Planning application
10 Upper Cheyne Row, London, SW3 5JN
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prune x 1 flowering cherry (front garden)
As published by the council, reference ARB/23/01112
Application record
- Reference
- ARB/23/01112
- Type
- Prune
- Status
- Decided
- Decision
- Granted As published: Raise No Objection
- Received
- 15 Feb 2023
- Validated
- 15 Feb 2023
- Decided
- 17 Mar 2023
- Ward
- Chelsea Riverside
- Parish
- 04
- Postcode
- SW3 5JN
Site history
Applications at this address on the Kensington and Chelsea register
This site has had 7 applications since 2023: 6 approved, 1 refused.
-
CON/26/02807 Granted
10 Upper Cheyne Row, London, SW3 5JN
Details required by condition 4 (submission of details - (a) sample of roof and wall tiles, including colour and finish;external alterations to front, side and rear elevations including changes to fenestration; roof alterations; installation of new letter box to front boundary wall; demolition of part single and part two-storey rear extension with roof terrace and erection of new part single storey and part two-storey rear extension.)
-
CON/26/01385 Granted
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 9 (Small-scale ground gas and vapour protection a) no development shall commence (other than demolition above ground level) until a Remediation Strategy (RS) [addressing radon protection measures, the issues identified within the Pollution Regulatory Team's advice to Planning dated 10 September 2024 regarding the GEA Desk Study and Ground Investigation Report dated 5 March 2024 Rev No 0 and other relevant issues within the CLC3 guidance], is submitted to, and approved in writing by, the local planning authority) of planning permssion PP/25/01143 (construction of single storey basement extension at front, side and rear of the dwelling)
-
CON/26/01325 Granted
10 Upper Cheyne Row, London, SW3 5JN
Details required by Conditions 6 (Considerate Constructors Scheme) and 10 (Construction Traffic Management Plan) of planning permission PP/25/01144 (Single storey basement extension to side and rear of dwelling; external alterations to front, side and rear elevations including changes to fenestration; roof alterations; installation of new letter box to front boundary wall; demolition of part single and part two-storey rear extension with roof terrace and erection of new part single storey and part two-storey rear extension)
-
CON/25/05388 Granted
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 4 (Considerate Constructors Scheme (CCS)) and 5 (Professional management of engineering works) of planning permission PP/25/01143 (Construction of single storey basement extension at front, side and rear of the dwelling)
-
CON/25/05390 Refused
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 9 (Small-scale ground gas and vapour protection) of planning permission PP/25/01143 (Construction of single storey basement extension at front, side and rear of the dwelling)
-
CON/25/05389 Granted
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 8 (Construction Traffic Management Plan (CTMP)) of planning permission PP/25/01143 (Construction of single storey basement extension at front, side and rear of the dwelling)
Timeline
Dates from the published record
-
15 Feb 2023
Received by Kensington and Chelsea
-
17 Mar 2023
Decision issued: Raise No Objection
-
3 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Tom Boswell Tree Services Ltd Applicant, a tree-works contractor registered in London
Active · incorporated 2008 · London
358 applications on PlanIndex · across 11 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Kensington and Chelsea granted permission on 17 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Kensington and Chelsea's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
14 Upper Cheyne Row, London, SW3 5JN
94% historically approved · decision due ~25 May
Extension at basement level, associated lightwell to front, demolition and replacement of rear extension, extension and bay window at rear first floor level, remodelling and extension of side extension, flat roof lights and extended dormer to roof , alteration to front boundary wall and gates, installation of AC unit within timber enclosure
Awaiting decision Full applications Extension Loft or dormer +2 50 docsSmall domestic -
10 Upper Cheyne Row, London, SW3 5JN
Details required by condition 4 (submission of details - (a) sample of roof and wall tiles, including colour and finish;external alterations to front, side and rear elevations including changes to fenestration; roof alterations; installation of new letter box to front boundary wall; demolition of part single and part two-storey rear extension with roof terrace and erection of new part single storey and part two-storey rear extension.)
Granted Conditions Extension Roofing +2 9 docsSmall domestic -
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 9 (Small-scale ground gas and vapour protection a) no development shall commence (other than demolition above ground level) until a Remediation Strategy (RS) [addressing radon protection measures, the issues identified within the Pollution Regulatory Team's advice to Planning dated 10 September 2024 regarding the GEA Desk Study and Ground Investigation Report dated 5 March 2024 Rev No 0 and other relevant issues within the CLC3 guidance], is submitted to, and approved in writing by, the local planning authority) of planning permssion PP/25/01143 (construction of single storey basement extension at front, side and rear of the dwelling)
Granted Conditions Extension Demolition 8 docsSmall domestic -
10 Upper Cheyne Row, London, SW3 5JN
Details required by Conditions 6 (Considerate Constructors Scheme) and 10 (Construction Traffic Management Plan) of planning permission PP/25/01144 (Single storey basement extension to side and rear of dwelling; external alterations to front, side and rear elevations including changes to fenestration; roof alterations; installation of new letter box to front boundary wall; demolition of part single and part two-storey rear extension with roof terrace and erection of new part single storey and part two-storey rear extension)
Granted Conditions Extension Roofing +2 8 docsSmall domestic -
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 4 (Considerate Constructors Scheme (CCS)) and 5 (Professional management of engineering works) of planning permission PP/25/01143 (Construction of single storey basement extension at front, side and rear of the dwelling)
Granted Conditions Extension 12 docsSmall domestic -
10 Upper Cheyne Row, London, SW3 5JN
Details required by Condition 9 (Small-scale ground gas and vapour protection) of planning permission PP/25/01143 (Construction of single storey basement extension at front, side and rear of the dwelling)
Refused Conditions Extension 10 docsSmall domestic