Planning application
53 Essex Road, London, N1 2SF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from auction house (Sui Generis) to Retail (Use Class E (a)).
As published by the council, reference P2024/2518/FUL
Application record
- Reference
- P2024/2518/FUL
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 20 Aug 2024
- Validated
- 25 Sep 2024
- Decided
- 31 Jan 2025
- Ward
- St Mary's & St James'
- Decision by
- Delegated
- Postcode
- N1 2SF
Timeline
Dates from the published record
-
20 Aug 2024
Received by Islington
-
25 Sep 2024
Validated
Checked as complete and ready for consideration.
-
31 Jan 2025
Decision issued: Approve with conditions
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 31 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
45 Essex Road, Islington, London, N1 2SF
Application for a Lawful Develolpment Certificate (Existing) as residential use of four flats on upper floors.
Refused Lawful development New dwelling 7 docsSeveral homes -
120 - 136, Camley Street, London, N1C 4PG
90% historically approved · decision due ~13 Feb
Observations on Demolition of all existing buildings (Class B2) and structures and associated works and erection of new buildings comprising a mixed-use redevelopment of residential (Class C3) and commercial (Class E) uses, together with all landscaping, public realm, cycle parking, car parking, highways works and associated works (see associated application ref. 2025/4364/P at 3-30 Cedar Way). (Re-consultation due to publication of Environmental Statement addendum).
Awaiting decision Demolition -
Gough House, 1 Windsor Street, London, N1 8QA
Certificate of Lawfulness (proposed) for the installation of low-level play equi
Granted Lawful development -
Pavement outside 54, Essex Road, London
86% historically approved · decision due ~26 Jun
The proposed installation of a BT Streethub (Unit 3) incorporating 75' digital advert screens. (Advertisement consent P2026/1111/ADV also submitted)
Awaiting decision Full applications 15 docs -
Pavement outside 54, Essex Road, London
74% historically approved · decision due ~26 Jun
the proposed installation of a BT Streethub (Unit 3) incorporating 75' digital advert screens. (Full application P2026/1110/FUL also submitted)
Awaiting decision Advertising -
Pavement outside 54 Essex Road, London, N1 8LR
Removal of two existing telephone kiosks and the proposed installation of a BT S
Refused Full applications
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d