Planning application

Castlehill Road Sutton-On-Hull Kingston Upon Hull

Granted Kingston upon Hull, City of 21/00361/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Castlehill Flood Alleviation Scheme part of the Holderness Drain Flood Alleviation Scheme Including diversion of PROW. (Revised proposal and revised site boundary)

As published by the council, reference 21/00361/FULL

Application record

Reference
21/00361/FULL
Type
Full Planning Permission
Status
Application Permitted
Decision
Granted As published: Application Permitted
Received
11 Mar 2021
Validated
25 Oct 2021
Decided
17 Jan 2022
Ward
Sutton
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 11 Mar 2021

    Received by Kingston upon Hull, City of

  2. 25 Oct 2021

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jan 2022

    Decision issued: Application Permitted

  4. 9 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

JBA Consulting LTD Agent

34 applications on PlanIndex · across 20 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

180 documents on file for this application

  • NON MATERIAL AMENDMENT Application Form · 08 Dec 2023
  • NMA Other · 25 Apr 2023
  • DISCHARGE OF CONDITONS NUMBERS 3, 4, 7, 8 Application Form · 29 Mar 2023
  • NOISE MANAGEMENT PLAN Report · 27 Mar 2023
  • ENVIRONMENTAL HEALTH COMMENTS Correspondence · 27 Mar 2023
  • ENVIRONMENTAL HEALTH COMMENTS Correspondence · 27 Mar 2023
  • VIBRATION MANAGEMENT PLAN Report · 27 Mar 2023
  • VIBRATION MONITORING PLAN Report · 27 Mar 2023
  • DECISION NOTICE Decision · 27 Mar 2023
  • NON MATERIAL AMENDMENT Application Form · 19 May 2022
  • OFFICER COVER EMAIL RE CONDITIONS DISCHARGE LETTER Correspondence · 05 May 2022
  • CONDITIONS DISCHARGE LETTER Correspondence · 05 May 2022
  • CHECKSHEET BackGround Papers · 19 Jan 2022
  • PHOTOS Photo · 19 Jan 2022
  • EMAILS Correspondence · 19 Jan 2022
  • OFFICERS DELEGATED REPORT Report · 17 Jan 2022
  • DECISION NOTICE Decision · 17 Jan 2022
  • EMAIL FROM AGENT Correspondence · 22 Dec 2021
  • EMAIL FROM AGENT Correspondence · 22 Dec 2021
  • EMAIL TO APPLICANT PRECOMMENCEMENT CONDITIONS Correspondence · 21 Dec 2021
  • APPLICANTS COMMENTS Correspondence · 20 Dec 2021
  • APPLICANTS COMMENTS Correspondence · 20 Dec 2021
  • LOCATION PLAN Drawing · 08 Dec 2021
  • JAMES BLYTHE EMAIL 3 DEC REF.CASTLEHILL RESPONSE TO ACCESS Correspondence · 07 Dec 2021
  • CASTLEHILL RESPONSE TO ACCESS Correspondence · 07 Dec 2021
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 06 Dec 2021
  • PUBLIC COMMENT (PA) Public Comment · 24 Nov 2021
  • PARKS AND OPEN SPACES COMMENTS Correspondence · 23 Nov 2021
  • TRANS PENNINE TRAIL COMMENTS Correspondence · 22 Nov 2021
  • PUBLIC PROTECTION COMMENTS Correspondence · 19 Nov 2021
  • PRESS NOTICE Other · 18 Nov 2021
  • HUMBER ARCHAEOLOGY COMMENTS Correspondence · 17 Nov 2021
  • AGENT EMAIL 16 NOV RE URBAN DESIGN COMMENTS Correspondence · 16 Nov 2021
  • JLAF COMMENTS Correspondence · 16 Nov 2021
  • ENVIRONMENT AGENCY COMMENTS Correspondence · 16 Nov 2021
  • FLOOD TEAM COMMENTS Correspondence · 16 Nov 2021
  • NATURAL ENGLAND COMMENTS Correspondence · 16 Nov 2021
  • PUBLIC COMMENT (PA) Public Comment · 11 Nov 2021
  • HISTORIC ENGLAND COMMENTS Correspondence · 10 Nov 2021
  • LOCAL PLAN OPEN SPACE COMMENTS Correspondence · 09 Nov 2021
