Skip to content
PlanIndex Get alerts
Menu

Planning application

P2026/0022/FUL

Flat 1, 19 Stonefield Street, London, N1 0HW

Granted Islington Full Planning Application

Proposal

Replacement of rear ground floor window with sliding sash window, reduced window opening to closet wing and replacement double glazed sash window, replacement vacuum glazing to existing lower ground floor windows. Repairs and repointing of front and rear elevations in lime mortar. Internal works including replacement of lower ground floor structural slab with insulation, membrane tanking system and associated linings. Replacement kitchen and bathroom with minor wall alterations. Levelling and re-flooring of raised ground floor, minor wall layout changes to closet wing with thermal improvements, reopening of chimney breasts at lower ground floor, and replacement of all internal doors, frames and rear external door. [Listed Building Consent P2026/0023/LBC also submitted].

As published by the council, reference P2026/0022/FUL

Timeline

Dates from the published record

  1. 5 Jan 2026

    Received by Islington

  2. 9 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 May 2026

    Decision issued: Approve with conditions

  4. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2026/0023/LBC Granted

    Flat 1, 19 Stonefield Street, London, N1 0HW

    Replacement of rear ground floor window with sliding sash window, reduced window opening to closet wing and replacement double glazed sash window, replacement vacuum glazing to existing lower ground floor windows. Repairs and repointing of front and rear elevations in lime mortar.Internal works including replacement of lower ground floor structural slab with insulation, membrane tanking system and associated linings. Replacement kitchen and bathroom with minor wall alterations. Levelling and re-flooring of raised ground floor, minor wall layout changes to closet wing with thermal improvements, reopening of chimney breasts at lower ground floor, and replacement of all internal doors, frames and rear external door. [Full Plan application P2026/0022/FUL also submitted].

    5 Jan 2026 0m away Heritage and listed buildings
  • P2026/1501/LBC Awaiting decision

    FLAT 3 20 STONEFIELD STREET LONDON N1 0HW

    Listed building consent for works completed in August 2025 for the replacement of an existing gas boiler and flue with a new gas boiler and flue (to the rear elevation).

    9 Jun 2026 8m away Heritage and listed buildings
  • P2025/1701/TRE Awaiting decision

    13 - 14, Flat 5, Stonefield Street, London, N1 0HW

    Large Ailanthus - Crown reduce the height by 6.0m Crown reduce the spread by branch lengths of up to 6.0m to balance and shape Crown thin by 10% Maintenance works in line with good arboricultural practice

    11 Jun 2025 31m away Trees
  • P2026/1705/LBC Awaiting decision

    173 Liverpool Road, London, N1 0RF

    Demolish existing single storey conservatory extension and build new single storey conservatory extension; form openings for new door and internal glazed screen at base of lower ground floor stairs; replace engineered timber floor coverings to lower ground floor with engineered timber floor; take up rear patio paving and lay new; make isolated repairs to masonry and pointing [Full planning application P2026/1704/FUL also submitted].

    29 Jun 2026 38m away Heritage and listed buildings
  • P2026/1704/FUL Awaiting decision

    173 Liverpool Road, London, N1 0RF

    Demolish of existing single storey conservatory extension anderection of new single storey conservatory extension. Formation of openings for new door and internal glazed screen at base of lower ground floor stairs and replacement of engineered timber floor coverings to lower ground floor with engineered timber floor. Re paving of rear patio and isolated repairs to masonry and pointing [Listed Building Consent P2026/1705/LBC also submitted].

    29 Jun 2026 38m away Householder
  • P2022/3699/LBC Granted

    7 and 8 Stonefield Street, London, N1 0HP

    Joint application for removal of rear stairs leading into rear garden of no. 7 Stonefield Street, retention of the existing first floor staircase landings to the rear of no. 7 and 8 Stonefield Street to create balconies with associated structural support and balustrades and rebuilding of boundary wall between the two properties. [Full application P2022/3663/FUL also submitted

    14 Oct 2022 39m away Heritage and listed buildings

In Islington

  • P2026/1970/FUL Awaiting decision

    Garages G12 - 13, Brooksby Mews, London, N1 1EZ

    External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.

    24 Jul 2026 Full applications
  • P2025/1883/FUL Granted

    68 - 70 and 60 Goswell Road, London, EC1M 7AD

    Comprehensive refurbishment of two existing buildings, comprising façade alterations, roof extensions incorporating new terrace space with metal balustrades, installation of photovoltaic (PV) panels, provision of new plant areas with screening, installation of new shopfronts and associated alterations.

    1 Jul 2025 Full applications
  • P2026/1227/FUL Refused

    Flat C, 80 Birnam Road, London, N4 3LQ

    Erection of L shaped rear dormer roof extension, installation of 2 front rooflights and new windows to rear elevation

    11 May 2026 Full applications
  • P2026/1352/FUL Granted

    7-13 & 15-21 Wakeham Street, London, N1 3HP

    Replacement of single glazed crittal windows with double glazed steel windows to front, side and rear elevations.

    26 May 2026 Full applications
  • P2026/1910/FUL Awaiting decision

    25 Amwell Street, London, EC1R 1UN

    Change of use of the building from an education use (Use Class F1) to a new office, training and collaborative spaces and networking areas (Sui Generis) along with the provision of cycle parking, external plant and other associated works. Removal of modern finishings and fittings; new flooring, lighting and finishes; repair and restoration of historic partitions; refurbishment of joinery and other historic features; overhaul and upgrading of windows and installation of secondary glazing; redecoration; new power lighting and ventilation; retention of historic plaque (internal); minor works to garden including cycle shed and lighting; install M and E and loft insulation, internal lift, ramped access at front [Listed Building Consent P2026/1911/LBC also submitted].

    17 Jul 2026 Full applications