Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Accessed Between 144 And 150 Grimston Road Grimston Road South Wootton Norfolk

Granted King’s Lynn and West Norfolk 23/02104/F Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

VARIATION OF CONDITION 1 OF PLANNING CONSENT 20/00666/RMM -Reserved Matters Application for consent for all reserved matters following outline planning permission

As published by the council, reference 23/02104/F

Application record

Reference
23/02104/F
Type
Full Application
Status
Application Permitted
Decision
Application Permitted
Received
24 Nov 2023
Validated
24 Jan 2024
Decided
18 Oct 2024
Ward
The Woottons
Parish
South Wootton
Decision by
Delegated Decision

Site history

Applications at this address on the King’s Lynn and West Norfolk register

This site has had 3 applications since 2023: 2 approved, 0 refused.

  • 15/01782/VAR1B Awaiting decision

    Land Accessed Between 144 And 150 Grimston Road Grimston Road South Wootton Norfolk

    Modification of planning obligation LC/S106/18/32 relating to planning application reference 15/01782/OM

    Submitted 21 Aug 2025 Conditions
  • 15/01782/NMAM_1 Granted

    Land Accessed Between 144 And 150 Grimston Road Grimston Road South Wootton Norfolk

    NON MATERIAL AMENDMENT TO OUTLINE PLANNING PERMISSION 15/01782/OM: Outline application with all matters reserved for proposed residential development with access off Grimston Road. Land accessed between 144 and 150 Grimston Road South Wootton

    Decided 18 Apr 2023 Amendments

Timeline

Dates from the published record

  1. 24 Nov 2023

    Received by King’s Lynn and West Norfolk

  2. 24 Jan 2024

    Validated

    Checked as complete and ready for consideration.

  3. 18 Oct 2024

    Decision issued: Application Permitted

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

78 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

King’s Lynn and West Norfolk granted permission on 18 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In King’s Lynn and West Norfolk

  • 26/01425/F Awaiting decision

    Fridhem Rest Home 79 Station Road Heacham King's Lynn Norfolk PE31 7AB

    Replacement porch and laundry room extension.

    1 Sep 2026 Full applications
  • 26/01416/F Awaiting decision

    17 Mill Green Burnham Market King's Lynn Norfolk PE31 8DY

    Householder - Proposed loft conversion, with front extension to dwelling. Removal of existing conservatory to rear, and replacement single-storey rear extension. Associated internal remodelling of dwelling. Replacement of flat roof to detached garage with pitched roof

    1 Sep 2026 Full applications
  • 26/01415/F Awaiting decision

    Meribel Cottage 4 Stoney Road Roydon King's Lynn Norfolk PE32 1AP

    HOUSEHOLDER: Single storey rear extension.

    28 Aug 2026 Full applications
  • 26/01457/F Awaiting decision

    5 Beech Drift Manor Road Dersingham King's Lynn Norfolk PE31 6LF

    Householder - Proposed front single storey extension following removal of existing conservatory structure

    28 Aug 2026 Full applications
  • 26/01414/F Awaiting decision

    Seasplurge 25 Beach Road Holme next The Sea Hunstanton Norfolk PE36 6LG

    Variation of condition 2 of planning permission 25/01901/F - To vary the works approved to the existing garage and link, to allow for removal of existing garage and construction of single storey extension to replace

    28 Aug 2026 Full applications