Planning application
1, ST JOHNS PATH & REAR OF 58 BRITTON STREET, EC1
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redevelopment of 1-2 St. John's Path to create a Class B1 office building (373m2 gross). Formation of a new fourth floor on the building at the rear of 58 Britton Street and conversion of that building to form a live-work unit in the combined ground, first and second floors and a one bedroom maisonette in the combined third and new fourth floors. APPLICANTS' PLAN NOS.: HB558/1(101)100A dated February 2002, HB-558(101)101B and 102B HB558/103, 110, 111A, 112, 120, 121 and 122.
As published by the council, reference P012534
Application record
- Reference
- P012534
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 5 Dec 2001
- Validated
- 25 Feb 2002
- Decided
- 22 Apr 2002
- Ward
- X-Clerkenwell
- Decision by
- Delegated
Site history
Applications at this address on the Islington register
This site has had 2 applications since 2001: 2 approved, 0 refused.
-
P012535 Granted
1, ST JOHNS PATH & REAR OF 58 BRITTON STREET, EC1
Demolition of existing buildings. APPLICANTS' PLAN NOS.: HB558 1(00) 001, 100-104, 110-115, 120-123 Method statement of 7th December 2001 (reference 101428/GRH) and attached sketch drawings 101428/skA and skB.
Timeline
Dates from the published record
-
5 Dec 2001
Received by Islington
-
25 Feb 2002
Validated
Checked as complete and ready for consideration.
-
22 Apr 2002
Decision issued: Approve with conditions
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 22 April 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d