Planning application
Halewood Academy The Avenue Halewood Knowsley L26 1UU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
EXTERNAL ALTERATIONS TO BUILDING COMPRISING OF ROOF REFURBISHMENT TO FORM ENCLOSURES TO EXISTING PLANT AND ASSOCIATED WORKS
As published by the council, reference 26/00371/FUL
Application record
- Reference
- 26/00371/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Validated
- 30 Jul 2026
- Postcode
- L26 1UU
Timeline
Dates from the published record
-
30 Jul 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Knowsley took a median of 74 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Knowsley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Hilton Grace Youth Centre The Avenue Halewood Knowsley L26 1UU
INSTALLATION OF ADDITIONAL 3NO. ANTENNAE AT A HEIGHT OF 15.3 METRES AND 2NO. TRANSMISSION DISHES AT A HEIGHT OF 17 METRES TO EXISTING 20 METRE TELECOMMUNICATIONS MAST, TOGETHER WITH ANCILLARY EQUIPMENT.
Granted Telecoms -
Hilton Grace Youth Centre The Avenue Halewood Knowsley L26 1UU
INCREASE IN HEIGHT OF TELECOMMUNICATIONS MAST FROM 15 METRES TO 20 METRES, RELOCATION OF EXISTING ANTENNAE AND DISHES TO TOP OF MAST, WITH 6 NO. ANTENNAE LEG-MOUNTED AT 17 METRES HEIGHT AND NEW EQUIPMENT CABIN IN EXISTING COMPOUND
Granted Full applications -
Hilton Grace Youth Centre The Avenue Halewood Knowsley L26 1UU
UPGRADE OF EXISTING TELECOMMUNICATIONS EQUIPMENT CABIN TO INCORPORATE 2 HEAT MANAGEMENT UNITS (0.8M X 1.3M) TO REAR OF EXISTING CABIN
Granted Telecoms -
Halewood Community Comprehensive School The Avenue Halewood Knowsley L26 1UU
ERECTION OF 2 NO. TEMPORARY MOBILE CLASSROOMS.
Granted Other -
Halewood Academy The Avenue Halewood Knowsley L26 1UU
90% historically approved · decision due ~5 Oct
ERECTION OF 1NO. MODULAR BUILDING
Awaiting decision Full applications -
Halewood Community Comprehensive School The Avenue Halewood Knowsley L26 1UU
ERECTION OF NEW SPORTS HALL AND ALTERATIONS TO EXISTING HARD AND SOFT LANDSCAPING
Granted Other
Other full applications applications
In Knowsley
-
26/00427/FUL Awaiting decision
3 Woodland Road Halewood Knowsley L26 1XE
ERECTION OF A SINGLE STOREY SIDE AND REAR EXTENSION TOGETHER WITH THE DEMOLITION OF EXISTING GARAGE.
-
26/00164/FUL Granted
29 Ormskirk Road Knowsley Village Knowsley L34 8HB
ERECTION OF A SINGLE STOREY REAR EXTENSION INCORPORATING A ROOF TERRACE ABOVE, REPOSITIONING AND INSTALLATION OF NEW WINDOWS AND DOORS, FORMATION OF NEW ARCHWAY TO FRONT ENTRANCE WITH EXISTING FRONT EXTENSION HEIGHT INCREASED, INSTALLATION OF NEW GATES AND BOUNDARY WALLS TO THE FRONT, INTERNAL RECOFIGURATION OF THE DWELLING AND INSTALLATION OF 3NO. ROOFLIGHTS TO THE FRONT ROOF-PLANE AND 2NO. ROOFLIGHTS TO THE REAR ROOF-PLANE.
-
26/00110/FUL Granted
The Sun Inn 11 Derby Street Prescot Knowsley L34 3LE
ERECTION OF SINGLE STOREY INFILL EXTENSION WITH PITCHED ROOF (UTILISING EXISTING BOUNDARY WALL); RETENTION OF FESTOON LIGHTING TO BEER GARDEN; GLAZED DOORS REPLACING WINDOW TO REAR ELEVATION AND BIN STORE TOGETHER WITH EXTERNAL ALTERATIONS
-
25/00656/FUL Granted
Prescot Soccer And Leisure Centre Warrington Road Prescot Knowsley L35 5AD
INSTALLATION OF 2 NO. AIR SOURCE HEAT PUMPS, 1 HOT WATER BUFFER VESSEL AND ASSOCIATED INFRASTRUCTURE
-
26/00418/FUL Awaiting decision
30 Blackburne Drive Halewood Knowsley L25 0QF
ERECTION OF A TWO STOREY SIDE AND PART TWO STOREY REAR EXTENSION.