Planning application
Former Dowker Works, Dowker Street, Milnsbridge, Huddersfield, HD3 4JX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 35 dwellings with associated access and landscaping (within a Conservation Area)
As published by the council, reference 2023/92490
Application record
- Reference
- 2023/92490
- Type
- Full
- Received
- 18 Aug 2023
- Validated
- 8 Sep 2023
- Ward
- Golcar Ward
- Postcode
- HD3 4JX
Timeline
Dates from the published record
-
18 Aug 2023
Received by Kirklees
-
8 Sep 2023
Validated
Checked as complete and ready for consideration.
-
5 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 November 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Kirklees took a median of 61 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
197 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsChecking the current position
The published feed does not show a live status for this application; the register on Kirklees's own portal holds the authoritative version.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8, Dowker Street, Milnsbridge, Huddersfield, HD3 4JB
Conversion of one dwelling to two flats (Listed Building within a Conservation Area)
Granted Full applications New dwelling 13 docsDomestic -
8, Dowker Street, Milnsbridge, Huddersfield, HD3 4JB
Discharge of condition 3 (noise report) on previous permission 2020/93297 for conversion of one dwelling to two flats (Listed Building within a Conservation Area)
Granted Conditions New dwelling 5 docsDomestic -
8, Dowker Street, Milnsbridge, Huddersfield, HD3 4JB
Listed Building Consent for conversion of one dwelling to two flats (within a Conservation Area)
Granted Heritage and listed buildings New dwelling 15 docsDomestic -
The Bridge, 42, Market Street, Milnsbridge, Huddersfield, HD3 4HY
91% historically approved · decision due ~17 Nov
Discharge of details reserved by conditions 1 (noise assessment), 3 (bin storage) on previous permission 2025/93385 for prior notification for change of use from commercial/business/service to one dwelling (within a Conservation Area)
Status unknown Conditions 3 docsDomestic -
The Bridge, 42, Market Street, Milnsbridge, Huddersfield, HD3 4HY
Prior notification for change of use from commercial/business/service to one dwelling (within a Conservation Area)
Granted Outline 11 docsDomestic -
Dowker Street, Milnsbridge, Huddersfield, HD3 4JU
Non material amendment on previous permission 2025/92728 for erection of 33 dwellings with associated car parking and landscaping
Granted Amendments 4 docsMajor scheme
Other full applications
In Kirklees
-
2026/91474 Granted
3, Park Gate Court, Scissett, Huddersfield, HD8 9UZ
Erection of detached garden/outbuilding
-
2026/91926 Granted
158, Hawthorne Way, Shelley, Huddersfield, HD8 8PX
Change of use of garage to treatment room for hairdressing including installation of bi-fold doors to existing opening
-
2026/90086 Granted
2, Mavis Street, Scout Hill, Dewsbury, WF13 3RX
Change of use of existing dwelling (C3) to children's residential home (C2)
-
2026/92178 Granted
15, Meadow Bank Crescent, Mirfield, WF14 9QL
Erection of dormer extension including raising of roof height, erection of side extension, balcony, installation of solar photovoltaic (PV) panels to roof on front elevation and associated alterations
-
2026/92162 Granted
69, Carr Hill Road, Upper Cumberworth, Huddersfield, HD8 8XN
Erection of first floor side extension and front and rear dormers including erection of rear balcony and alterations to roof