Skip to content
PlanIndex Get alerts
Menu

Planning application

All In One 175 - 177 Tarbock Road Huyton Knowsley L36 5TG

Awaiting decision Knowsley 26/00331/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

INSTALLATION OF NEW SHOP FRONTAGE TO THE ST JOHN ROAD FACING ELEVATION, INSTALLATION OF 1 NO. NEW DOOR OPENING TO GROUND FLOOR TARBOCK ROAD FACING ELEVATION AND INSTALLATION OF 1 NO. REPLACEMENT DOOR OPENING TO GROUND FLOOR REAR ELEVATION

As published by the council, reference 26/00331/FUL

Application record

Reference
26/00331/FUL
Category
Full applications
Status
Awaiting decision
Validated
10 Jul 2026
Postcode
L36 5TG

Timeline

Dates from the published record

  1. 10 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  2. 8 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 4 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Knowsley took a median of 74 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Knowsley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37 Beech Road Huyton Knowsley L36 5TS

    03/00462/FUL Submitted 12 May 2003 87m away

    CONSTRUCTION OF DORMER TO REAR OF DWELLING

    Granted Full applications Loft or dormer
    Domestic
  • 13 Birch Road Huyton Knowsley L36 0XB

    05/01144/FUL Submitted 6 Jan 2006 122m away

    ERECTION OF TWO STOREY EXTENSION TO REAR OF DWELLING

    Granted Full applications Extension 1 doc
    Domestic
  • 51 Birch Road Huyton Knowsley L36 0XB

    05/00753/FUL Submitted 3 Aug 2005 122m away

    ERECTION OF TWO STOREY SIDE AND PART SINGLE STOREY FRONT EXTENSIONS

    Granted Full applications Extension 1 doc
    Small domestic
  • 14 Birch Road Huyton Knowsley L36 0XD

    05/00260/FUL Submitted 16 Mar 2005 128m away

    ERECTION OF SINGLE STOREY EXTENSION TO REAR OF DWELLING.

    Granted Full applications Extension
    Small domestic
  • 14 Cedarwood Court Huyton Knowsley L36 5YY

    02/00342/FUL Submitted 23 Apr 2002 134m away

    ERECTION OF CONSERVATORY TO REAR OF DWELLING

    Granted Full applications Extension
    Small domestic
  • 8 Cedarwood Court Huyton Knowsley L36 5YY

    01/00799/FUL Submitted 2 Jan 2002 134m away

    ERECTION OF TWO-STOREY EXTENSION TO SIDE OF DWELLING AND AMENDMENTS TO DESIGN OF EXISTING FRONT PORCH.

    Refused Full applications Extension
    Small domestic

In Knowsley

  • 26/00427/FUL Awaiting decision

    3 Woodland Road Halewood Knowsley L26 1XE

    ERECTION OF A SINGLE STOREY SIDE AND REAR EXTENSION TOGETHER WITH THE DEMOLITION OF EXISTING GARAGE.

    1 Sep 2026 Full applications
  • 26/00164/FUL Granted

    29 Ormskirk Road Knowsley Village Knowsley L34 8HB

    ERECTION OF A SINGLE STOREY REAR EXTENSION INCORPORATING A ROOF TERRACE ABOVE, REPOSITIONING AND INSTALLATION OF NEW WINDOWS AND DOORS, FORMATION OF NEW ARCHWAY TO FRONT ENTRANCE WITH EXISTING FRONT EXTENSION HEIGHT INCREASED, INSTALLATION OF NEW GATES AND BOUNDARY WALLS TO THE FRONT, INTERNAL RECOFIGURATION OF THE DWELLING AND INSTALLATION OF 3NO. ROOFLIGHTS TO THE FRONT ROOF-PLANE AND 2NO. ROOFLIGHTS TO THE REAR ROOF-PLANE.

    14 May 2026 Full applications
  • 26/00110/FUL Granted

    The Sun Inn 11 Derby Street Prescot Knowsley L34 3LE

    ERECTION OF SINGLE STOREY INFILL EXTENSION WITH PITCHED ROOF (UTILISING EXISTING BOUNDARY WALL); RETENTION OF FESTOON LIGHTING TO BEER GARDEN; GLAZED DOORS REPLACING WINDOW TO REAR ELEVATION AND BIN STORE TOGETHER WITH EXTERNAL ALTERATIONS

    31 Mar 2026 Full applications
  • 25/00656/FUL Granted

    Prescot Soccer And Leisure Centre Warrington Road Prescot Knowsley L35 5AD

    INSTALLATION OF 2 NO. AIR SOURCE HEAT PUMPS, 1 HOT WATER BUFFER VESSEL AND ASSOCIATED INFRASTRUCTURE

    17 Mar 2026 Full applications
  • 26/00418/FUL Awaiting decision

    30 Blackburne Drive Halewood Knowsley L25 0QF

    ERECTION OF A TWO STOREY SIDE AND PART TWO STOREY REAR EXTENSION.

    Full applications