Skip to content
PlanIndex Get alerts
Menu

Planning application

The Forum and market hall, Duke Street, Barrow in Furness, Cumbria

Withdrawn Lake District National Park B18/2023/0221 Other

Works: Demolition

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Proposed external façade alterations to Duke Street, Paxton Street, Dalton Road and Stephen Street elevations and Barrow Market elevations fronting Duke Street, including some minor partial demolition.

As published by the council, reference B18/2023/0221

Application record

Reference
B18/2023/0221
Type
Other
Status
Withdrawn
Decision
Withdrawn As published: WITHDRAWN
Received
22 Mar 2023
Validated
22 Mar 2023
Decided
3 Mar 2026

Timeline

Dates from the published record

  1. 22 Mar 2023

    Received by Lake District National Park

  2. 3 Mar 2026

    Decision issued: WITHDRAWN

  3. 6 Oct 2026

    Added to PlanIndex

What withdrawal means

The applicant withdrew this application before Lake District National Park decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Lake District National Park

  • BPA8/2026/0383 Awaiting decision

    97 Rawlinson Street Barrow-In-Furness Cumbria LA14 2DT

    Internal refurbishment including plasterwork, plumbing, electrical, new kitchen, bathroom and one new window on the ground floor rear elevation

    Received 24 Sep, published by the council 6 Oct 2026 Other
  • 2026/1519/OHLI Granted

    Land at Low Wood Edge Beetham MILNTHORPE LA7 7AJ

    Replacement of existing poles in situ and replace the open wire conductors with Aerial Bundled Conductors (ABC)

    Received 30 Jul, published by the council 9 Aug 2026 Other
  • 2026/1508/OHLI Granted

    Power Line along Black Dyke Road Arnside CARNFORTH LA5 0HH

    Replacement of existing poles in situ and replace the existing open wire conductors with Aerial Bundled Conductor (ABC) under permitted development rights

    Received 28 Jul, published by the council 9 Aug 2026 Other
  • B12/2026/0339 Awaiting decision

    North Quay and North Quay Hardstanding, Devonshire Dock Complex, Barrow in Furness, Cumbria, LA14 2JW.

    Demolition of existing structures and installation of welfare and office accommodation facilities, security cabin, construction of a build environment structure, materials stores and associated works (amended description)

    Received 8 Sep, published by the council 22 Sep 2026 Other
  • 3/26/9001 Awaiting decision

    Land to south of septic tank/west of Brampton Beck Brampton Appleby-in-Westmorland Cumbria CA16 6JS

    Extension of existing Septic Tank site to accommodate upgraded wastewater treatment infrastructure, alterations to existing highway access, creation of new access track and associated land reprofiling, landscaping and associated ancillary development.

    Received 7 Sep, published by the council 11 Sep 2026 Other