Skip to content
PlanIndex Get alerts
Menu

Planning application

55 Halton Road, London, N1 2EN

Awaiting decision Islington P2026/1291/FUL Full Planning Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of the existing white timber framed single glazed windows and door with new white double glazed aluminium framed windows.

As published by the council, reference P2026/1291/FUL

Application record

Reference
P2026/1291/FUL
Type
Full Planning Application
Status
FIRST STAGE REVIEW
Received
18 May 2026
Validated
14 Jul 2026
Ward
St Mary's & St James'
Postcode
N1 2EN

Timeline

Dates from the published record

  1. 18 May 2026

    Received by Islington

  2. 14 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. 7 Sep 2026

    Status changed to FIRST STAGE REVIEW

  5. Decision

    Awaiting decision

    Decision expected by 8 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Islington took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Islington for determination, against a statutory target of eight weeks. Over the last year Islington decided full applications in a median of 55 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Railings / Gates Outside Whiston House, Fronting Richmond Grove, London N1

    P2019/3329/FUL Submitted 6 Nov 2019 70m away

    Removal of existing metal gates and installation of replacement painted metal gates.

    Granted Full applications 9 docs
  • 72 Halton Road, London, N1 2AD

    P2026/0465/LBC Submitted 18 Feb 2026 83m away

    Erection of single storey part rear extension (following demolition of existing conservatory) with associated works including levelling of the rear garden and patio area and internal alterations (Full Planning Application ref: P2026/0464/FUL also submitted)

    Granted Heritage and listed buildings Extension Demolition 4 docs
    Small domestic
  • 72 Halton Road, London, N1 2AD

    P2026/0464/FUL Submitted 18 Feb 2026 83m away

    Erection of single storey part rear extension (following demolition of existing conservatory) with associated works including levelling of the rear garden and patio area and internal alterations (Listed building consent ref: P2026/0465/LBC also submitted)

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • Whiston House, 71 Halton Road, London

    P2025/1208/TRE Submitted 28 Apr 2025 91m away

    100% historically approved · decision due ~7 Jul

    Bingham Court TPO WORK T8 Sycamore: Remove dead wood. (Exempt work) T20 Flowering cherry: Trim to clear building by 1.5 - 2m. T22 False acacia: Reduce side growth to clear the building by 1.5 - 2m Alwyne Gardens TPO WORK T27 6 no. Limes; Trim basal epicormic growth. T36 Sycamore: Remove major dead wood - (exempt work) exempt T37 Sycamore: Remove major dead wood, shorten lateral growth shading the beech (T38) by up to 2m to give it more light. T39 Sycamore: Shorten lateral growth shading the beech by 2 - 3m to give it more light, remove major dead wood CONSERVATION AREA WORK T30 Gleditisia Shorten top growth to give a more balanced shape CA Alwyne Place TPO WORK T43 London plane: Reduce to former pruning points. (prev P2023/1108/TRE) CONSERVATION AREA WORK T42 Holm: oak Reduce to former pruning points. (prev P2023/1107/TRE) 2 Canonbury place CONSERVATION AREA WORK T64 Bay: Reduce back to former reduction points. Canonbury tower CONSERVATION AREA WORK T65 Bay: Trim lower growth to clear the walls and roof by 1.5 - 2m. T67 Wild cherry: Shorten side branches to clear the wall by 1.5 - 2m.

    Awaiting decision Trees 8 docs
  • 1, Braes Street, London, N1 2AB

    P2026/1312/TRE Submitted 21 May 2026 103m away

    T1 Sycamore (Acer pseudoplatanus) - Front garden - TPO protected Carry out a cr

    Granted Trees
  • 15, 16 & 17 Pleasant Place, London, N1 2BZ

    P2025/0675/FUL Submitted 10 Mar 2025 121m away

    86% historically approved · decision due ~13 May

    Construction of a roof extension with front roof terraces and front railings at third floor level to provide 1 x 2 bedroom flat.

    Awaiting decision Full applications Extension 8 docs

In Islington

  • P2026/2400/FUL Awaiting decision

    196 City Cloisters, Old Street, London, EC1V 9FR

    Installation of two dry riser inlets at ground floor level, to the Old Street el

    11 Sep 2026 Full applications
  • P2026/2394/FUL Awaiting decision

    25a, Prah Road, London, N4 2RB

    Alterations to the garden only of 25A Prah Road; including: removal of existing

    11 Sep 2026 Full applications
  • P2026/2345/FUL Awaiting decision

    Flat 1, 19 Dunford Road, London, N7 6EP

    Application for a Garden Room (retrospective)

    11 Sep 2026 Full applications
  • P2026/2385/FUL Awaiting decision

    34 Cloudesley Place, London, N1 0HZ

    Replacement of roof coverings, gutter linings and flashings [Listed Building Con

    10 Sep 2026 Full applications
  • P2026/2370/FUL Awaiting decision

    Flat C, 60 Seven Sisters Road, London, N7 6AA

    Loft conversion and rear dormer extension.

    8 Sep 2026 Full applications