Planning application
117 Norwood Road London SE24 9AE
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Insertion of a window at first floor side level
As published by the council, reference 15/07351/FUL
Application record
- Reference
- 15/07351/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Grant Permission
- Received
- 23 Dec 2015
- Validated
- 4 Jan 2016
- Decided
- 29 Feb 2016
- Ward
- Thurlow Park
- Decision by
- Delegated Decision
- Postcode
- SE24 9AE
Timeline
Dates from the published record
-
23 Dec 2015
Received by Lambeth
-
4 Jan 2016
Validated
Checked as complete and ready for consideration.
-
29 Feb 2016
Decision issued: Grant Permission
-
22 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
3 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Flat 1 101 Norwood Road London SE24 9AE
94% historically approved · decision due ~23 Sep
T1 - Birch, fell and grind stump, clear damage to the wall and reaching the end of it's useful life, tree has outgrown its purpose and space.
Awaiting decision Trees 2 docs -
280 Rosendale Road London Lambeth SE24 9DL
Application for a certificate of lawfulness (proposed) for the change of use from a dry cleaners (Class E) to a restaurant (Class E(b)).
Granted Lawful development 11 docs -
Rosendale Road, Between Norwood Road, Tritton Road And Roads Leading To Gipsy Hill London SE24
Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for the creation of a cycle lane, along with changes to junction geometry, footways, signage, vehicle and cycle parking and other associated works to the highway along Rosendale Road, as Phase 3 of the Brockwell Park to Gipsy Hill Healthy Route between the A205 South Circular and Park Hall Road (connecting to the Phase 1 and Phase 2 two-way cycle tracks installed along the eastern side of Rosendale Road and connecting south to future Phase 4 cycle way leading to Gypsy Hill Station).
Granted Outline 8 docs -
Rosendale Road, Between Norwood Road And Tritton Road London SE24
Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for the creation of a cycle lane, along with changes to junction geometry, footways, signage, vehicle and cycle parking and other associated works to the highway along Rosendale Road, as Phase 3 of the Brockwell Park to Gipsy Hill Healthy Route between the A205 South Circular and Park Hall Road (connecting to Phase 1 and Phase 2 two-way cycle tracks installed along the eastern side of Rosendale Road south of Norwood Road).
Granted Outline 8 docs -
103A Norwood Road London SE24 9AE
Application for a non-material amendment following a grant of planning permission ref. 25/00795/FUL (Erection of a single storey ground floor rear extension, loft conversion with two rear dormer windows and the installation of two front rooflights.), granted on 30.05.2025. Amendment sought: To amend the approved materials for the dormer extension from the approved lead-clad finish to a rendered and painted finish.
Refused Amendments Extension Loft or dormer +1 3 docsSmall domestic -
279 Rosendale Road London SE24 9EJ
93% historically approved · decision due ~2 Jun
Approval of details pursuant to condition 12 (external construction) of Planning Permission Ref: 22/03635/FUL (Retention and restoration of front facade; demolition of buildings behind; the erection of a part two, four and five-storey building to provide 23 residential dwellings, commercial space on the ground floor [Use Class E(e) or E(f)], communal amenity space, cycle parking, and hard and soft landscaping; and other associated development.) Granted on 19.12.2023
Awaiting decision Conditions Demolition 28 docs
Other full applications applications
In Lambeth
-
26/01004/FUL Granted
49 Lansdowne Gardens London Lambeth SW8 2EL
Erection of a single-storey side extension to replace the existing garage, together with associated external alterations and internal alterations to a Grade II listed dwelling. Including: replacement of uPVC windows with timber sash windows; installation of conservation rooflights; repair and upgrade of flat roofs including replacement of asphalt with lead and parapet upgrades; replacement of uPVC gutters and downpipes with cast iron; repointing in lime mortar; internal alterations including minor reconfiguration of layout; addition of an a/c unit and other associated external alterations. (Planning Permission and Listed Building Consent ref : 26/01395/LB applications received).
-
26/01390/FUL Granted
7 Valleyfield Road London SW16 2HS
Erection of a two-storey side extension, hip to gable roof extension, erection of a rear dormer and rooflights, demolition of the existing attached garage and all other associated works.
-
26/02466/FUL Awaiting decision
30 Chatsworth Way London SE27 9HN
Erection of a single-storey ground-floor rear extension, together with façade alterations, replacement windows, installation of rooflights and associated works.
-
26/00184/FUL Granted
Garages Adjacent To 21 Leaf Grove Leaf Grove London SE27 0SF
Redevelopment of the site to provide six dwellinghouses and the provision of cycle parking, refuse storage, landscaping and associated works.
-
26/02430/FUL Awaiting decision
33 Bellefields Road London SW9 9UH
Erection of a single-storey ground floor rear wrap-around extension, including a balcony at upper ground floor level.