  • YORKSHIRE WATER COMMENTS Correspondence · 09 Nov 2021
  • URBAN DESIGN COMMENTS Correspondence · 09 Nov 2021
  • HERITAGE IMPACT ASSESSMENT P1 Report · 05 Nov 2021
  • HERITAGE IMPACT ASSESSMENT P2 Report · 05 Nov 2021
  • HERITAGE IMPACT ASSESSMENT P3 Report · 05 Nov 2021
  • HERITAGE IMPACT ASSESSMENT P4 Report · 05 Nov 2021
  • HERITAGE IMPACT ASSESSMENT P5 Report · 05 Nov 2021
  • CONSERVATION COMMENTS Correspondence · 29 Oct 2021
  • REVISED DESIGN SOLUTION Correspondence · 26 Oct 2021
  • DRAINAGE IMPACT ASSESSMENT Other · 26 Oct 2021
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 26 Oct 2021
  • TREE SURVEY SCHEDULE Report · 26 Oct 2021
  • FLOOD RISK ASSESSMENT Other · 26 Oct 2021
  • PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 1 Drawing · 26 Oct 2021
  • SCHEME VISUALISATIONS- VIEWPOINT 4B Drawing · 26 Oct 2021
  • ECOLOGICAL IMPACT ASSESSMENT FINAL REPORT Report · 26 Oct 2021
  • D&B: REVIEW OF LAND CONTAMINATION ISSUES Report · 26 Oct 2021
  • CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1 Drawing · 26 Oct 2021
  • CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2 Drawing · 26 Oct 2021
  • CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT Drawing · 26 Oct 2021
  • CASTLEHILL RECREATIONAL ACCESS GENERAL ARRANGEMENT Drawing · 26 Oct 2021
  • FLOOD RISK ASSESSMENT OCTOBER 2021 Report · 26 Oct 2021
  • TECHNICAL NOTE Other · 26 Oct 2021
  • CASTLEHILL TREE LOCATION PLAN Drawing · 26 Oct 2021
  • PLANNING, DESIGN AND ACCESS STATEMENT SEPTEMBER 2021 Report · 26 Oct 2021
  • EMAIL FOM AGENT 26/10/2021 Correspondence · 26 Oct 2021
  • PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2 Drawing · 26 Oct 2021
  • SCHEME VISUALISATIONS- VIEWPOINT 3B Drawing · 26 Oct 2021
  • CASTLEHILL TREE CONSTRAINTS PLAN Drawing · 26 Oct 2021
  • CASTLEHILL MAIN WORKS SOUTH WEST IMPROVEMENT GENERAL ARRANGEMENT Drawing · 26 Oct 2021
  • CASTLEHILL MAIN WORKS SOUTH WEST IMPROVEMENT LONGITUDINAL PROFILE Drawing · 26 Oct 2021
  • WFD ASSESSMENT FINAL REPORT OCTOBER 2021 Report · 26 Oct 2021
  • PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2 Drawing · 26 Oct 2021
  • CASTLEHILL PUBLIC RIGHTS OF WAY Drawing · 26 Oct 2021
  • CASTLEHILL NEW SUTTON CROSS DRAIN AND EAST CARR DRAIN CHANNEL SECTIONS - SHEET 1 Drawing · 26 Oct 2021
  • CASTLEHILL MAIN WORKS CUT AND FILL BALANCE Drawing · 26 Oct 2021
  • HERITAGE IMPACT ASSESSMENT FINAL OCTOBER 2021 Report · 26 Oct 2021
  • AIA, AMS AND TREE SURVEY REPORT FINAL REPORT AUGUST 2021 Report · 26 Oct 2021
  • TREE SURVEY SCHEDULE Photo · 26 Oct 2021
  • CASTLEHILL SITE LOCATION PLAN Drawing · 26 Oct 2021
  • CASTLEHILL MAIN WORKS PERMANENT WORKS OVERVIEW Drawing · 26 Oct 2021
  • CASTLEHILL PROPOSED SCHEDULED MONUMENT WORKS Drawing · 26 Oct 2021
  • CASTLEHILL SECTION LOCATION GA Drawing · 26 Oct 2021
  • CASTLEHILL LANDSCAPE MASTERPLAN Drawing · 26 Oct 2021
  • CASTLEHILL TREE PROTECTION PLAN Drawing · 26 Oct 2021
  • REVIEW OF LAND CONTAMINATION ISSUES FIANL REPORT 15 08 2021 Report · 25 Oct 2021
  • SITE LOCATION PLAN Drawing · 25 Oct 2021
  • PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 2 Report · 25 Oct 2021
  • CASTLEHILL MAIN WORKS PERMANENT WORKS OVERVIEW Drawing · 25 Oct 2021
  • CASTLEHILL PROPOSED SCHEDULED MONUMENT WORKS Drawing · 25 Oct 2021
  • CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT Drawing · 25 Oct 2021
