Skip to content
PlanIndex Get alerts
Menu

Planning application

Clock House, 7 Brewery Square, London, EC1V 4LE

Granted Islington P2019/3348/FUL Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External refurbishment, repairs to the historic clock mechanism removing the current electric motor, introduction of a discrete slot drain at the front door, the replacement of the external lights to either side of the front entrance door and the addition of antique brass video entry panel adjacent to front entrance door. New access stair to the second floor terrace via the rear first floor corridor, increase the size of 2 No. apertures on the rear elevation, amend the existing bedroom layout on the second floor, replace existing modern timber doors at ground floor level, remove the existing modern door adjacent to the kitchen at ground floor level and introduce 2 kitchen extract fans at roof level at the location of the current chimney to the south.

As published by the council, reference P2019/3348/FUL

Application record

Reference
P2019/3348/FUL
Type
Full Planning Application
Status
FINAL DECISION
Decision
Approve with conditions
Received
7 Nov 2019
Validated
7 Nov 2019
Decided
23 Dec 2019
Ward
Bunhill
Decision by
Delegated
Postcode
EC1V 4LE

Timeline

Dates from the published record

  1. 7 Nov 2019

    Received by Islington

  2. 23 Dec 2019

    Decision issued: Approve with conditions

  3. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Clock House, 7 Brewery Square, London, EC1V 4LE

    P2019/3422/LBC Submitted 7 Nov 2019 0m away

    External refurbishment, repairs to the historic clock mechanism removing the current electric motor, introduction of a discrete slot drain at the front door, the replacement of the external lights to either side of the front entrance door and the addition of antique brass video entry panel adjacent to front entrance door. New access stair to the second floor terrace via the rear first floor corridor, increase the size of 2 No. apertures on the rear elevation, amend the existing bedroom layout on the second floor, replace existing modern timber doors at ground floor level, remove the existing modern door adjacent to the kitchen at ground floor level and introduce 2 kitchen extract fans at roof level at the location of the current chimney to the south.

    Granted Heritage and listed buildings 4 docs
  • Flat 3.2, 150 Cannon Brewery Apartments, St John Street, London, EC1V 4PS

    P2026/1098/LBC Submitted 27 May 2026 8m away

    Installation of a single domestic air-conditioning system with heat pump.

    Granted Heritage and listed buildings
  • Flat 3.2, 150 Cannon Brewery Apartments, St John Street, London, EC1V 4PS

    P2026/1081/FUL Submitted 27 May 2026 8m away

    Installation of a single domestic air-conditioning system with heat pump.

    Granted Full applications
  • 152 St John Street, London, EC1V 4UD

    P2026/1957/LBC Submitted 22 Jul 2026 14m away

    93% historically approved · decision due ~16 Sep

    Replacement pendant lighting, suspended and ceiling mounted track lighting, deco

    Status unknown Heritage and listed buildings
  • 8, Brewery Square, London, EC1V 4LE

    P2026/2180/FUL Submitted 1 Sep 2026 31m away

    92% historically approved · decision due ~28 Oct

    Installation of a retractable glazed canopy to the rear courtyard and associate

    Status unknown Householder Windows or glazing
    Domestic
  • Flat 69, Dickinson Court, 15 Brewhouse Yard, London, EC1V 4JX

    P2026/0032/FUL Submitted 12 Jan 2026 49m away

    86% historically approved · decision due ~9 Mar

    Installation of a rooftop pavilion to private roof terrace and refurbishments to

    Status unknown Full applications

In Islington

  • P2026/2205/FUL Status unknown

    Flat 3, 8 Birnam Road, London, N4 3LQ

    Erection of a rear dormer roof extension and a rear roof terrace with a railing

    4 Sep 2026 Full applications
  • P2026/1941/FUL Status unknown

    Flat A, 10 Loraine Road, London, N7 6EZ

    Replacement of an existing external step to access the rear garden.

    3 Sep 2026 Full applications
  • P2026/1722/FUL Refused

    Pavement outside 2-4 Archway Close, London, N19 3TD

    The proposed deployment of a Street Hub 3 unit with associated digital advertise

    13 Jul 2026 Full applications
  • P2026/2280/FUL Status unknown

    Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR

    A new secondary access gate adjacent to the Community Room at Margery Street Com

    3 Sep 2026 Full applications
  • P2026/1507/FUL Granted

    Ground Floor, 257 Caledonian Road, London, N1 1ED

    Alterations to shopfront including new aluminium-composite panels to integrate d

    9 Jun 2026 Full applications