Skip to content
PlanIndex Get alerts
Menu

Planning application

90 Plimsoll Road, London, N4 2EE

Granted Islington P2025/0147/FUL Full Planning (Householder)

Works: Extension Loft or dormer Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a mansard roof extension with dormer windows to front/rear elevations and a rooflight.

As published by the council, reference P2025/0147/FUL

Application record

Reference
P2025/0147/FUL
Type
Full Planning (Householder)
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approve with conditions
Received
16 Jan 2025
Validated
23 Jan 2025
Decided
14 Mar 2025
Ward
Arsenal
Decision by
Delegated
Postcode
N4 2EE

Site history

Applications at this address on the Islington register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • P2025/0141/FUL Granted

    90 Plimsoll Road, London, N4 2EE

    Erection of a single storey side infill extension, replacement of the front roof lights and additional window on the first-floor outrigger following removal of flank window to the rear outrigger.

    Decided 7 Mar 2025 Householder

Timeline

Dates from the published record

  1. 16 Jan 2025

    Received by Islington

  2. 23 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 14 Mar 2025

    Decision issued: Approve with conditions

  4. 22 Nov 2026

    Added to PlanIndex

Documents

9 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Islington granted permission on 14 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 90A Plimsoll Road N4 2EE & 78 Gillespie Road N5 1LN

    P2025/2917/FUL Submitted 15 Oct 2025 50 yards away

    88% historically approved · decision due ~21 Jan

    Erection of infill extension in the communal yard, floorplan alterations, installation of rooflights and amendments to fenestration (part retrospective).

    Awaiting decision Full applications Extension Loft or dormer +1 8 docs
  • 90 Plimsoll Road, London, N4 2EE

    P2025/0141/FUL Submitted 15 Jan 2025 50 yards away

    Erection of a single storey side infill extension, replacement of the front roof lights and additional window on the first-floor outrigger following removal of flank window to the rear outrigger.

    Granted Householder Extension Loft or dormer +1 9 docs
    Small domestic
  • 76A Gillespie Road, London, N5 1LN

    P2026/2777/FUL Submitted 21 Oct 2026 50 yards away

    88% historically approved · decision due ~16 Dec

    Alterations to facade to install french doors in place of existing window and new fence to rear of property between No.76 and 78.

    Awaiting decision Full applications Windows or glazing 10 docs
    Small domestic
  • Flat 3, 86 Gillespie Road, London, N5 1LN

    P2023/0955/COL Submitted 3 Apr 2023 50 yards away

    Self contained flat (flat 3) - Certificate of lawfulness (Existing)

    Granted Lawful development 10 docs
  • 97 Plimsoll Road, London, N4 2EB

    P2021/2404/COLP Submitted 16 Aug 2021 50 yards away

    Certificate of Lawfulness (Proposed) in connection with the erection of a roof extension above the rear outrigger.

    Granted Lawful development Extension 9 docs
  • 89 Plimsoll Road, London, N4 2EB

    P2021/2008/FUL Submitted 9 Jul 2021 50 yards away

    Erection of a single storey side infill extension.

    Granted Householder Extension 5 docs
    Small domestic

In Islington

  • P2026/2390/FUL Granted

    67 Leconfield Road, London, N5 2RZ

    Alterations to rear elevation openings and replacement of roof of existing LGF extension.

    Received 10 Sep, published by the council 15 Sep 2026 Householder
  • P2026/2512/FUL Granted

    30 Baring Street, London, N1 3DJ

    Replacement windows and front entrance door.

    Received 23 Sep, published by the council 29 Sep 2026 Householder
  • P2026/2307/FUL Granted

    20 Canonbury Park South, London, N1 2JJ

    Erection of a single storey rear lower ground floor extension, new rear window at ground floor level, installation of air conditioning unit and enclosure to rear garden

    Received 1 Sep, published by the council 11 Sep 2026 Householder
  • P2026/2356/FUL Granted

    65 Ripplevale Grove, London, Islington, N1 1HS

    Installation of stairs within front lightwell and new entrance gate at street level

    Received 7 Sep, published by the council 29 Sep 2026 Householder
  • P2026/1955/FUL Granted

    4 Highbury Terrace, London, N5 1UP

    Erection of a single-storey rear extension; erection of an ancillary outbuilding within the rear garden; replacement of existing windows; refurbishment and upgrading of the existing roof; and internal alterations to all floors, including associated reconfiguration of layouts and ancillary works (Listed Building Consent P2026/1956/LBC also submitted)

    Received 22 Jul, published by the council 31 Jul 2026 Householder