Skip to content
PlanIndex Get alerts
Menu

Planning application

Um Storage Limited Um Hull West Terminal King George Dock Kingston Upon Hull HU9 5QB

Granted Kingston upon Hull, City of 23/00027/FULL Full Planning Permission

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of an extension to the existing boiler house Following the demolition of the existing pump house.

As published by the council, reference 23/00027/FULL

Application record

Reference
23/00027/FULL
Type
Full Planning Permission
Status
Application Permitted
Decision
Granted As published: Application Permitted
Received
9 Jan 2023
Validated
9 Jan 2023
Decided
6 Mar 2023
Ward
Marfleet
Decision by
Delegated Decision
Postcode
HU9 5QB

Timeline

Dates from the published record

  1. 9 Jan 2023

    Received by Kingston upon Hull, City of

  2. 6 Mar 2023

    Decision issued: Application Permitted

  3. 9 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Environmental Compliance Limited Agent, registered in Manchester

Active · incorporated 2001 · Manchester

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

  • PROPOSED BOILER HOUSE ELEVATION D-D Drawing · 09 Mar 2023
  • OFFICERS DELEGATED REPORT Report · 07 Mar 2023
  • DECISION NOTICE Decision · 06 Mar 2023
  • SCAIL DATA Correspondence · 01 Feb 2023
  • OPEN SPACES COMMENTS Correspondence · 01 Feb 2023
  • PARKS AND OPEN SPACES COMMENTS Correspondence · 31 Jan 2023
  • PUBLIC PROTECTION COMMENTS Correspondence · 27 Jan 2023
  • COVERWORLD - PLASTICOL COLOUR CARD Other · 11 Jan 2023
  • EMAIL FROM AGENT 10/01/2023 RE COLOUR CARD Correspondence · 11 Jan 2023
  • APPLICATION CHECKLIST Officer Notes · 10 Jan 2023
  • EXISTING BOILER AND PUMP HOUSE PLAN Drawing · 09 Jan 2023
  • SITE LOCATION PLAN Drawing · 09 Jan 2023
  • EXISTING BLOCK PLAN / SITE LAYOUT PLAN Drawing · 09 Jan 2023
  • PROPOSED BLOCK PLAN / SITE LAYOUT PLAN Drawing · 09 Jan 2023
  • EXISTING BOILER AND PUMP HOUSE ELEVATION A-A Drawing · 09 Jan 2023
  • EXISTING BOILER AND PUMP HOUSE ELEVATION B-B Drawing · 09 Jan 2023
  • EXISTING BOILER AND PUMP HOUSE ELEVATION C-C Drawing · 09 Jan 2023
  • EXISTING BOILER AND PUMP HOUSE ELEVATION D-D Drawing · 09 Jan 2023
  • PROPOSED BOILER HOUSE PLAN Drawing · 09 Jan 2023
  • PROPOSED BOILER HOUSE ELEVATION C-C Drawing · 09 Jan 2023
  • SITE LOCATION PLAN Drawing · 09 Jan 2023
  • PROPOSED BOILER HOUSE ELEVATION A-A Drawing · 09 Jan 2023
  • PROPOSED BOILER HOUSE ELEVATION B-B Drawing · 09 Jan 2023
  • DRAINAGE AND CONTAINMENT PLAN Drawing · 09 Jan 2023
  • UM STORAGE LIMITED, UM HULL WEST TERMINAL Application Form · 09 Jan 2023
  • A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL BackGround Papers · 09 Jan 2023
  • AIR QUALITY ASSESSMENT Report · 09 Jan 2023
  • NOTICE UNDER ARTICLE 13 Other · 09 Jan 2023
  • PRE-APP ADVICE NOTE Other · 09 Jan 2023
  • FLOOD RISK ASSESSMENT Report · 09 Jan 2023
  • PLANNING STATEMENT Report · 09 Jan 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Kingston upon Hull, City of granted permission on 6 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Kingston upon Hull, City of

  • 26/00964/FULL Awaiting decision

    37 Philip Larkin Close Kingston Upon Hull HU6 7FB

    Change of use of a single dwelling house into a 3 bed House in Multiple Occupation

    Received 5 Oct, published by the council 11 Oct 2026 Full applications
  • 26/00948/FULL Awaiting decision

    24-25 Bishop Lane Kingston Upon Hull HU1 1PA

    Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason

    Received 30 Sep, published by the council 11 Oct 2026 Full applications
  • 26/00827/FULL Granted

    4 Sunbeam Road Kingston Upon Hull HU4 6DZ

    1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).

    Received 22 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00820/FULL Granted

    36 Constable Street Kingston Upon Hull HU3 3BL

    Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)

    Received 20 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00335/FULL Granted

    Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU

    1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.

    Received 10 Apr, published by the council 21 Jul 2026 Full applications