Skip to content
PlanIndex Get alerts
Menu

Planning application

ARB/26/00632

3 Priory Walk, London, SW10 9SP

Granted Kensington and Chelsea Part Fell Part Prune

Proposal

FELL 2x Camilla, 1x Willow, 1x Cherry

As published by the council, reference ARB/26/00632

Timeline

Dates from the published record

  1. 29 Dec 2025

    Received by Kensington and Chelsea

  2. 18 Apr 2026

    Decision issued: Raise No Objection

  3. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Kensington and Chelsea is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • PP/26/01792 Granted

    2 Priory Walk, London, SW10 9SP

    Replacement of the existing rear conservatory, relocation of the external garden stairs, replacement of existing windows with double glazed units, installation of roof mounted air conditioning units, and installation of roof lights at top floor level

    9 Apr 2026 0m away Full applications
  • PP/21/00528 Granted

    10 Priory Walk, London, SW10 9SP

    Erection of rear extension at ground floor level and at lower ground, together with formation of new basement room under garden.

    27 Jan 2021 0m away Full applications
  • PP/25/04922 Withdrawn

    2 Priory Walk, London, SW10 9SP

    Replacement of rear conservatory; moving external stairs in the garden; replacement of single glazed windows with double glazed units like-for-like at front and rear elevations; installation of air conditioning unit on the roof; and addtion of two roof lights

    12 Aug 2025 23m away Full applications
  • PP/26/02804 Withdrawn

    26 Gilston Road, London, SW10 9SS

    Removal of existing timber fencing to boundary walls and replacement with new masonry wall on top of existing masonry boundary walls, to match same height as existing timber fence.

    27 May 2026 36m away Full applications
  • PP/25/05566 Granted

    14 Cresswell Place, London, SW10 9RD

    Provision of AC condenser unit in acoustic housing with timber screens on the rear roof of first floor; replacement of entrance door and addition of new front portico

    12 Sep 2025 39m away Full applications
  • CON/25/06582 Granted

    15 The Boltons, London, SW10 9TD

    DOCUMENTS AND DRAWINGS ARE NOT AVAILABLE ELECTRONICALLY FOR THIS APPLICATION. PLEASE CALL THE CASE OFFICER. Details required by Condition 3(l) (Submission of details - inbuilt joinery) of listed building consent LB/24/05013 (Proposed internal alterations following approval of listed building consent LB/23/07421 to comprise: Lower Ground Floor: 1. Minor changes to internal door openings in LG.20 Shower Room. 2. Minor changes to internal door openings in LG.01 Gym. 3. Minor changes to internal door openings in LG.17 Storage. Ground Floor: No Changes. First Floor: 1. Minor changes to internal door opening into F.08 En-Suite 02. Second Floor: 1. Layout change in Guest Suite 3 and En-Suite 5. Third Floor: 1. Location of door opening changed in T.01 Staff Bedroom. 2. Minor changes to internal door openings into T.06 Powder Room. 3. Configuration of joinery and door openings into T.08 Storage. 4. Configuration of joinery and door openings into T.09 Storage)

    11 Nov 2025 46m away Conditions