Planning application
77, ABERDEEN ROAD, N5
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension at basement level to provide store room.
As published by the council, reference P011681
Application record
- Reference
- P011681
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 3 Aug 2001
- Validated
- 16 Aug 2001
- Decided
- 5 Oct 2001
- Ward
- X-Quadrant
- Decision by
- Delegated
Site history
Applications at this address on the Islington register
This site has had 5 applications since 2000: 3 approved, 2 refused.
-
P011911 Refused
77, ABERDEEN ROAD, N5
Installation of two level car hoist to park two vehicles below ground level. APPLICANTS' PLAN NOS.: 4858/35, 31
-
P011040 Granted
77, ABERDEEN ROAD, N5
Excavation of basement to side of the existing building to form a utility/w.c./cellar/bike store and a new front gate to the Northolme Road frontage. APPLICANTS' PLAN NOS.: Letters dated 29th May, 2001 and 7th June, 2001 4858/30/A, 31, 32
-
P010481 Refused
77, ABERDEEN ROAD, N5
Installation of car hoist mechanism beneath existing driveway to provide on site car parking for the vehicles at basement and ground levels
-
P002245 Granted
77, ABERDEEN ROAD, N5
Excavation of basement and front lightwell with glazing over (to Northholme Road frontage). APPLICANTS' PLAN NOS.: 4858/1A, 2, 22, 23, 24
Timeline
Dates from the published record
-
3 Aug 2001
Received by Islington
-
16 Aug 2001
Validated
Checked as complete and ready for consideration.
-
5 Oct 2001
Decision issued: Approve with conditions
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 5 October 2001, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d