Planning application
69, Long Lane, Earlsheaton, Dewsbury, WF12 8LQ
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dormer extension
As published by the council, reference 2026/91134
Application record
- Reference
- 2026/91134
- Type
- Full
- Status
- Conditions
- Decision
- Granted As published: CONDITIONAL FULL PERMISSION
- Received
- 23 Apr 2026
- Validated
- 23 Apr 2026
- Decided
- 16 Jun 2026
- Ward
- Dewsbury East Ward
- Postcode
- WF12 8LQ
Timeline
Dates from the published record
-
23 Apr 2026
Received by Kirklees
-
16 Jun 2026
Decision issued: CONDITIONAL FULL PERMISSION
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kirklees granted permission on 16 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Clough Farm, Long Lane, Earlsheaton, Dewsbury, WF12 8LQ
91% historically approved · decision due ~14 Aug
Discharge of details reserved by conditions 10 (surface water features within the highway), 11 (foul, surface water and land drainage) 12 (1 in 100 year storm events) and 13 (temporary surface water drainage) on previous permission 2024/91476 for erection of 24 dwellings
Status unknown Conditions 16 docsMajor scheme -
Clough Farm, Long Lane, Earlsheaton, Dewsbury, WF12 8LQ
91% historically approved · decision due ~14 Aug
Discharge of details reserved by conditions 8 (highway condition survey) and 16 (measures to improve pedestrian provision) on previous permission 2024/91476 for erection of 24 dwellings
Status unknown Conditions 4 docsMajor scheme -
Clough Farm, Long Lane, Earlsheaton, Dewsbury, WF12 8LQ
91% historically approved · decision due ~23 Sep
Discharge of details reserved by condition 14 (Reptile Survey), 15 (CEMP-Biodiversity), 18 (Arboricultural Method Statement), 34 (bird/bat boxes) on previous permission 2024/91476 for erection of 24 dwellings
Status unknown Conditions 10 docsMajor scheme -
2, Woodburn Avenue, Earlsheaton, Dewsbury, WF12 8LJ
Erection of dormer window to side
Granted Full applications Loft or dormer Windows or glazing 9 docs -
48, Woodburn Avenue, Earlsheaton, Dewsbury, WF12 8LJ
Erection of single storey rear extension and dormer extension to side
Granted Full applications Extension Loft or dormer 10 docsSmall domestic -
48, Woodburn Avenue, Earlsheaton, Dewsbury, WF12 8LJ
Erection of single storey rear extension and side dormer extension
Granted Full applications Extension Loft or dormer 9 docsSmall domestic
Other full applications
In Kirklees
-
2026/91474 Granted
3, Park Gate Court, Scissett, Huddersfield, HD8 9UZ
Erection of detached garden/outbuilding
-
2026/91926 Granted
158, Hawthorne Way, Shelley, Huddersfield, HD8 8PX
Change of use of garage to treatment room for hairdressing including installation of bi-fold doors to existing opening
-
2026/90086 Granted
2, Mavis Street, Scout Hill, Dewsbury, WF13 3RX
Change of use of existing dwelling (C3) to children's residential home (C2)
-
2026/92178 Granted
15, Meadow Bank Crescent, Mirfield, WF14 9QL
Erection of dormer extension including raising of roof height, erection of side extension, balcony, installation of solar photovoltaic (PV) panels to roof on front elevation and associated alterations
-
2026/92162 Granted
69, Carr Hill Road, Upper Cumberworth, Huddersfield, HD8 8XN
Erection of first floor side extension and front and rear dormers including erection of rear balcony and alterations to roof