Received
13 Apr 2026
Validated
30 Apr 2026
Decided
25 Jun 2026
Ward
Brixton Windrush
Decision by
Delegated Decision
Postcode
SW2 1ED

Timeline

Dates from the published record

  1. 13 Apr 2026

    Received by Lambeth

  2. 30 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jun 2026

    Decision issued: Grant Permission

  4. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Mainstay Architecture Ltd Agent, an architecture practice registered in Ipswich

Active · incorporated 2024 · Ipswich

5 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • OFFICER REPORT Delegated Register · 25 Jun 2026
  • REDACTED Application Form · 12 May 2026
  • THE LOCATION PLAN OS Map · 13 Apr 2026
  • PROPOSED PLANS AND ELEVATIONS Plans · 13 Apr 2026
  • COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM Supporting Docs · 13 Apr 2026
  • EXISTING PLANS AND ELEVATIONS Plans · 13 Apr 2026
  • EXISTING/PROPOSED BLOCK PLANS Plans · 13 Apr 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Lambeth granted permission on 25 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 78 Kellett Road London SW2 1ED

    21/00800/FUL Submitted 26 Feb 2021 50 yards away

    Erection of a rear mansard roof extension with the installation of 2 front rooflights. (Second floor flat).

    Granted Full applications Extension Loft or dormer 9 docs
  • 78 Kellett Road London SW2 1ED

    20/01916/FUL Submitted 10 Jun 2020 50 yards away

    Erection of a rear mansard roof extension and installation of 2X roof lights to the front roof slope (Second floor flat).

    Granted Full applications Extension Loft or dormer 19 docs
  • 68 Mervan Road London SW2 1DU

    21/01287/FUL Submitted 29 Mar 2021 50 yards away

    Erection of a single storey ground floor rear extension with the formation of a first floor roof terrace, including the replacement of the outbuilding with a single storey home office. Alterations to hard/soft landscaping, boundary treatment and creation of a vehicular crossover.

    Refused Full applications Extension 11 docs
    Small domestic
  • 68 Mervan Road London SW2 1DU

    24/02226/FUL Submitted 17 Jul 2024 50 yards away

    Erection of single storey ground floor rear extension and erection of rear mansard roof extension and rear roof terrace together with the installation of 6 rooflights to the front roofslope. Demolition of existing double garage and erection of single storey rear outbuilding for use as a home office and alterations to hard and soft landscaping and boundary treatment.

    Refused Full applications Extension Loft or dormer +1 9 docs
    Small domestic
  • 55 Kellett Road London SW2 1EA

    21/02883/FUL Submitted 20 Jul 2021 50 yards away

    Erection of a single storey ground floor rear and side extension, rear dormer extension and bicycle and refuse storage to facilitate change of use from a single dwellinghouse into 3 self-contained flats.

    Refused Full applications New dwelling Extension +1 17 docs
    Small domestic
  • 62 Saltoun Road London SW2 1ER

    25/03076/FUL Submitted 30 Sep 2025 50 yards away

    Replacement of the existing front and rear elevation single-glazed timber windows and doors with front and rear double glazed timber sash windows and front composite door and UPVC rear door.

    Granted Full applications Windows or glazing 16 docs

In Lambeth

  • 26/01955/FUL Granted

    66 South Lambeth Road London SW8 1RL

    Replacement of windows and doors with like-for-like, and replacement of doors openings on rear elevation with full height windows, inset louvred panels and spandrel panel.

    Received 2 Jul, published by the council 3 Aug 2026 Full applications
  • 26/02127/FUL Granted

    46 Mount Nod Road London SW16 2LL

    Replacement of windows with double glazed timber windows.

    Received 21 Jul, published by the council 16 Aug 2026 Full applications
  • 26/02126/FUL Granted

    64 Abbeville Road London SW4 9NE

    Erection of a single storey ground floor side and rear infill extension.

    Received 21 Jul, published by the council 16 Aug 2026 Full applications
  • 26/02071/FUL Granted

    33 Endymion Road London SW2 2BU

    Replacement of timber windows with double-glazed timber windows to the front and rear elevations (amended).

    Received 16 Jul, published by the council 8 Aug 2026 Full applications
  • 26/02074/FUL Granted

    Ujima Court Sunnyhill Road London SW16 2UG

    Replacement of timber windows and doors with double-glazed timber windows and doors to all elevations.

    Received 16 Jul, published by the council 8 Aug 2026 Full applications