Skip to content
PlanIndex Get alerts
Menu

Planning application

Waterloo Station London SE1 7LY

Refused Lambeth 09/00218/FUL Full Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Replacement of exisiting Public telephone Kiosk with Kiosk combining Public payphone and ATM.

As published by the council, reference 09/00218/FUL

Application record

Reference
09/00218/FUL
Type
Full Planning Permission
Status
Decided
Decision
Refuse Permission
Received
26 Jan 2009
Validated
26 Jan 2009
Decided
11 Mar 2009
Ward
Bishops
Decision by
Delegated Decision
Postcode
SE1 7LY

Timeline

Dates from the published record

  1. 26 Jan 2009

    Received by Lambeth

  2. 11 Mar 2009

    Decision issued: Refuse Permission

  3. 22 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Arches 228-232 Waterloo Station Approach London SE1 7LY

    10/00698/DET Submitted 24 Feb 2010 0m away

    Approval of details pursuant to condition 5 (Crowd management strategy ) of planning permission ref 09/03271/FUL (Change of use of Arches 228-232 for a temporary period of 1 year to theatre use and associated activities. (Amended Description 7 December 2009) granted on 19.01.2010.

    Granted Conditions 5 docs
  • Waterloo Station London SE1 7LY

    04/01142/LB Submitted 21 Apr 2004 0m away

    The installation of 123 additional CCTV cameras, together with the relocation of one existing CCTV camera.

    Granted Heritage and listed buildings 1 doc
  • Waterloo Station London SE1 8SW

    26/01033/G18 Submitted 25 Mar 2026 39m away

    Application for prior approval under Part 18 of the GPDO for the removal and relocation of the existing access door at the rear of Unit G14 on Cab Road and replacement with solid masonry infill and a repositioned door.

    Granted Outline Extension 7 docs
  • Waterloo Station London SE1 8SW

    20/03591/DET Submitted 15 Oct 2020 39m away

    Approval of details pursuant to condition 8 (Fume Extraction and Filtration Equipment) and 28 (Plant Equipment) of planning permission 16/02973/FUL (Change of use of existing Waterloo International Terminal (WIT) to a mix of Class A1-A5 (retail) uses and Class D2 (assembly & leisure) use, the installation of mezzanine floorspace, external alterations, servicing and associated works) granted on 19.05.2017.

    Granted Conditions 47 docs
  • Waterloo Station London SE1 8SW

    26/02226/G18 Submitted 21 Jul 2026 39m away

    83% historically approved · decision due ~15 Sep

    Application for prior approval under Part 18 of the GPDO for the replacement of the window with an access door at first floor level to serve the Link Bridge retail plant deck on the north side of the station.

    Awaiting decision Windows or glazing 3 docs
  • Shell Centre 2 - 4 York Road London SE1

    21/01156/ADV Submitted 21 Mar 2021 48m away

    Display of one internally illuminated fascia sign and one non-illuminated hanging sign. (To Unit 1/480)

    Granted Advertising 6 docs

In Lambeth

  • 26/01004/FUL Granted

    49 Lansdowne Gardens London Lambeth SW8 2EL

    Erection of a single-storey side extension to replace the existing garage, together with associated external alterations and internal alterations to a Grade II listed dwelling. Including: replacement of uPVC windows with timber sash windows; installation of conservation rooflights; repair and upgrade of flat roofs including replacement of asphalt with lead and parapet upgrades; replacement of uPVC gutters and downpipes with cast iron; repointing in lime mortar; internal alterations including minor reconfiguration of layout; addition of an a/c unit and other associated external alterations. (Planning Permission and Listed Building Consent ref : 26/01395/LB applications received).

    30 Mar 2026 Full applications
  • 26/01390/FUL Granted

    7 Valleyfield Road London SW16 2HS

    Erection of a two-storey side extension, hip to gable roof extension, erection of a rear dormer and rooflights, demolition of the existing attached garage and all other associated works.

    5 May 2026 Full applications
  • 26/02466/FUL Awaiting decision

    30 Chatsworth Way London SE27 9HN

    Erection of a single-storey ground-floor rear extension, together with façade alterations, replacement windows, installation of rooflights and associated works.

    26 Aug 2026 Full applications
  • 26/00184/FUL Granted

    Garages Adjacent To 21 Leaf Grove Leaf Grove London SE27 0SF

    Redevelopment of the site to provide six dwellinghouses and the provision of cycle parking, refuse storage, landscaping and associated works.

    21 Jan 2026 Full applications
  • 26/02430/FUL Awaiting decision

    33 Bellefields Road London SW9 9UH

    Erection of a single-storey ground floor rear wrap-around extension, including a balcony at upper ground floor level.

    24 Aug 2026 Full applications