Skip to content
PlanIndex Get alerts
Menu

Planning application

90 Park Hill London SW4 9PB

Granted Lambeth 26/00204/FUL Full Planning Permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a single storey ground floor rear and side infill extension. Erection of 2 x box dormer roof extensions to existing roof.

As published by the council, reference 26/00204/FUL

Application record

Reference
26/00204/FUL
Type
Full Planning Permission
Status
Decided
Decision
Grant Permission
Received
23 Jan 2026
Validated
23 Jan 2026
Decided
19 Mar 2026
Ward
Clapham Common & Abbeville
Decision by
Delegated Decision
Postcode
SW4 9PB

Timeline

Dates from the published record

  1. 23 Jan 2026

    Received by Lambeth

  2. 19 Mar 2026

    Decision issued: Grant Permission

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Northallerton

52 applications on PlanIndex · across 13 councils · 86% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 86 Park Hill London SW4 9PB

    25/03550/TCA Submitted 13 Nov 2025 20m away

    Front Garden: T1 Strawberry tree dismantle to ground level reason overgrown and blocking access and light. T2 Bamboo remove to ground level reason dead . T3 Bamboo remove to ground level reason dead . T4 Holm oak crown reduce by 2.5m and lift crown by 0.5m and trim to shape reason maintain size and improve light . Note Bamboo and shrubs are not trees for the purposes of section 211 notifications. These works fall outside the Conservation Area process and are not assessed. The council does not regulate bamboo.

    Granted Trees
  • 76 Park Hill London SW4 9PB

    24/02063/FUL Submitted 2 Jul 2024 43m away

    Excavation and creation of a basement level with front lightwell, and the erection of a ground floor side extension and a replacement rear extension with a first floor rear/side extension along with the removal of a window for the relocation of a front door, and a replacement tree.

    Granted Full applications Extension Windows or glazing +1 25 docs
  • 94 Crescent Lane London SW4 9PL

    25/03930/LDCP Submitted 17 Dec 2025 45m away

    Application for a Certificate of Lawful Development (Proposed) with respect to the erection of a rear roof extension incorporating a juliet balcony; the installation of three front roof lights; the replacement and enlargement of front ground floor and first floor windows.

    Granted Lawful development Extension Loft or dormer +1 10 docs
  • 94 Crescent Lane London Lambeth SW4 9PL

    26/01307/FUL Submitted 27 Apr 2026 45m away

    Erection of a rear roof extension with raised party walls; installation of 3 no. roof lights to the front roof slope; replacement and enlargement of ground-floor and first-floor front windows; and installation of an Air Source Heat Pump (ASHP) with a timber enclosure within the front garden.

    Granted Full applications Extension Loft or dormer +1 13 docs
  • 74 Park Hill London SW4 9PB

    26/00948/LB Submitted 24 Mar 2026 53m away

    Application for Listed Building Consent for the replacement of the existing first floor front elevation left window, rear windows and existing doors with single glazed timber windows and doors, and the making good of all other existing windows. (Associated Full Planning Permission with reference number 26/00947/FUL received).

    Granted Heritage and listed buildings Windows or glazing 20 docs
  • 111 Park Hill London SW4 9NX

    26/00863/TCA Submitted 17 Mar 2026 55m away

    TPO Park Hill No. 44 (March 11, 1975) T8 and T9 False. Pseudoacacia robinia - 2.5m crown reduction to stop mechanical damage to property. The front garden Robinia pseudoacacia is protected under TPO Park Hill No. 44 dated 11 March 1975 as Tree No. T8 and/or T9 False Acacia. Works to TPO protected trees cannot be considered under a Conservation Area notification. This TCA has been withdrawn by the Council. Any proposed works to the protected tree must be made by separate TPO application, supported by reasons and appropriate evidence.

    Withdrawn Trees 2 docs

In Lambeth

  • 26/01004/FUL Granted

    49 Lansdowne Gardens London Lambeth SW8 2EL

    Erection of a single-storey side extension to replace the existing garage, together with associated external alterations and internal alterations to a Grade II listed dwelling. Including: replacement of uPVC windows with timber sash windows; installation of conservation rooflights; repair and upgrade of flat roofs including replacement of asphalt with lead and parapet upgrades; replacement of uPVC gutters and downpipes with cast iron; repointing in lime mortar; internal alterations including minor reconfiguration of layout; addition of an a/c unit and other associated external alterations. (Planning Permission and Listed Building Consent ref : 26/01395/LB applications received).

    30 Mar 2026 Full applications
  • 26/01390/FUL Granted

    7 Valleyfield Road London SW16 2HS

    Erection of a two-storey side extension, hip to gable roof extension, erection of a rear dormer and rooflights, demolition of the existing attached garage and all other associated works.

    5 May 2026 Full applications
  • 26/02466/FUL Awaiting decision

    30 Chatsworth Way London SE27 9HN

    Erection of a single-storey ground-floor rear extension, together with façade alterations, replacement windows, installation of rooflights and associated works.

    26 Aug 2026 Full applications
  • 26/00184/FUL Granted

    Garages Adjacent To 21 Leaf Grove Leaf Grove London SE27 0SF

    Redevelopment of the site to provide six dwellinghouses and the provision of cycle parking, refuse storage, landscaping and associated works.

    21 Jan 2026 Full applications
  • 26/02430/FUL Awaiting decision

    33 Bellefields Road London SW9 9UH

    Erection of a single-storey ground floor rear wrap-around extension, including a balcony at upper ground floor level.

    24 Aug 2026 Full applications