Skip to content
PlanIndex Get alerts
Menu

Planning application

ARB/26/00803

12 Ellis Street, London, SW1X 9AL

Granted Kensington and Chelsea Prune

Proposal

Prune 1x London Plane (Platanus x hispanica)

As published by the council, reference ARB/26/00803

Timeline

Dates from the published record

  1. 12 Feb 2026

    Received by Kensington and Chelsea

  2. 9 Apr 2026

    Decision issued: Grant Planning Permission/Consent

  3. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Kensington and Chelsea is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • PP/21/03671 Granted

    162B Sloane Street, London, SW1X 9BS

    Refurbishment to front elevation including; installation of 2no. centralized non-illuminates fascia signage on stand-offs; installation of 3no, traditional awinings set within three display windows; installation of 2no. additional light fixtures to the pilasters either side of the main entrance to illuminate menu board; refresh decorative treatment to the fascia, window frames and timber paneling over stall risers, redecoration of surrounding ground floor pilasters and entrance masonry, entrance door to match window modules.

    3 Jun 2021 24m away Full applications
  • CA/21/03672 Granted

    162B Sloane Street, London, SW1X 9BS

    Installation of no.2 non-illuminated fascia mounted powder coated metal signage in gunmetal on standoffs; refurbishment to front elevation including; installation of 2no. centralized non-illuminates fascia signage on stand-offs; installation of 3no, traditional awinings set within three display windows; installation of 2no. additional light fixtures to the pilasters either side of the main entrance to illuminate menu board; refresh decorative treatment to the fascia, window frames and timber paneling over stall risers, redecoration of surrounding ground floor pilasters and entrance masonry, entrance door to match window modules.

    3 Jun 2021 24m away Advertising
  • LB/23/01437 Granted

    72 Cadogan Place, London, SW1X 9RP

    Replacement of two windows to rear elevation with slimline double glazed sash units as per approval on application LB/22/06813

    28 Feb 2023 24m away Heritage and listed buildings
  • PP/26/00039 Granted

    Flat 14, 9 Wilbraham Place, London, SW1X 9AE

    Provision of 2no.?external condenser units for Flat 14, 9 Wilbraham Place,?located?on the roof and housed within an acoustic enclosure.?Installation of 9no.?internal Fan Coil Units, 7no.?of which concealed within joinery and all connected to external units via refrigerant pipework.?

    20 Nov 2025 26m away Full applications
  • CA/25/04848 Granted

    160 Sloane Street, London, SW1X 9BT

    Installation of new shopfront non-illuminated fascia signage comprising central brand logo lettering and brand logo monogram either side. All manufactured from black painted metal.

    7 Aug 2025 31m away Advertising
  • PP/25/04847 Granted

    160 Sloane Street, London, SW1X 9BT

    Replacement of existing entrance doors, redecoration of shopfront and installation of new signage.

    7 Aug 2025 31m away Full applications