Planning application
Queens Gardens Kingston Upon Hull
Works: Demolition Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Engineering works including the demolition and/or removal of walls, ramps, steps, railings, lighting, street furniture and other features, hard surfacing, and kerbs and edging. The construction of new walls, ramps, steps, terracing, railings, lighting columns including c15m high feature columns, street furniture, and other features including interpretation and public art, hard surfacing, kerbs and edging, and drainage works, and levelling of sunken peace garden. Soft landscaping including the removal and planting of trees to include new attenuation tree pits Demolition of existing cafe building and erection of combined electricity sub-station, switch room, and gardener's store. (AMENDED PLANS)
As published by the council, reference 20/01543/FULL
Application record
- Reference
- 20/01543/FULL
- Type
- Full Planning Permission
- Status
- Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 11 Dec 2020
- Validated
- 21 Jan 2021
- Decided
- 16 Nov 2021
- Ward
- St Andrews And Dockland
- Decision by
- Committee Decision
- Postcode
- HU1 3DJ
Timeline
Dates from the published record
-
11 Dec 2020
Received by Kingston upon Hull, City of
-
21 Jan 2021
Validated
Checked as complete and ready for consideration.
-
16 Nov 2021
Decision issued: Application Permitted
-
9 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 20/01544/LBC (Application Received)
Who's behind it
Company information only, from the register and Companies House
Purcell LLP Agent
239 applications on PlanIndex · across 45 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
219 documents on file for this application
- DISCHARGE OF CONDITIONS NO 7
- ENVIRONMENTAL HEALTH COMMENTS
- PUBLIC COMMENT (PA)
- DECISION NOTICE
- PUBLIC COMMENT (PA)
- METHOD STATEMENT
- CTTEE REQUEST TO SPEAK
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PLANNING COMMITTEE REPORT 16 NOV 2021
- LETTERS INFORMING OF PLANNING CTTEE
- BAT SURVEY
- OPEN SPACES COMMENTS
- PARKS AND OPEN SPACES COMMENTS
- PARKS AND OPEN SPACES COMMENTS
- CAAC COMMENTS
- QUEENS GARDENS COLOUR MASTERPLAN
- PRESS NOTICE EXTRACT
- BAUDER XF301 SEDUM SYSTEM
- PROPOSED OFF-SITE REPLACEMENT PLANTING
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- HUMBER ARCHAEOLOGY COMMENTS
- HISTORIC ENGLAND COMMENTS
- YWS COMMENTS
- PUBLIC PROTECTION COMMENTS
- LOCAL PLAN OPEN SPACE COMMENTS
- CONSERVATION OFFICER COMMENTS
- PUBLIC COMMENT
- PUBLIC COMMENT
- PUBLIC COMMENT
- TREE WORKS SCHEDULE
- SITE WIDE SEEDING AND TURF PLAN
- SOFT LANDSCAPE GENERAL ARRANGEMENT
- TREE PIT 10 AND DRAINAGE CROSS SECTION
- DETAILED PLANTING SPECIFICATION
- GROUND PREPERATION PLAN
- TREE PIT SOIL REMOVAL
- SITE WIDE BULB PLANTING PLAN
- ROOT CELL LAYOUT TREE PIT NUMBER 4 TO 5
- ROOT CELL LAYOUT TREE PIT NUMBER 10 TO 11
- ECOLOGICAL ENHANCEMENT
