Skip to content
PlanIndex Get alerts
Menu

Planning application

39, AMWELL STREET, EC1

Granted Islington P012619 Listed Building

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Fitting of railing to parapet of rear extension and installation of metal spiral stair linking it to rear part of garden and internal refurbishment work. APPLICANTS' PLAN NOS. 390/001 AND 002B

As published by the council, reference P012619

Application record

Reference
P012619
Type
Listed Building
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Approve with conditions
Received
7 Nov 2001
Validated
7 Nov 2001
Decided
6 Mar 2002
Ward
X-Clerkenwell
Decision by
Delegated

Site history

Applications at this address on the Islington register

This site has had 3 applications since 2001: 3 approved, 0 refused.

  • P020585 Granted

    39, AMWELL STREET, EC1

    Approval of details (ventilation) pursuant to condition 3 of Listed Building Consent Ref: P012619 dated 07/03/2002. APPLICANTS' PLAN NOS.: Proposed first floor plan and letter D.R. Yeaman to Islington Council 11th March 2002.

    Decided 26 Apr 2002 Heritage and listed buildings
  • P012618 Granted

    39, AMWELL STREET, EC1

    Fitting of railing to parapet of rear extension and installation of metal spiral stair linking it to rear part of garden. APPLICANTS' PLAN NOS.: 390/001 AND 002B

    Decided 6 Mar 2002 Full applications

Timeline

Dates from the published record

  1. 7 Nov 2001

    Received by Islington

  2. 6 Mar 2002

    Decision issued: Approve with conditions

  3. 25 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Islington granted permission on 6 March 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Islington

  • P2026/2302/LBC Granted

    32, 34, 36 & 38, Amwell Street, London, EC1R 1XT

    Replacement of internal flat entrance doors, architraves and fanlights, install

    Received 1 Sep, published by the council 7 Sep 2026 Heritage and listed buildings
  • P2026/2220/LBC Granted

    34, SUDELEY STREET, LONDON, ISLINGTON, N1 8HW

    Retrospective Listed Building Consent application for reroofing the front 'butt

    Received 17 Aug, published by the council 24 Aug 2026 Heritage and listed buildings
  • P2026/2272/LBC Granted

    355 St John Street, London, EC1V 4LB

    Replacement of internal flat entrance doors, architraves and fanlights, install

    Received 27 Aug, published by the council 7 Sep 2026 Heritage and listed buildings
  • P2026/2309/LBC Granted

    27 Barnsbury Park, London, N1 1HQ

    Replacement of internal flat entrance doors, architraves and fanlights, install

    Received 2 Sep, published by the council 7 Sep 2026 Heritage and listed buildings
  • P2026/2597/LBC Awaiting decision

    28, Gerrard Road, London, N1 8BA

    The replacement of fittings and reorganisation of first floor bathroom, the adj

    Received 1 Oct, published by the council 5 Oct 2026 Heritage and listed buildings