Skip to content
PlanIndex Get alerts
Menu

Planning application

P2026/1013/FUL

Norton Lodge, 17 Harecourt Road, London, N1 2NE

Granted Islington Full Planning Application

Proposal

Replacement of windows from single-glazed Crittall windows to double-glazed steel windows.

As published by the council, reference P2026/1013/FUL

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Islington

  2. 26 May 2026

    Decision issued: Approve with conditions

  3. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2025/0180/TRE Awaiting decision

    15 Harecourt Road, London

    T1 Sumac of the MWA Arboricultural Report Works: Remove (fell) to near ground level and treat stump to inhibit regrowth. T2 Elder of the MWA Arboricultural Report Works: Remove (fell) to near ground level and treat stump to inhibit regrowth. T3 Eucalyptus of the MWA Arboricultural Report Works: Remove (fell) to near ground level and treat stump to inhibit regrowth. T4 Birch of the MWA Arboricultural Report Works: Remove (fell) to near ground level and treat stump to inhibit regrowth. Reason: Clay shrinkage subsidence damage at neighbouring property 14 & 14b Harecourt Road, N1 2LW. Works recommended to SG1 of the MWA Arboricultural report are not deemed to need the submission of a s.211 notification.

    21 Jan 2025 9m away Trees
  • P2025/2402/TRE Awaiting decision

    Basement Flat, 7 Harecourt Road, London, N1 2LW

    Tree location - rear garden Access - no side access T1 - Approx. H16 S12 65DBH Sycamore Crown reduce height and sides by 2-3m Thin 15% Deadwood Lift 5m T2 - Approx. H14 S8 50DBH Sycamore Crown reduce height and sides by 3-4m Thin 15% Deadwood Lift 5m T3 - Approx. H10 S6 50+DBH multi stem Conifer Fell as close as possible to ground level T4 - Approx. H12 S8 26DBH Cherry Crown reduce height by 2-3m Reduce laterals by 1-2m Thin 15% Deadwood Lift 3m

    21 Aug 2025 32m away Trees
  • P2025/1712/TRE Awaiting decision

    Basement Flat, 7 Harecourt Road, London, N1 2LW

    T1 - sycamore tree (15m) - remove main limb overhanging #8 back to main stem. T2 - cherry tree (6m) - reduce crown by approximately 1m. T3 - lime tree (18m) - remove epicormic shoots from base of tree. T4 - cypress tree (8m) - reduce height by approximately 2m.

    13 Jun 2025 32m away Trees
  • P2021/1670/TRE Granted

    1 Harecourt Road, London, N1 2LW

    Front garden (TPO ref. T1-T3 of TPO 336/2007) (T1-T3) 3 x Lime Trees - overall growth reduction to previous outermost pruning points (approx. 2m branch length). On building side crown reduce to create approx. 3m clearance from the building. Removal of basal & epicormic growth. N.B. Pruning not to extend below most recent crown reduction points

    8 Jun 2021 45m away Trees
  • P2026/1796/TRE Awaiting decision

    1 Harecourt Road, London, N1 2LW

    All works as per per previous consents (application no P2018/3003/TRE, P2021/1670/TRE and P2023/2587) 3 x Lime Trees - overall growth reduction to previous outermost pruning points (approx 2m branch length). On building side reduce to approx 3m branch length (including removal of side branches to approx 100mm diameter to inner pruning points) to create 3m clearance from building . Removal of basal & epicormic growth. Reasons for work: branches sweeping residents' windows, banging in the wind and blocking out significant amount of natural light.

    7 Jul 2026 45m away Trees
  • P2024/2523/FUL Granted

    Second Floor Flat, 27 Harecourt Road, London, N1 2LW

    Replacement of existing timber single glazed door and double doors located at second floor side elevation with timber doors vacuum glazed doors.

    21 Aug 2024 74m away Full applications

In Islington

  • P2026/1970/FUL Awaiting decision

    Garages G12 - 13, Brooksby Mews, London, N1 1EZ

    External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.

    24 Jul 2026 Full applications
  • P2025/1883/FUL Granted

    68 - 70 and 60 Goswell Road, London, EC1M 7AD

    Comprehensive refurbishment of two existing buildings, comprising façade alterations, roof extensions incorporating new terrace space with metal balustrades, installation of photovoltaic (PV) panels, provision of new plant areas with screening, installation of new shopfronts and associated alterations.

    1 Jul 2025 Full applications
  • P2026/1227/FUL Refused

    Flat C, 80 Birnam Road, London, N4 3LQ

    Erection of L shaped rear dormer roof extension, installation of 2 front rooflights and new windows to rear elevation

    11 May 2026 Full applications
  • P2026/1352/FUL Granted

    7-13 & 15-21 Wakeham Street, London, N1 3HP

    Replacement of single glazed crittal windows with double glazed steel windows to front, side and rear elevations.

    26 May 2026 Full applications
  • P2026/1910/FUL Awaiting decision

    25 Amwell Street, London, EC1R 1UN

    Change of use of the building from an education use (Use Class F1) to a new office, training and collaborative spaces and networking areas (Sui Generis) along with the provision of cycle parking, external plant and other associated works. Removal of modern finishings and fittings; new flooring, lighting and finishes; repair and restoration of historic partitions; refurbishment of joinery and other historic features; overhaul and upgrading of windows and installation of secondary glazing; redecoration; new power lighting and ventilation; retention of historic plaque (internal); minor works to garden including cycle shed and lighting; install M and E and loft insulation, internal lift, ramped access at front [Listed Building Consent P2026/1911/LBC also submitted].

    17 Jul 2026 Full applications