Planning application
Castlehill Road Sutton-On-Hull Kingston Upon Hull
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Castlehill Flood Alleviation Scheme part of the Holderness Drain Flood Alleviation Scheme Including diversion of PROW. (Revised proposal and revised site boundary)
As published by the council, reference 21/00361/FULL
Application record
- Reference
- 21/00361/FULL
- Type
- Full Planning Permission
- Status
- Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 11 Mar 2021
- Validated
- 25 Oct 2021
- Decided
- 17 Jan 2022
- Ward
- Sutton
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
11 Mar 2021
Received by Kingston upon Hull, City of
-
25 Oct 2021
Validated
Checked as complete and ready for consideration.
-
17 Jan 2022
Decision issued: Application Permitted
-
9 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
JBA Consulting LTD Agent
34 applications on PlanIndex · across 20 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
180 documents on file for this application
- NON MATERIAL AMENDMENT
- NMA
- DISCHARGE OF CONDITONS NUMBERS 3, 4, 7, 8
- NOISE MANAGEMENT PLAN
- ENVIRONMENTAL HEALTH COMMENTS
- ENVIRONMENTAL HEALTH COMMENTS
- VIBRATION MANAGEMENT PLAN
- VIBRATION MONITORING PLAN
- DECISION NOTICE
- NON MATERIAL AMENDMENT
- OFFICER COVER EMAIL RE CONDITIONS DISCHARGE LETTER
- CONDITIONS DISCHARGE LETTER
- CHECKSHEET
- PHOTOS
- EMAILS
- OFFICERS DELEGATED REPORT
- DECISION NOTICE
- EMAIL FROM AGENT
- EMAIL FROM AGENT
- EMAIL TO APPLICANT PRECOMMENCEMENT CONDITIONS
- APPLICANTS COMMENTS
- APPLICANTS COMMENTS
- LOCATION PLAN
- JAMES BLYTHE EMAIL 3 DEC REF.CASTLEHILL RESPONSE TO ACCESS
- CASTLEHILL RESPONSE TO ACCESS
- ARBORICULTURAL IMPACT ASSESSMENT
- PUBLIC COMMENT (PA)
- PARKS AND OPEN SPACES COMMENTS
- TRANS PENNINE TRAIL COMMENTS
- PUBLIC PROTECTION COMMENTS
- PRESS NOTICE
- HUMBER ARCHAEOLOGY COMMENTS
- AGENT EMAIL 16 NOV RE URBAN DESIGN COMMENTS
- JLAF COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- FLOOD TEAM COMMENTS
- NATURAL ENGLAND COMMENTS
- PUBLIC COMMENT (PA)
- HISTORIC ENGLAND COMMENTS
- LOCAL PLAN OPEN SPACE COMMENTS
- YORKSHIRE WATER COMMENTS
- URBAN DESIGN COMMENTS
- HERITAGE IMPACT ASSESSMENT P1
- HERITAGE IMPACT ASSESSMENT P2
- HERITAGE IMPACT ASSESSMENT P3
- HERITAGE IMPACT ASSESSMENT P4
- HERITAGE IMPACT ASSESSMENT P5
- CONSERVATION COMMENTS
- REVISED DESIGN SOLUTION
- DRAINAGE IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- TREE SURVEY SCHEDULE
- FLOOD RISK ASSESSMENT
- PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 1
- SCHEME VISUALISATIONS- VIEWPOINT 4B
- ECOLOGICAL IMPACT ASSESSMENT FINAL REPORT
- D&B: REVIEW OF LAND CONTAMINATION ISSUES
- CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1
- CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2
- CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT
- CASTLEHILL RECREATIONAL ACCESS GENERAL ARRANGEMENT
- FLOOD RISK ASSESSMENT OCTOBER 2021
- TECHNICAL NOTE
- CASTLEHILL TREE LOCATION PLAN
- PLANNING, DESIGN AND ACCESS STATEMENT SEPTEMBER 2021
- EMAIL FOM AGENT 26/10/2021
- PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2
- SCHEME VISUALISATIONS- VIEWPOINT 3B
- CASTLEHILL TREE CONSTRAINTS PLAN
- CASTLEHILL MAIN WORKS SOUTH WEST IMPROVEMENT GENERAL ARRANGEMENT
- CASTLEHILL MAIN WORKS SOUTH WEST IMPROVEMENT LONGITUDINAL PROFILE
- WFD ASSESSMENT FINAL REPORT OCTOBER 2021
- PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2
- CASTLEHILL PUBLIC RIGHTS OF WAY
- CASTLEHILL NEW SUTTON CROSS DRAIN AND EAST CARR DRAIN CHANNEL SECTIONS - SHEET 1
- CASTLEHILL MAIN WORKS CUT AND FILL BALANCE
- HERITAGE IMPACT ASSESSMENT FINAL OCTOBER 2021
- AIA, AMS AND TREE SURVEY REPORT FINAL REPORT AUGUST 2021
- TREE SURVEY SCHEDULE
- CASTLEHILL SITE LOCATION PLAN
- CASTLEHILL MAIN WORKS PERMANENT WORKS OVERVIEW
- CASTLEHILL PROPOSED SCHEDULED MONUMENT WORKS
- CASTLEHILL SECTION LOCATION GA
- CASTLEHILL LANDSCAPE MASTERPLAN
- CASTLEHILL TREE PROTECTION PLAN
- REVIEW OF LAND CONTAMINATION ISSUES FIANL REPORT 15 08 2021
- SITE LOCATION PLAN
- PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2
- CASTLEHILL MAIN WORKS PERMANENT WORKS OVERVIEW
- CASTLEHILL PROPOSED SCHEDULED MONUMENT WORKS
- CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT
- REVIEW OF LAND CONTAMINATION ISSUES FIANL REPORT 15 08 2021
- PERMANENT MICELLANEOUS ACCESS DETAILS SHEET 1
- PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 3
- CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2
- CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT
- CASTELEHILLMAIN WORKS CUT AND FILL BALANCE
- SOUTH WEST IMPROVEMENT LONGITUDINAL PROFILE
- PLANNING DESIGN AND ACCESS STATEMENT
- ECOLOGICAL REPORT ASSESSMENT
- CASTLEHILL PUBLIC RIGHTS OF WAY
- CASTLEHILL SECTION LOCATION GA
- CASTLEHILL NEWE SUTTON CROSS DRAIN AND EAST CARR DRAIN CHANNEL SECTIONS - SHEET
- CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1
- CASTLEHILL_OPERATION_AND_MAINTENANCE_ACCESS_GENERAL_ARRANGEMENT
- CASTELEHILL RECREATIONAL ACCESS GENERAL ARRANGEMENT
- LANDSCAPE MASTER PLAN
- WATER FRAMEWORK DIRECTIVE ASSESSMENT
- SCHEME VISUALISATIONS - VIEWPOINT 4B
- TREE PROTECTION PLAN
- TREE CONSTRAITS PLAN
- TREE LOCATION PLAN
- SOUTH WEST IMPROVEMENT GENERAL ARRANGEMENT
- SCHEME VISUALISATIONS - VIEWPOINT 3B
- AGENT EMAIL 11 AUG AGREED EXTENSION OF TIME
- ENVIROMMENT AGENCY COMMENTS
- EMAIL EOT
- EXTENSION OF TIME
- HIGHWAYS COMMENTS
- YORKSHIRE WILDLIFE TRUST COMMENTS
- PUBLIC COMMENT
- POLICE COMMENTS
- YORKSHIRE WATER COMMENTS
- TPT CHANNEL BRIDGE
- TRANS PENINE TRAIL COMMENTS
- TPT CHANNEL BRIDGE
- HUMBER ARCHAEOLOGY COMMENTS
- PARKS AND OPEN SPACE COMMENTS
- PUBLIC COMMENTS
- EAST RIDING OF YORKSHIRE COUNCIL COMMENTS
- PUBLIC PROTECTION COMMENTS
- PUBLIC COMMENT (PA)
- FLOOD TEAM COMMENTS
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PRESS NOTICE
- PUBLIC COMMENT (PA)
- HISTORIC ENGLAND COMMENTS
- NATURAL ENGLAND COMMENTS
- PUBLIC COMMENT
- URBAN DESIGN COMMENTS
- ACCESS OFFICER COMMENTS
- RESPONSE FROM MMO
- RESPONSE FROM MMO
- RESPONSE FROM MMO
- SCHEME VISUALISATIONS VIEWPOINT 3B
- TREE CONSTRAINTS PLAN
- HERITAGE IMPACT ASSESSMENT
- PROPOSED SCHEDULED MONUMENT WORKS
- CASTLEHILL MAIN WORKS CUT AND FILL BALANCE
- ARBORICULTURAL IMPACT ASSESSMENT
- SPREADSHEET
- PERMANENT MISC ACCESS DETAILS SHEET 1
- LONG ELEVATION OF LANDSCAPING AND ENGINEERING WORKS
- WFD ASSESSMENT
- GEO ENV ASSESSMENT
- NOISE IMPACT ASSESSMENT
- OPERATION AND MAINTENANCE ACCESS GEN ARRANGEMENT
- MAIN WORKS PERMANENT WORKS OVERVIEW
- SECTION LOCATION GA
- PLANNING DESIGN AND ACCESS STATEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- APPENDIX 2, 3, AND 5
- SCHEME VISUALISATIONS VIEWPOINT 4B
- LANDSCAPE MASTERPLAN
- TREE CONSTRAINTS PLAN
- ENVIRONMENTAL IMPACT ASSESSMENT
- FLOOD RISK ASSESSMENT
- DRAINAGE IMPACT ASSESSMENT
- DESIGN STATEMENT TECHNICAL NOTE
- NEW SUTTON CROSS DRAIN CHANNEL SECTION SHEET 1
- HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2
- RECREATIONAL ACCESS GENERAL ARRANGEMENT
- CASTLE HILL ROAD
- SITE LOCATION PLAN
- PUBLIC RIGHTS OF WAY
- NEW SUTTON CROSS DRAIN CHANNEL SECTIONS SHEET 2
- NEW SUTTON CROSS DRAIN CHANNEL SECTIONS SHEET 3
- NEW SUTTON CROSS DRAIN CHANNEL LONG SECTION DETAILS
- HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kingston upon Hull, City of granted permission on 17 January 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Kingston upon Hull, City of
-
26/00964/FULL Awaiting decision
37 Philip Larkin Close Kingston Upon Hull HU6 7FB
Change of use of a single dwelling house into a 3 bed House in Multiple Occupation
-
26/00948/FULL Awaiting decision
24-25 Bishop Lane Kingston Upon Hull HU1 1PA
Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason
-
26/00827/FULL Granted
4 Sunbeam Road Kingston Upon Hull HU4 6DZ
1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).
-
26/00820/FULL Granted
36 Constable Street Kingston Upon Hull HU3 3BL
Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)
-
26/00335/FULL Granted
Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU
1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.