Planning application
Land At E583101 N343220 Main Road Burnham Norton Norfolk
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
CONSULTATION UNDER S37 OF THE ELECTRICITY ACT 1989: Additional poles in existing overhead line
As published by the council, reference 20/00313/S37
Application record
- Reference
- 20/00313/S37
- Type
- S37 Electricity Act 1989
- Status
- Awaiting decision
- Decision
- No Comments
- Received
- 24 Feb 2020
- Validated
- 24 Feb 2020
- Decided
- 11 May 2020
- Ward
- Burnham Market And Docking
- Parish
- Burnham Norton
Timeline
Dates from the published record
-
24 Feb 2020
Received by King’s Lynn and West Norfolk
-
11 May 2020
Decision issued: No Comments
-
8 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
King’s Lynn and West Norfolk has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Coal Yard Barn 2 Blacksmiths Lane Burnham Norton King's Lynn Norfolk PE31 8EG
Erection of an extension in the space between the existing house and garage. Extension to be of same style as the existing house and will house a bedroom, utility, boots room and shower on the ground floor, and two bedrooms and a bathroom on the first floor.
Granted Full applications Extension 46 docs -
Hill Stile House 26 Norton Street Burnham Norton KINGS LYNN Norfolk PE31 8DR
T1 Pine - remove branches overhanging roof. T2 Poplar - remove branches overhanging roof within Conservation Area.
Granted Trees 3 docs -
Annexe At Hill Stile House 26 Norton Street Burnham Norton Norfolk
Retrospective Application for the change of use of an existing annexe to allow use for short stay holiday accommodation
Granted Full applications 15 docs -
Creek Cottage 24 Norton Street Burnham Norton King's Lynn Norfolk PE31 8DR
T1 conifer reduction of 25% to allow light into upper windows on house. Removal of dead stems in center of tree due to decay. T2 holly 20% canopy reduction to open up view over marsh from bedroom window.
Granted Trees 7 docs -
Norton Hall Farm 34 Norton Street Burnham Norton King's Lynn Norfolk PE31 8DR
90% historically approved · decision due ~20 Nov
TREES IN CONSERVATION AREA: T1- Mature Copper Beech located adjacent to the main entrance on the east side of the property. Ground around the entire base is covered by Meripilus giganteus (Giant polypore) fruiting bodies. Due to the nature of the white rot fungi attacking the roots of the tree and the volume of fruiting bodies the best course of action would be to dismantle and remove the tree as soon as possible to avoid tree blowing over in strong winds. T2- Black Poplar leaning over drive way has fungal fruiting bodies around base of stem with basal decay surrounding the majority of the base also. Best course of action would be to dismantle/ fell to mitigate any risk given the trees exposed location directly over driveway.
Awaiting decision Trees -
Coal Yard Barns 2 Blacksmiths Lane Burnham Norton King's Lynn Norfolk PE31 8DR
HOUSEHOLDER: Proposed intallation of air conditioning
Withdrawn Full applications 10 docsDomestic
Other less common application types
In King’s Lynn and West Norfolk
-
26/00669/CM Granted
Holly Meadows School 41 Vong Lane Pott Row King's Lynn Norfolk PE32 1BW
DISCHARGE OF CONDITION 14 FROM PLANNING PERMISSION FUL/2024/0058 - CONSULTATION BY NORFOLK COUNTY COUNCIL: Proposed new Standalone Specialist Resource Base (SRB) with increased parking area, cycle storage, alterations to internal site fencing, and alterations to soft and hard landscaping
-
24/01766/S37 Decided
Mill Bank Walpole Highway Norfolk PE14 7RA
CONSULTATION UNDER S37 OF THE ELECTRICITY ACT 1989: upgrading 15 spans of existing high voltage (HV) overhead line to 3-phase operation by installing an additional 3rd wire and replacing existing poles with like for like replacements in the same position.
-
24/01943/CM Granted
46 New Conduit Street King's Lynn KINGS LYNN Norfolk PE30 1DL
CM APPLICATION: Part retrospective application for the partial demolition of existing retail, parking and nightclub building. Change of use, alterations, deep retrofit/refurbishment into Multi User Community Hub (MUCH) to include new libraries (Use Class F1(d)), office (Use Class E(g)(i)), community and activity spaces (Use Class F2(b)). Alterations to building form include cladding to external facades, new roof profile, atrium and roof mounted PV arrays and rooflights and roof accessed plant equipment, landscaping, new cycle provision, and associated works: Norfolk County Council, Director of Property.
-
24/01780/CM Granted
Land To North of Riverside Business Centre Cross Bank Road King's Lynn Norfolk
COUNTY MATTERS - Revised Screening Request: On proposed variation to existing Anaerobic Digester Permission for Non-compliance with condition 1 (definition of approved scheme), condition 6 (working hours), condition 13a (annual feedstock limit) and condition 24 (daily HGV movements) of Borough Council of Kings Lynn and West Norfolk planning permission 23/02258/F to amend the throughput of the site, increase HGV movements, allow importation of food wastes, increase working hours during harvest periods and amendments to the admin building.
-
24/01696/CM Granted
Quarry East of Mill Drove William George Way Blackborough End Norfolk
COUNTY MATTERS APPLICATION - Non-compliance with conditions 2, 3, 10, 11 and 13 of permission reference C/2/2012/2015 to extend quarrying activites for a further 10 years and amend both the site's working and restoration schemes