Planning application
53-61, TABERNACLE STREET, EC2
Works: New dwelling Extension Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from B1 (part vacant) to seven live work units, eight flats and A1/B1/A2 floorspace of 1706m2; general refurbishment of 53 and 55-61; construction of part two storey/part three storey roof extensions. APPLICANTS' PLAN NOS.: Site Location Plan 0017/001-007 (Cons.); 0017/101; 0017/103; 0017/105; 0017/106; 0017/102 Rev.A; 0017/104A; Letter from MEBP 29th January 2002.
As published by the council, reference P012692
Application record
- Reference
- P012692
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 11 Dec 2001
- Validated
- 1 Feb 2002
- Decided
- 16 Apr 2002
- Ward
- X-Bunhill
- Decision by
- Delegated
Site history
Applications at this address on the Islington register
This site has had 3 applications since 2000: 3 approved, 0 refused.
-
P012693 Granted
53-61, TABERNACLE STREET, EC2
Partial demolition of rear of 55-61 Tabernacle Street in connection with planning proposals Ref.: P012692. APPLICANTS' PLAN NOS.: Site Location Plan 0017/001-007 (Cons.)
-
P002148 Granted
53-61, TABERNACLE STREET, EC2
Refurbishment of existing buildings; construction of part three storey/part two storey roof extensions all for Business (B1) use APPLICANT'S PLAN NOS.: Site location plan; 0017/001-008; 0017/011B, 012B, 013B, 014B, 015B, 016B, sightline study 12/12/00
Timeline
Dates from the published record
-
11 Dec 2001
Received by Islington
-
1 Feb 2002
Validated
Checked as complete and ready for consideration.
-
16 Apr 2002
Decision issued: Approve with conditions
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 16 April 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d