21/02133/CLC

95 Cromwell Avenue New Malden KT3 6DN

Granted Kingston upon Thames Details Reserved by Condition

Proposal

Details required for Conditions 4 (Sustainability), 5 (Refuse) and 6 (Cycle Parking) of planning application 21/00877/FUL (Conversion of existing single dwelling into 1no. three-bedroom and 1no. one-bed self-contained dwelling, with associated parking)

As published by the council, reference 21/02133/CLC

Timeline

Dates from the published record

  1. 1 Jul 2021

    Received by Kingston upon Thames

  2. 17 Jan 2022

    Decision issued: Application Granted

  3. 3 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 21/03138/CPU Granted

    65 Queens Road New Malden KT3 6BY

    Erection of rear dormer roof extension(including a juliet balcony) with installation of 2 no. rooflights to front roofslope and front porch.

    29 Sep 2021 18m away Lawful development
  • 26/00736/CLC Granted

    Land To The Northeast Of Woodfield Gardens New Malden

    Details required for Conditions 12 (Water Efficiency Calculations), 14 (south-facing window details), 18 (drainage scheme) of planning permission 23/01158/FUL (Erection of 3nos new residential dwellings (Class C3) with associated hard and soft landscaping, parking and associated infrastructure.)

    8 Apr 2026 73m away Conditions
  • 20/00775/HOU Granted

    38 Queens Road New Malden KT3 6BX

    Erection of single storey rear extension

    31 Mar 2020 76m away Householder
  • 26/00885/HOU Granted

    45 George Road New Malden KT3 6BT

    Demolition of single storey rear extension and erection of single storey rear extension

    24 Apr 2026 90m away Householder
  • 23/01874/PAEXT Granted

    57 Cavendish Road New Malden KT3 6DH

    Erection of single storey rear extension (4m in depth, maximum height of 4m and eaves height of 3m)

    11 Jul 2023 91m away Householder
  • 25/02967/HOU Granted

    26 Queens Road New Malden KT3 6BX

    Erection of single storey rear extension

    17 Nov 2025 97m away Householder

In Kingston upon Thames

  • 26/01247/CLC Granted

    65 Hampden Road Kingston Upon Thames KT1 3HG

    Details required for Condition 26 (Travel Plan) of planning permission 24/02449/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Conditions 1 (Approved plans), 26 (Travel Plan), 40 (District Heating details) and 42 (Secured By Design) for Application Reference Number: 22/02295/FUL(Demolition of existing industrial buildings and erection of Care Home (Class C2) comprising lower ground, ground and four upper floors, together with landscaping, amenity spaces, plant, off-street parking, cycle and waste storage and an electrical substation.) dated 06/02/2023. Amendments sought: Variation to Condition 1 to capture minor material amendments proposed within the Design and Access Statement Addendum including changes to internal layout and landscape design, Variation to Conditions 26 and 40 to allow the demolition and site investigation works to proceed independently of the main Design and Build contract award, and Variation to Condition 42 to allow the Secure by Design approval process to occur concurrently with the design and build stages.

    11 Jun 2026 Conditions
  • 26/01188/CLC Refused

    22 Gloucester Road Kingston Upon Thames KT1 3SJ

    Details required for Condition 34 (Acoustic) of planning permission 24/00805/FUL (Demolition of existing buildings, redevelopment to provide 34 unit co-living accommodation in a three storey building with basement; ancillary landscaping, cycle provision, refuse storage, disabled car parking.)

    4 Jun 2026 Conditions
  • 26/01101/CLC Refused

    4 Crescent Road Kingston Upon Thames KT2 7QR

    Details required for Conditions 3 (facing materials), 4 (drainage strategy), 7 (landscape and planting plan), 9 (waste and recycling facilities), 10 (cycle parking facilities), 13 (Construction Management Plan) and 17 (nature conservation scheme) of planning permission 25/00524/FUL (Demolition of link between nos. 6 and 8, and erection of rear extensions, three storey side extension to no. 8, internal alterations, fenestration alterations and change of use from HMO (Use Class Sui generis) to provide 3no. dwelling houses and 4no. flats (Use Class C3).)

    25 May 2026 Conditions
  • 26/01168/CLC Granted

    180 Coombe Lane West Kingston Upon Thames KT2 7DE

    Details required for Condition 21 (Elevational details) of planning permission 25/01437/FUL (Demolition of single dwelling and erection of 6nos. dwellings with associated works.)

    2 Jun 2026 Conditions
  • 26/01153/CLC Granted

    Central Parade St Mark's Hill Surbiton KT6 4PJ

    Details required for Conditions 13 (Contaminated Land Assessment) and 23 (Construction Management Plan) of planning permission 23/02175/FUL (Demolition of existing garages and former vehicular workshop and the erection of a 6 storey building comprising commercial space (Class E) at ground floor and 17 flats (Class C3) in upper floors with associated landscaping and cycle storage.)

    1 Jun 2026 Conditions