Planning application
5 Charterhouse Square, London, EC1M 6PX
Relates to P2021/1520/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of CCTV camera at the main entrance (Full planning application P2021/1520/FUL also submitted)
As published by the council, reference P2021/1864/LBC
Application record
- Reference
- P2021/1864/LBC
- Type
- Listed Building
- Status
- Granted As published: FINAL DECISION
- Decision
- Granted As published: Approve with conditions
- Received
- 28 Jun 2021
- Validated
- 28 Jun 2021
- Decided
- 25 Aug 2021
- Ward
- Bunhill
- Decision by
- Delegated
- Postcode
- EC1M 6PX
Site history
Applications at this address on the Islington register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
P2021/1520/FUL Granted
5 Charterhouse Square, London, EC1M 6PX
Installation of CCTV camera at the main entrance (Listed building consent P2021/1864/LBC also submitted)
Timeline
Dates from the published record
-
28 Jun 2021
Received by Islington
-
25 Aug 2021
Decision issued: Approve with conditions
-
28 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
P2021/1520/FUL Granted
5 Charterhouse Square, London, EC1M 6PX
Installation of CCTV camera at the main entrance (Listed building consent P2021/1864/LBC also submitted)
1 later application on the register refers to this one:
-
P2021/1520/FUL Granted
5 Charterhouse Square, London, EC1M 6PX
Installation of CCTV camera at the main entrance (Listed building consent P2021/1864/LBC also submitted)
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 25 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
5 Charterhouse Square, London, EC1M 6PX
Installation of CCTV camera at the main entrance (Listed building consent P2021/1864/LBC also submitted)
Granted Full applications 13 docs -
32, Florin Court, 6 - 9 Charterhouse Square, London, EC1M 6EU
Approval of Details pursuant to condition 3 of planning application ref: P2024/0128/LBC
Granted Conditions 7 docs -
7 - 8 Carthusian Street, London EC1M 6EB
Replacement of existing fascia signage and hanging sign.
Granted Advertising -
7 - 8 Carthusian Street London EC1M 6EB
Consultation by the London Borough of Islington for the replacement of existing fascia signage and hanging sign (LBI Ref.P2025/3303/ADV) .
Granted 2 docs -
42 - 43 Charterhouse Square London EC1M 6EW
100% historically approved · decision due ~2 Mar
Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission 24/00155/FULL dated 02/07/2024.
Awaiting decision Conditions Demolition 14 docs -
Second Floor Flat 42 Charterhouse Square London EC1M 6EA
Replacement of 3no. casement windows at second floor flats, at the rear elevation.
Granted Full applications New dwelling Windows or glazing 15 docs
Other heritage and listed building applications
In Islington
-
P2026/2302/LBC Granted
32, 34, 36 & 38, Amwell Street, London, EC1R 1XT
Replacement of internal flat entrance doors, architraves and fanlights, install
-
P2026/2220/LBC Granted
34, SUDELEY STREET, LONDON, ISLINGTON, N1 8HW
Retrospective Listed Building Consent application for reroofing the front 'butt
-
P2026/2272/LBC Granted
355 St John Street, London, EC1V 4LB
Replacement of internal flat entrance doors, architraves and fanlights, install
-
P2026/2309/LBC Granted
27 Barnsbury Park, London, N1 1HQ
Replacement of internal flat entrance doors, architraves and fanlights, install
-
P2026/2597/LBC Awaiting decision
28, Gerrard Road, London, N1 8BA
The replacement of fittings and reorganisation of first floor bathroom, the adj