- DETAILED PLANTING PROPOSALS AREA A SHEET 1 OF 5
- DETAILED TREE PIT TYPE 5
- DRAWING SCHEDULE
- ROOT CELL LAYOUT TREE PIT NUMBER 6 TO 9
- DETAILED TREE PLANTING PROPOSALS
- DETAILED TREE PLANTING PROPOSALS AREA B SHEET 2 OF 5
- DETAILED TREE PLANTING PROPOSALS AREA D SHEET 4 OF 5
- DETAILED TREE PIT TYPE 1 TO 4
- ROOT CELL LAYOUT TREE PIT NUMBER 1 TO 3
- DETAILED PLANTING PROPOSALS AREA C SHEET 3 OF 5
- DETAILED PLANTING PROPOSALS AREA E SHEET 5 OF 5
- TREE REMOVALS AND PROTECTION PLAN
- DETAILED PLANTING SCHEDULE
- PUBLIC COMMENT
- PARKS AND OPEN GARDENS COMMENTS
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC PROTECTION COMMENTS
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- OPEN SPACE COMMENTS
- PUBLIC COMMENT
- ARCHAEOLOGY
- PUBLIC COMMENT
- PUBLIC COMMENT
- PUBLIC COMMENT (PA)
- YWS COMMENTS
- PUBLIC COMMENT (PA)
- URBAN DESIGN COMMENTS
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- CAAC COMMENTS
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- PUBLIC COMMENT (PA)
- OPEN SPACES COMMENTS
- DESIGN AND ACCESS STATEMENT
- HISTORIC ENGLAND COMMENTS
- PRESS NOTICE 3 FEB 2021
- CONSERVATION COMMENTS
- CONSERVATION COMMENTS PAGE 2
- LATINA
- PROPOSED POWER AND DUCTING
- PROPOSED EXTERNAL LIGHTING
- BIODIVERSITY SURVEY AND REPORT
- BLOCK PLAN OF THE SITE
- HERITAGE STATEMENT
- LAND CONTAMINATION ASSESSMENT
- PHOTOGRAPHS & PHOTOMONTAGES
- QG SUB STATION / CAFE ELEVATIONS AS EXISTING
- QG SUB STATION PLANS AND ELEVATIONS AS PROPOSED
- QUEENS GARDENS COLOUR MASTERPLAN
- EXISTING FEATURES AND STREET FURNITURE RECORD DRAWING
- HARDWORKS REMOVALS WALLS AND STEPS REMOVALS SHEET 1 OF 6
- HARDWORKS REMOVALS PLAN SURFACE REMOVALS SHEET 2 OF 6
- EXISTING HARD SURFACES MATERIALS
- EXISTING STREET LIGHTING
- HARD LANDSCAPE GENERAL ARRANGEMENT
- HARD WORKS REMOVALS PLAN STRUCTURES REMOVALS SHEET 5 OF 6
- HARD WORKS REMOVALS RAILING AND STREET FURNITURE REMOVALS SHEET 4 OF 6
- HARD WORKS REMOVAL PLAN LIGHTING REMOVALS SHEET 6 OF 6
- DETAILED LEVELS AND DRAINAGE LAYOUT AREA B SHEET 2 OF 5
- DETAILED LEVELS AND DRAINAGE LAYOUT SHEET 4 OF 5
- DETAILED LEVELS AND DRAINAGE LAYOUT AREA A SHEET 1 OF 5
- DETAILED LEVELS AND DRAINAGE LAYOUT SHEET 3 OF 5
- SURFACE LAYOUT AREA B SHEET 2 OF 5
- DETAILED LEVELS AND DRAINAGE LAYOUT SHEET 5 OF 5
- SURFACE LAYOUT AREA C SHEET 3 OF 5
- SURFACE LAYOUT AREA A SHEET 1 OF 5
- SURFACE LAYOUT AREA D SHEET 4 OF 5
- KERBS AND EDGES LAYOUT AREA A SHEET 1 OF 5
- KERBS AND EDGES LAYOUT AREA C SHEET 3 OF 5
- KERBS AND EDGES LAYOUT AREA B SHEET 2 OF 5
- WALL AND STEPS AREA A SHEET 1 OF 6
- WALL AND STEPS AREA C SHEET 3 OF 6
- WALL AND STEPS AREA D SHEET 4 OF 6
- STREET FURNITURE AREA C SHEET 3 OF 5
- STREET FURNITURE AREA A SHEET 1 OF 5
- STREET FURNITURE AREA D SHEET 4 OF 5
- ROSE BOWL HARD WORKS DETAILS
- NORTHERN BOUNDARY HARD WORKS DETAILS SHEET 1 OF 2
- STREET FURNITURE AREA E SHEET 5 OF 5
- NORTHERN BOUNDARY HARD WORKS DETAILS SHEET 2 OF 2
