Planning application
13-15 The Little Boltons, London
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
FELL 1x Ash and 1x Oak and prune 1x Sweet Chestnut
As published by the council, reference ARB/22/02300
Application record
- Reference
- ARB/22/02300
- Type
- Part Fell Part Prune
- Status
- Decided
- Decision
- Raise No Objection
- Received
- 12 Apr 2022
- Validated
- 12 Apr 2022
- Decided
- 17 May 2022
- Ward
- Redcliffe
- Parish
- 15
Site history
Applications at this address on the Kensington and Chelsea register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
CON/21/04224 Granted
13-15 The Little Boltons, London
Details required by condition 4 (CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) of planning permission PP/20/07191 ( Introduction of car lift at lower ground floor / basement level; replacement of vehicular gates at front with sliding electric gates; division of storage areas at basement and lower ground floor levels; amendments to windows to rear at lower ground floor and minor amendment to sub-basement footprint (Additional plans).
Timeline
Dates from the published record
-
12 Apr 2022
Received by Kensington and Chelsea
-
17 May 2022
Decision issued: Raise No Objection
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Applicant on file, a tree-works contractor registered in Wimbledon
9 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Kensington and Chelsea granted permission on 17 May 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Kensington and Chelsea's portal will say. Our guide explains the common types.