Planning application
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of plant and infrastructure machinery to optimise the manufacturing process associated with the Paper Mill
As published by the council, reference 26/00184/FM
Application record
- Reference
- 26/00184/FM
- Type
- Full Application - Major Development
- Status
- Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 30 Jan 2026
- Validated
- 30 Jan 2026
- Decided
- 30 Apr 2026
- Ward
- South And West Lynn
- Parish
- King's Lynn
- Decision by
- Delegated Decision
- Postcode
- PE34 3AL
Site history
Applications at this address on the King’s Lynn and West Norfolk register
This site has had 5 applications since 2016: 5 approved, 0 refused.
-
26/00184/DISC_A Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 5, 6 AND 7 FROM PLANNING PERMISSION 26/00184/FM - Installation of plant and infrastructure machinery to optimise the manufacturing process associated with the Paper Mill
-
25/01610/DISC_A Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 5, 6, 7 ATTACHED TO PLANNING PERMISSION 25/01610/FM - Extension to the existing effluent treatment plant to enable anaerobic treatment of the existing wastewater
-
15/02090/DISC_B Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 4: High pressure gas pipeline between National Grid National Transmission System and Palm Paper mill site, including above ground Pressure Reduction Meeting Station and minimum offtake connection and associated access, landscaping and means of enclosure
-
15/02090/DISC_A Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 6 AND 7: High pressure gas pipeline between National Grid National Transmission System and Palm Paper mill site, including above ground Pressure Reduction Meeting Station and minimum offtake connection and associated access, landscaping and means of enclosure
Timeline
Dates from the published record
-
30 Jan 2026
Received by King’s Lynn and West Norfolk
-
30 Apr 2026
Decision issued: Application Permitted
-
9 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00184/DISC_A Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 5, 6 AND 7 FROM PLANNING PERMISSION 26/00184/FM - Installation of plant and infrastructure machinery to optimise the manufacturing process associated with the Paper Mill
Who's behind it
Company information only, from the register and Companies House
DHA Planning Ltd Agent, a planning consultancy registered in Maidstone
Active · incorporated 1992 · Maidstone
513 applications on PlanIndex · across 60 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordPalm Paper Ltd Applicant, registered in Kings Lynn
Active · incorporated 1964 · Kings Lynn
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
42 documents on file for this application
- DECISION
- OFFICER REPORT
- AGENT CORRESPONDENCE
- CSNN HANNAH MARSTERS
- ANGLIAN WATER CORRESPONDENCE
- ANGLIA WATER RESPONSE
- ANGLIA WATER EMAIL
- ENVIRONMENTAL QUALITY - ASHLEY WHEELER
- ENVIRONMENT AGENCY COMMENTS
- EAST OF OUSE POLVER AND NAR IDB COMMENTS
- NATURAL ENGLAND COMMENTS
- APPLICATION FORM
- PLANNING STATEMENT
- BNG MATRIX
- BIODIVERSITY NET GAIN ASSESSMENT REPORT
- SUSTAINABILITY AND CLIMATE CHANGE STATEMENT
- ENVIRONMENTAL SCREENING INFORMATION REPORT
- NOISE ASSESSMENT
- EXTERNAL NOISE TEST ASSESSMENT
- PREDICTION OF THE NOISE CAUSED BY THE PLANNED COMPONENTS
- FORMER SUGAR BEET FACTORY FLOOD RISK ASSESSMENT
- CCGT PLANT FLOOD RISK ASSESSMENT
- CULTURAL HERITAGE
- VIEWPOINT ASSESSMENT
- AREAS OF IMPORTANT LANDSCAPE QUALITY
- LOCALLY AND NATIONALLY DESIGNATED SITES WITHIN 2KM RADIUS
- SITE LOCATION PLAN WITH RED LINE BOUNDARY
- SITE LOCATION
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- REMEDIATION VALIDATION REPORT
- VALIDATION OF BIOREMEDIATION AREA
- SITE INVESTIGATION PHASE 2 PHASING LAYOUT
- DRAINAGE CONCEPT
- SOUTH EAST AND SOUTH WEST ELEVATIONS
- NORTH EAST ELEVATIONS
- EXISTING ELEVATIONS SOUTH EAST AND SOUTH WEST
- EXISTING ELEVATION NORTH EAST
- SITE LOCATION PLAN RED LINING
- SITE INSTALLATION PLAN
- SITE LOCATION PLAN EXISTING
- SITE LOCATION PLAN
- LAYOUT LEVEL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
King’s Lynn and West Norfolk granted permission on 30 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 5, 6 AND 7 FROM PLANNING PERMISSION 26/00184/FM - Installation of plant and infrastructure machinery to optimise the manufacturing process associated with the Paper Mill
Granted Conditions 14 docs -
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 5, 6, 7 ATTACHED TO PLANNING PERMISSION 25/01610/FM - Extension to the existing effluent treatment plant to enable anaerobic treatment of the existing wastewater
Granted Conditions Extension 25 docs -
RISE Scaffold Services Ltd Acer Road Saddlebow Industrial Estate King's Lynn Norfolk PE34 3HN
88% historically approved · decision due ~3 Dec
Construction of 3 x industrial units involving the demolition of the existing scaffold racking
Awaiting decision Full applications Demolition -
Omex Agrifluids Ltd Saddlebow Road King's Lynn Norfolk PE34 3AG
The previous PortaKabin office building has been removed and the land has recently been re-concreted. This application seeks permanent planning permission to erect a steel sheet storage building in its place.
Granted Full applications 13 docs -
C & A Superbikes Unit 11 Willow Road Willows Business Park King's Lynn Norfolk
DISCHARGE OF CONDITION 3: Additional car/van sales area and construction of workshop
Granted Conditions -
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 4: High pressure gas pipeline between National Grid National Transmission System and Palm Paper mill site, including above ground Pressure Reduction Meeting Station and minimum offtake connection and associated access, landscaping and means of enclosure
Granted Conditions
Other full applications
In King’s Lynn and West Norfolk
-
26/00979/F Withdrawn
Land N of 57 And 67 Fen Road Rowan Close Watlington Norfolk PE33 0UG
SELF BUILD: Substitution of house type including change of materials and position of a detatched garage on existing planning permission No 06/00145FM
-
26/01476/F Decided
Whitehouse Farm Abbey Road Pentney King's Lynn Norfolk PE32 1JT
Erection of Agricultural Pole Barn over existing concrete yard
-
26/01142/F Decided
Melanna 25 Ryston End Downham Market Norfolk PE38 9AX
Householder: Part Retrospective: Conversion of first floor area of existing garage to annexe and single story rear extension to dwelling, new boundary treatment and retention of patio area
-
26/01438/F Decided
Driftwood 32 Dale End Brancaster Staithe King's Lynn Norfolk PE31 8DA
HOUSEHOLDER: Extension and alterations to dwelling allowing for external finish changes
-
26/01402/F Decided
Alwyn House Market Lane Crimplesham King's Lynn Norfolk PE33 9DZ
Householder - Extensions and Alterations to Dwelling and Proposed Garage