Planning application
Ashcourt Contracts Ltd Recycling Site Foster Street Kingston Upon Hull HU8 8BT
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation/construction of a wash plant in association with existing concrete plant
As published by the council, reference 22/01612/FULL
Application record
- Reference
- 22/01612/FULL
- Type
- Full Planning Permission
- Status
- Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 28 Nov 2022
- Validated
- 29 Nov 2022
- Decided
- 23 Feb 2023
- Ward
- Drypool
- Decision by
- Delegated Decision
- Postcode
- HU8 8BT
Timeline
Dates from the published record
-
28 Nov 2022
Received by Kingston upon Hull, City of
-
29 Nov 2022
Validated
Checked as complete and ready for consideration.
-
23 Feb 2023
Decision issued: Application Permitted
-
9 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
41 documents on file for this application
- DECISION NOTICE
- OFFICERS DELEGATED REPORT
- E-MAILS
- HIGHWAYS DC UPDATED COMMENTS
- EXTENSION OF TIME
- E-MAILS
- EXTENSION OF TIME
- EMAILS TO AGENT 13/02/2023
- DALTON STREET WASH PLANT PARKING PLAN
- PARKING ARRANGEMENTS
- DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT
- E-MAIL CORRESPONDENCE WITH AGENT
- EMAIL FROM AGENT
- EMAILS 03/01/2023
- ENVIRONMENT AGENCY COMMENTS
- PUIBLIC PROTECTION COMMENTS
- YORKSHIRE WATER COMMENTS
- EMAIL FROM AGENT 29 NOV WITH INFO TO SATISFY DRAINAGE ISSUE
- E-MAIL FROM YORKSHIRE WATER
- INVALID LETTER
- CHECKSHEET
- ASHCOURT CONTRACTS LTD, RECYCLING SITE, FOSTER STREET
- A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL
- COVERING LETTER
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE DRAWING
- ILLUSTRATIVE PLAN VIEW
- THE LOCATION PLAN
- NOISE IMPACT ASSESSMENT
- PROPOSED ELEVATION AND PLAN VIEW
- TECHNICAL DRAWING
- TECHNICAL DETAILS
- TECHNICAL DETAILS
- TECHNICAL DETAILS
- TECHNICAL DETAILS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kingston upon Hull, City of granted permission on 23 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Unit 40 Stoneferry Park Foster Street Kingston Upon Hull HU8 8BT
Installation of flues for biomass boiler
Granted Prior approval 8 docs -
SGS Ltd Unit 39 Foster Street Kingston Upon Hull HU8 8BT
Non material amendment for 17/00537/FULL - Erection of a detached single story building to form offices and training rooms to support existing business activities
Granted Amendments 6 docs -
Ashcourt Contracts Ltd Concrete Batching Plant Foster Street Kingston Upon Hull HU8 8BT
discharge of conditions for 16/00906/FULL - Erection of single wind turbine of up to 77m (253ft) in height (blade tip) with ancillary development. - condition 3
Granted Conditions 4 docs -
SGS Ltd Unit 39 Foster Street Kingston Upon Hull HU8 8BT
Discharge of conditions 3 and 4 of approval ref. 17/00537/FULL - erection of detached single storey building to form offices and training rooms to support existing business activities
Granted Conditions 13 docsSmall domestic -
Premier Galvanising Ltd Unit 25 Stoneferry Park Foster Street Kingston Upon Hull HU8 8BT
New Extension and canopy to existing industrial building for Premier Galvanising ( 10.650m long x 17.77m wide x 6.838m high ).
Granted Full applications Extension 17 docs -
Cleveland Street Kingston Upon Hull HU8 8BB
Discharge of condition 45 of approval ref. 11/00615/CM - 1. The Development of an energy works consisting of various buildings and plant (such as silos, conveyor belts, air cooled condensers, weighbridges and stack - 70m [230ft] high) which will produce sustainable electricity and biomethane through Advanced Gasification (25 Mwe), Anaerobic Digestion (900,000 therms) and Solar Photovoltaic's (0.5Mwe). 2. Erection of additional infrastructure to include an energy academy and in vessel composting facility. 3. Laying out of servicing and parking areas and ramps and alterations to Glass House Row.
Granted Conditions 5 docs
Other full applications
In Kingston upon Hull, City of
-
26/00964/FULL Awaiting decision
37 Philip Larkin Close Kingston Upon Hull HU6 7FB
Change of use of a single dwelling house into a 3 bed House in Multiple Occupation
-
26/00948/FULL Awaiting decision
24-25 Bishop Lane Kingston Upon Hull HU1 1PA
Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason
-
26/00827/FULL Granted
4 Sunbeam Road Kingston Upon Hull HU4 6DZ
1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).
-
26/00820/FULL Granted
36 Constable Street Kingston Upon Hull HU3 3BL
Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)
-
26/00335/FULL Granted
Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU
1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.