- STREET FURNITURE AREA B SHEET 2 OF 5
- WILBERFORCE DRIVE HARD WORKS DETAILS
- TYPICAL RAILING DETAIL
- GUILDHALL ROAD HARD WORKS DETAILS SHEET 1 OF 3
- GUILDHALL ROAD HARD WORKS DETAILS SHEET 3 OF 3
- GUILDHALL ROAD HARD WORKS DETAILS SHEET 2 OF 3
- TYPICAL BOUNDARY ELEVATIONS ELEVATION C-C PART 1-3 SHEET 5 OF 8
- AMPHITHEATER SEATING DETAIL SHEET 3 OF 4
- AMPHITHEATER STEP DETAIL SHEET 4 OF 4
- TYPICAL BOUNDARY ELEVATIONS ELEVATION A-A PART 4-6 OF 8 SHEET 2 OF 8
- TYPICAL BOUNDARY ELEVATIONS ELEVATION D-D PART 1-3 OF 9 SHEET 6 OF 8
- TYPICAL BOUNDARY ELEVATIONS ELEVATION D-D PART 7-9 OF 9 SHEET 8 OF 8
- DETAILED PLANTING SCHEDULES
- GROUND PREPARATION PLAN
- SITE WIDE SEEDING AND TURF PLAN
- TREE REMOVALS AND PROTECTION PLAN
- SOFT LANDSCAPE GENERAL ARRANGEMENT
- DETAILED PLANTING PROPOSALS AREA A SHEET 1 OF 5
- SITE WIDE BULB PLANTING PLAN
- DETAILED PLANTING PROPOSALS AREA C SHEET 3 OF 5
- DETAILED PLANTING PROPOSALS AREA D SHEET 4 OF 5
- DETAILED PLANTING PROPOSALS AREA B SHEET 2 OF 5
- DETAILED TREE PIT DETAIL TYPE 1 TO 4
- DETAILED PLANTING PROPOSALS AREA E SHEET 5 OF 5
- DETAILED TREE PLANTING PROPOSALS
- STRUCTURAL SURVEY
- STRUCTURAL SURVEY
- SUDS SUPPORTING INFORMATION
- TELECOMS SUPPLEMENTARY INFO
- TELECOMS SUPPLEMENTARY INFO
- THE LOCATION PLAN
- USER DEFINED ATTACHMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- 3D TOPOGRAPHIC SURVEY
- ARTIST COMMISSIONING WITHIN THE QUEENS GARDENS PROJECT
- OUTLINE OF FINAL DESIGN PROPOSAL
- PUBLIC ART PROPOSAL
- USER DEFINED ATTACHMENT
- A SUMMARY OF THE ATTACHMENTS IN THE PROPOSAL
- QUEENS GARDENS
- DRAINAGE DOCUMENTATION
- HARD WORKS REMOVALS KERBS AND EDGES REMOVALS SHEET 3 OF 6
- KERBS AND EDGES LAYOUT AREA D SHEET 4 OF 5
- SURFACE LAYOUT AREA E SHEET 5 OF 5
- KERBS AND EDGES LAYOUT AREA E SHEET 5 OF 5
- WALL AND STEPS AREA B SHEET 2 OF 6
- WALL AND STEPS SPECIFICATION SHEET 6 OF 6
- WALL AND STEPS AREA E SHEET 5 OF 6
- TYPICAL BOUNDARY ELEVATIONS ELEVATION B-B PART 1-3 SHEET 4 OF 8
- TYPICAL BOUNDARY ELEVATIONS ELEVATION A-A PART 7-8 OF 8 SHEET 3 OF 8
- AMPHITHEATER SEATING DETAIL SHEET 1 OF 4
- AMPHITHEATER SEATING DETAIL SHEET 2 OF 4
- TYPICAL BOUNDARY ELEVATIONS ELEVATION D-D PART 4-6 OF 9 SHEET 7 OF 8
- TYPICAL BOUNDARY ELEVATIONS ELEVATION A-A PART 1-3 OF 8 SHEET 1 OF 8
- DETAILED TREE PIT DETAIL TYPE 5
- TREE SURVEY
- DETAILED UNEXPLODED ORDNANCE RISK ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kingston upon Hull, City of granted permission on 16 November 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ
100% historically approved · decision due ~19 Oct