  • REVIEW OF LAND CONTAMINATION ISSUES FIANL REPORT 15 08 2021 Report · 25 Oct 2021
  • PERMANENT MICELLANEOUS ACCESS DETAILS SHEET 1 Report · 25 Oct 2021
  • PERMANENT MISCELLANEOUS ACCESS DETAILS SHEET 3 Report · 25 Oct 2021
  • CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2 Drawing · 25 Oct 2021
  • CASTLEHILL OPERATION AND MAINTENANCE ACCESS GENERAL ARRANGEMENT Drawing · 25 Oct 2021
  • CASTELEHILLMAIN WORKS CUT AND FILL BALANCE Drawing · 25 Oct 2021
  • SOUTH WEST IMPROVEMENT LONGITUDINAL PROFILE Drawing · 25 Oct 2021
  • PLANNING DESIGN AND ACCESS STATEMENT Other · 25 Oct 2021
  • ECOLOGICAL REPORT ASSESSMENT Other · 25 Oct 2021
  • CASTLEHILL PUBLIC RIGHTS OF WAY Drawing · 25 Oct 2021
  • CASTLEHILL SECTION LOCATION GA Drawing · 25 Oct 2021
  • CASTLEHILL NEWE SUTTON CROSS DRAIN AND EAST CARR DRAIN CHANNEL SECTIONS - SHEET Drawing · 25 Oct 2021
  • CASTLEHILL HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1 Drawing · 25 Oct 2021
  • CASTLEHILL_OPERATION_AND_MAINTENANCE_ACCESS_GENERAL_ARRANGEMENT Drawing · 25 Oct 2021
  • CASTELEHILL RECREATIONAL ACCESS GENERAL ARRANGEMENT Drawing · 25 Oct 2021
  • LANDSCAPE MASTER PLAN Drawing · 25 Oct 2021
  • WATER FRAMEWORK DIRECTIVE ASSESSMENT Other · 25 Oct 2021
  • SCHEME VISUALISATIONS - VIEWPOINT 4B Drawing · 25 Oct 2021
  • TREE PROTECTION PLAN Drawing · 25 Oct 2021
  • TREE CONSTRAITS PLAN Drawing · 25 Oct 2021
  • TREE LOCATION PLAN Drawing · 25 Oct 2021
  • SOUTH WEST IMPROVEMENT GENERAL ARRANGEMENT Drawing · 25 Oct 2021
  • SCHEME VISUALISATIONS - VIEWPOINT 3B Drawing · 25 Oct 2021
  • AGENT EMAIL 11 AUG AGREED EXTENSION OF TIME Correspondence · 16 Aug 2021
  • ENVIROMMENT AGENCY COMMENTS Correspondence · 12 Aug 2021
  • EMAIL EOT Correspondence · 21 Jul 2021
  • EXTENSION OF TIME BackGround Papers · 11 Jun 2021
  • HIGHWAYS COMMENTS Correspondence · 02 Jun 2021
  • YORKSHIRE WILDLIFE TRUST COMMENTS Correspondence · 10 May 2021
  • PUBLIC COMMENT Public Comment · 27 Apr 2021
  • POLICE COMMENTS Correspondence · 23 Apr 2021
  • YORKSHIRE WATER COMMENTS Correspondence · 20 Apr 2021
  • TPT CHANNEL BRIDGE Correspondence · 16 Apr 2021
  • TRANS PENINE TRAIL COMMENTS Correspondence · 16 Apr 2021
  • TPT CHANNEL BRIDGE Correspondence · 16 Apr 2021
  • HUMBER ARCHAEOLOGY COMMENTS Correspondence · 14 Apr 2021
  • PARKS AND OPEN SPACE COMMENTS Correspondence · 13 Apr 2021
  • PUBLIC COMMENTS Correspondence · 13 Apr 2021
  • EAST RIDING OF YORKSHIRE COUNCIL COMMENTS Correspondence · 13 Apr 2021
  • PUBLIC PROTECTION COMMENTS Correspondence · 08 Apr 2021
  • PUBLIC COMMENT (PA) Public Comment · 07 Apr 2021
  • FLOOD TEAM COMMENTS Correspondence · 06 Apr 2021
  • PUBLIC COMMENT (PA) Public Comment · 05 Apr 2021
  • PUBLIC COMMENT (PA) Public Comment · 03 Apr 2021
  • PRESS NOTICE Other · 01 Apr 2021
  • PUBLIC COMMENT (PA) Public Comment · 01 Apr 2021
  • HISTORIC ENGLAND COMMENTS Correspondence · 01 Apr 2021
  • NATURAL ENGLAND COMMENTS Correspondence · 29 Mar 2021
  • PUBLIC COMMENT Public Comment · 23 Mar 2021
  • URBAN DESIGN COMMENTS Correspondence · 23 Mar 2021
  • ACCESS OFFICER COMMENTS Correspondence · 23 Mar 2021
  • RESPONSE FROM MMO Correspondence · 18 Mar 2021
  • RESPONSE FROM MMO Correspondence · 18 Mar 2021
  • RESPONSE FROM MMO Correspondence · 18 Mar 2021
