Skip to content
PlanIndex Get alerts
Menu

Planning application

16 Lansdowne Walk, London, W11 3AH

Granted Kensington and Chelsea ARB/20/04000 Fell

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

FELL 1 x Magnolia (rear)

As published by the council, reference ARB/20/04000

Application record

Reference
ARB/20/04000
Type
Fell
Status
Decided
Decision
Raise No Objection
Received
20 Jul 2020
Validated
20 Jul 2020
Decided
27 Aug 2020
Ward
Norland
Parish
11
Postcode
W11 3AH

Site history

Applications at this address on the Kensington and Chelsea register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • CON/20/03946 Granted

    16 Lansdowne Walk, London, W11 3AH

    Details required by Condition 11 (Construction Traffic Management Plan (CTMP)) of planning permission PP/20/00806 (Redevelopment of site by demolition of existing building and erection of a replacement building for use as a single family dwelling house)

    Decided 11 Sep 2020 Conditions

Timeline

Dates from the published record

  1. 20 Jul 2020

    Received by Kensington and Chelsea

  2. 27 Aug 2020

    Decision issued: Raise No Objection

  3. 12 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Treemasters Ltd Applicant, registered in Epsom

Active · incorporated 1996 · Epsom

20 applications on PlanIndex · across 6 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Kensington and Chelsea granted permission on 27 August 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Kensington and Chelsea's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 16 Lansdowne Walk, London, W11 3AH

    CON/20/03946 Submitted 17 Jul 2020 0m away

    Details required by Condition 11 (Construction Traffic Management Plan (CTMP)) of planning permission PP/20/00806 (Redevelopment of site by demolition of existing building and erection of a replacement building for use as a single family dwelling house)

    Granted Conditions Demolition 11 docs
    Domestic
  • Land adjacent to 27 Lansdowne Walk, London, W11 3AW

    ARB/20/04108 Submitted 21 Jul 2020 34m away

    FELL 1 x Sycamore

    Granted 13 docs
  • 7 Lansdowne Road, London, W11 3AL

    ARB/26/00939 Submitted 4 Mar 2026 45m away

    Prune 1x Lime and 2x Maple

    Granted Trees 9 docs
  • 3-5 Lansdowne Road, London, W11 3AL

    PP/26/01515 Submitted 13 Feb 2026 45m away

    Partial demolition of the rear boundary wall along the side boundary with No.1 Lansdowne Road and its reconstruction as a low-level railway sleeper retaining wall with a slatted hit-and-miss timber fence above.

    Granted Full applications Demolition 15 docs
    Small domestic
  • 3 Lansdowne Road, London, W11 3AL

    ARB/21/04473 Submitted 8 Jul 2021 45m away

    Prune x5 as specified

    Granted Trees 11 docs
  • 1 Lansdowne Road, London, W11 3AL

    ARB/26/02841 Submitted 27 May 2026 45m away

    Prune (as specified) (rear)

    Granted Trees 4 docs