Discharge of conditions 20/01543/FULL - Engineering works including the demolition and/or removal of walls, ramps, steps, railings, lighting, street furniture and other features, hard surfacing, and kerbs and edging. The construction of new walls, ramps, steps, terracing, railings, lighting columns including c15m high feature columns, street furniture, and other features including interpretation and public art, hard surfacing, kerbs and edging, and drainage works, and levelling of sunken peace garden. Soft landscaping including the removal and planting of trees to include new attenuation tree pits Demolition of existing cafe building and erection of combined electricity sub-station, switch room, and gardener's store. (AMENDED PLANS) - Conditions 19 and 20
Awaiting decision Conditions Demolition Trees 15 docs -
Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ
100% historically approved · decision due ~7 Aug
Discharge of conditions 3, 5, 6, 7, 8 ,9, 10, 11, 13,14,16,17, 18 and 21 of approval 20/01543/FULL.
Awaiting decision Conditions 13 docs -
Former Police Station Queens Dock Avenue Kingston Upon Hull HU1 3DJ
Non material amendment for 16/01763/FULL - Change of Use and Extension of Building to form 89 Apartments (68 in existing building and 21 in new two storey roof extension), involving:- (i)Two storey extension to roof and elevational changes; (ii)Use of south-east ground floor corner for either Shops (A1) or Cafe (A3) or 6 apartments; (iii) Pedestrianisation of Queen's Dock Avenue (part).
Granted Amendments New dwelling Extension 3 docsMajor scheme -
Former Police Station Queens Dock Avenue Kingston Upon Hull HU1 3DJ
Non Material amendment for 16/01763/FULL - Change of Use and Extension of Building to form 89 Apartments (68 in existing building and 21 in new two storey roof extension), involving:- (i)Two storey extension to roof and elevational changes; (ii)Use of south-east ground floor corner for either Shops (A1) or Cafe (A3) or 6 apartments; (iii) Pedestrianisation of Queen's Dock Avenue (part).
Decided Amendments New dwelling Extension 7 docsMajor scheme -
Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ
100% historically approved · decision due ~1 May
Discharge of conditions 3, 4, 5, 12, 22 and 23 of approval 20/01543/FULL.
Awaiting decision Conditions -
Queens Gardens Queens Dock Avenue Kingston Upon Hull HU1 3DJ
100% historically approved · decision due ~25 Apr
Discharge of conditions 3, 4, 9, 12, 16, 18, 22 and 23of approval 20/01543/FULL.
Awaiting decision Conditions 143 docs
Other full applications
In Kingston upon Hull, City of
-
26/00964/FULL Awaiting decision
37 Philip Larkin Close Kingston Upon Hull HU6 7FB
Change of use of a single dwelling house into a 3 bed House in Multiple Occupation
-
26/00948/FULL Awaiting decision
24-25 Bishop Lane Kingston Upon Hull HU1 1PA
Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason
-
26/00827/FULL Granted
4 Sunbeam Road Kingston Upon Hull HU4 6DZ
1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).
-
26/00820/FULL Granted
36 Constable Street Kingston Upon Hull HU3 3BL
Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)
-
26/00335/FULL Granted
Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU
1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.