  • SCHEME VISUALISATIONS VIEWPOINT 3B Drawing · 16 Mar 2021
  • TREE CONSTRAINTS PLAN Drawing · 16 Mar 2021
  • HERITAGE IMPACT ASSESSMENT Report · 16 Mar 2021
  • PROPOSED SCHEDULED MONUMENT WORKS Drawing · 16 Mar 2021
  • CASTLEHILL MAIN WORKS CUT AND FILL BALANCE Drawing · 16 Mar 2021
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 16 Mar 2021
  • SPREADSHEET Report · 16 Mar 2021
  • PERMANENT MISC ACCESS DETAILS SHEET 1 Drawing · 16 Mar 2021
  • LONG ELEVATION OF LANDSCAPING AND ENGINEERING WORKS Drawing · 16 Mar 2021
  • WFD ASSESSMENT Report · 16 Mar 2021
  • GEO ENV ASSESSMENT Report · 16 Mar 2021
  • NOISE IMPACT ASSESSMENT Report · 16 Mar 2021
  • OPERATION AND MAINTENANCE ACCESS GEN ARRANGEMENT Drawing · 16 Mar 2021
  • MAIN WORKS PERMANENT WORKS OVERVIEW Drawing · 16 Mar 2021
  • SECTION LOCATION GA Drawing · 16 Mar 2021
  • PLANNING DESIGN AND ACCESS STATEMENT Report · 16 Mar 2021
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 16 Mar 2021
  • APPENDIX 2, 3, AND 5 Drawing · 16 Mar 2021
  • SCHEME VISUALISATIONS VIEWPOINT 4B Drawing · 16 Mar 2021
  • LANDSCAPE MASTERPLAN Drawing · 16 Mar 2021
  • TREE CONSTRAINTS PLAN Drawing · 16 Mar 2021
  • ENVIRONMENTAL IMPACT ASSESSMENT Report · 16 Mar 2021
  • FLOOD RISK ASSESSMENT Report · 16 Mar 2021
  • DRAINAGE IMPACT ASSESSMENT Report · 16 Mar 2021
  • DESIGN STATEMENT TECHNICAL NOTE Report · 16 Mar 2021
  • NEW SUTTON CROSS DRAIN CHANNEL SECTION SHEET 1 Drawing · 15 Mar 2021
  • HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 2 Drawing · 15 Mar 2021
  • RECREATIONAL ACCESS GENERAL ARRANGEMENT Drawing · 15 Mar 2021
  • CASTLE HILL ROAD Application Form · 15 Mar 2021
  • SITE LOCATION PLAN Drawing · 15 Mar 2021
  • PUBLIC RIGHTS OF WAY Drawing · 15 Mar 2021
  • NEW SUTTON CROSS DRAIN CHANNEL SECTIONS SHEET 2 Drawing · 15 Mar 2021
  • NEW SUTTON CROSS DRAIN CHANNEL SECTIONS SHEET 3 Drawing · 15 Mar 2021
  • NEW SUTTON CROSS DRAIN CHANNEL LONG SECTION DETAILS Drawing · 15 Mar 2021
  • HOLDERNESS DRAIN CHANNEL SECTIONS SHEET 1 Drawing · 15 Mar 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Kingston upon Hull, City of granted permission on 17 January 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Kingston upon Hull, City of

  • 26/00964/FULL Awaiting decision

    37 Philip Larkin Close Kingston Upon Hull HU6 7FB

    Change of use of a single dwelling house into a 3 bed House in Multiple Occupation

    Received 5 Oct, published by the council 11 Oct 2026 Full applications
  • 26/00948/FULL Awaiting decision

    24-25 Bishop Lane Kingston Upon Hull HU1 1PA

    Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason

    Received 30 Sep, published by the council 11 Oct 2026 Full applications
  • 26/00827/FULL Granted

    4 Sunbeam Road Kingston Upon Hull HU4 6DZ

    1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).

    Received 22 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00820/FULL Granted

    36 Constable Street Kingston Upon Hull HU3 3BL

    Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)

    Received 20 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00335/FULL Granted

    Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU

    1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.

    Received 10 Apr, published by the council 21 Jul 2026 Full applications