Planning application
Yard 2C Saturn Park School Lane Knowsley Business Park Knowsley L34 9J
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
NON MATERIAL AMENDMENT FOLLOWING THE GRANT OF PLANNING PERMISSION 21/00884/FUL - (VARIATION OF CONDITION NO. 2 (APPROVED PLANS) ATTACHED TO PLANNING PERMISSION 18/00578/FUL (ERECTION OF HGV COMPRESSED NATURAL GAS FUEL FILLING STATION AND ASSOCIATED WORKS) TO ALLOW FOR CHANGES TO THE INTERNAL SITE LAYOUT INCLUDING RE-CONFIGURATION OF FUEL PUMP ARRANGEMENTS, RE-LOCATION OF GAS METER SKID, INTERNAL RE-CONFIGURATION OF EQUIPMENT COMPOUND, AND INSTALLATION OF CCTV AND FLOODLIGHTS (INCLUDING SOME RETROSPECTIVE ASSOCIATED WORKS). AMENDMENT SOUGHT FOR ERECTION OF 2.4 M HIGH FENCING AROUND PORTALOO
As published by the council, reference 21/00884/NMA
Application record
- Reference
- 21/00884/NMA
- Category
- Amendments
- Status
- Awaiting decision
- Validated
- 11 Sep 2026
Timeline
Dates from the published record
-
11 Sep 2026
Validated
Checked as complete and ready for consideration.
-
18 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Knowsley took a median of 59 days over the applications it decided in the last year.
What happens while it is decided
This application is with Knowsley for determination, against a statutory target of eight weeks. Over the last year Knowsley's median decision took 59 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Knowsley
-
25/00285/NMA Granted
Coopers Lane Knowsley Industrial Park Kirkby Knowsley L33 7TT
NON MATERIAL AMENDMENT FOLLOWING THE GRANT OF PLANNING PERMISSION 25/00285/FUL (VARIATION OF CONDITIONS 2 (APPROVED PLANS), 3 (DRAINAGE ASSESSMENT), 4 (FIRE STATEMENT), 7 (CONSTRUCTION ENVIROMENTIAL MANAGEMENT PLAN), 8 (BUILD OVER AGREEMENT), AND 13 (BATTERY SAFETY MANAGEMENT PLAN) OF PLANNING PERMISSION 23/02008/FUL (PROPOSED DEVELOPMENT OF A BATTERY STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE) AMENDMENT SOUGHT FOR CHANGES TO LAYOUT, PLANS AND ELEVATIONS
-
25/00344/NMA Granted
Former Boundary Pub Site Pilch Lane Roby Knowsley
APPLICATION FOR A NON- MATERIAL AMENDMENT FOLLOWING GRANT OF PLANNING PERMISSION 25/00344/FUL - ERECTION OF 34 NO. AFFORDABLE RESIDENTIAL DWELLINGS AND ASSOCIATED INFRASTRUCTURE . APPROVAL SOUGHT TO REMOVE AFFORDABLE FROM THE DESCRIPTION OF DEVELOPMENT AND ALTERATION TO THE HIGHWAY/ACCESS IN FRONT OF PLOTS 7-11.
-
22/00662/NMA1 Granted
Interchange Motorway Estate Wilson Road Huyton Knowsley L36 6JG
APPLICATION FOR A NON MATERIAL AMENDMENT FOLLOWING GRANT OF PLANNING PERMISSION 22/00662/FUL FOR DEMOLITION OF BUILDINGS AND THE ERECTION OF 2 NO. INDUSTRIAL BUILDINGS TO INCLUDE 24 NO. UNITS COMPRISING OF 2 NO. UNITS (USE CLASS E (g) (iii), 4 NO. UNITS (USE CLASS B8) AND 18 NO. UNITS (USE CLASS B2). APPROVAL SOUGHT TO AMEND THE ACCESS MANAGEMENT PLAN APPROVED UNDER APPLICATION REF 22/00662/NMA.
-
26/00083/NMA Granted
55 Easton Road Roby Knowsley L36 4NY
NON-MATERIAL AMENDMENT TO 26/00083/FUL (ERECTION OF A TWO STOREY SIDE EXTENSION AND A SINGLE STOREY REAR EXTENSION TOGETHER WITH THE DEMOLITION OF EXISTING DETACHED GARAGE) AMENDMENT SOUGHT TO INSTALL SLIDING DOORS TO THE ENTIRE REAR ELEVATION OF THE PROPOSED SINGLE STOREY REAR EXTENSION AND CHANGE THE MATERIAL FINISH OF THE SIDE ELEVATION OF THE TWO-STOREY SIDE EXTENSION FROM HALF BRICK / HALF RENDER TO FULL BRICKWORK
-
22/00099/NMA1 Awaiting decision
Contract Chemicals Ltd Penrhyn Road Knowsley Business Park Knowsley L34 9HY
APPLICATION FOR A NON MATERIAL AMENDMENT FOLLOWING GRANT OF PLANNING PERMISSION 22/00099/FUL - ERECTION OF AN INDUSTRIAL/LOGISTICS BUILDING (USES B2, B8 AND E(g)(iii)) WITH ANCILLARY OFFICES, SECURITY GATEHOUSE, TRANSPORT OFFICE AND ASSOCIATED WORKS. APPROVAL SOUGHT TO AMEND THE KERB LINE IN THE PROPOSED YARD AND THE LAYOUT OF HGV SPACES